Loading...
HomeMy WebLinkAboutWQ0045266_Application_20240402P4c 0CP1 Of ! rviro;,t,���1ai f ;tiil�Ii�i State of North Carolina `1 Department of Environmental Quality Division of Water Resources F APR 2 ZOi 1iAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 10-23 & SUPPORTING DOCUMENTATION Raleifill "j- Application Number: (W oc)5K Z (020(to be completed by DWR) All items must be completed or the application will be returned 1. APPLICANT INFORMATION: I . Applicant's name: Chatham Park Investors LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ StatclCounty ❑ Municipal ® Other 3. Signature authority's name: Timothy R. Smith per 15A NCAC 02T .0106(b) Title: Vice President 4. Applicant's mailing address: 105 Weston Estates Wa City: Cary State: NC Zip: 27513- ..... 5. Applicant's contact information: Phone number: (919) 481-3000 Email Address: Robin@prestondev.com II. PROJECT INFORMATION: I . Project name. Chatham Park Section 6.2 Phase I S 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: . For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Chatham Coun 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.7370731 Longitude:-79.1461 17 5. Parcel ID (if applicable): 66937: 94479, 71493 (or Parcel ID to closest downstream sewer) 111. CONSULTANT INFORMATION: 1. Professional Engineer: Christopher L. Freshour, PE License Number: 054.280 Firm: WithersRavenel, Inc. Mailing address: 115 MacKenan Drive City: C rU State: NC Zip: 2751 1- Phone number: (919) 238-0329 Email Address: cfreshour(@withersravenel.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Chatham Park Water Recovcry Center Permit Number: NCO020354 Owner Name: Chatham Park Investors LLC V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ0043641 to PS W00042824 2. Downstream (Receiving) Sewer Information: 8 inch DA Gravity 0 Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00146 Owner Name(s): Town of Pittsboro FORM: FTA 10-23 Page I of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? [—]Yes ❑ No ® N.-'A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement �FOR'M: DFV) been attached? ❑ Yes ❑ No ®N/A 3. If the Applicant is a Home;`Property Owners' Association, has an HOA'POA Operational Agrvgnicnt (FORM. HOA) and supplementary documentation as required by 15A NCAC 02T.01 15(c) been attached? [—]Yes [—]No ON'A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, mails) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School ! preschool I day care ❑ Medical r dental ,' veterinary facilities ❑ Swimming PooVCIubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses I offices 1 factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 °-o Domestic _ % Commercial % Industrial (See 15A Nt-A(." 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect ❑ Yes❑ No 6. Has a flow reduction been approved under 15A NCAC 02T ,01 14(f)? ® Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow wb No. of Units Flow gall 0 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Tota! 0 GPD a See 15A NCAC 02T ,01 14(b), (d), (e)(l) and JcX2 i for caveats to wastewater design flow rates (i.e. proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. $. Wastewater generated by project: 0 GPD (per 15A NCAC 02Ts01.14 and G,.S_ 143-21 l) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent pen -nits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: ._ Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ® Other (Explain): Permittinna zero flew m~r direction from DWR. Qnee_downstream infrastructure has been certified, a modification for the flow allocation will be submitted. FORM: FTA 10-23 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 1,519 PVC ➢ Section 11 & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VI I L PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: _,_ 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Total number of pumps at the pump station: 3. Design flow of the pump station: ____ millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 1f any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C. Lb. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 10-23 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/altematives found in 15A NCAC 02T .0305(f) & (g)? ® Yes ❑ No 15A NCAC 02T.0305(fl contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches zWater mains (vertical - water over sewer preferred, including in benched trenches) 18 inches zWater mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class 11 impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet "Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(0_ortZ), see Section X.I of this application * 15A NCAC 02T.0305r -.f contains alternatives where separations in 02T_0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webDa2e 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ NIA ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ❑ Yes ❑ No ® NIA ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft scgaration requireint;n for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ®Yes Basin name: Cape Fear ❑ No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B _02007. ® Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 213_0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T,O I OSLcj(f) (additional permits/certifications)?® Yes ❑ No Per 15A NCAC' 02T.0I05(c)l6}, directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T_0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interferencelconflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 10-23 Page 4 of 5 DocuSign Envelope ID: E41FAC3B-A0P8-48C5-91E345B203E8D388 X. CERTIFICATIONS: I. Does the submitted system comply with 15A NCAC 02'I', the Minntturri Dcsign Crilcfiti for the Pt:rrnitling of PLIMp Stations tttrid Force Mains at •St vertiio and the Gravity Srwer Minitlium Dcrinrt Criigrio f blest wtrxiurt} as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be Issued concurrently with the approve! of the permit, _and _prolecls rc4uirine a variance approval mabe sublecLEo lancer review times. For oroiects reguirine two or more variances or where the variance is determined by the Division to he a sianificant portion of the protect, the full technical review Is required. 2. Professional Engineer's Certification: 1, _ Christopher L. Freshour, PE , attest that this application for Chatham Park Section 6.2 Phase 1 B (Professional Engineer's name from Application Item 111,1.) (Project Name from Application Item H.l ) has been reviewed by me and Is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, h+linimum fkxiytn f'rilcria for (xlitvily Sc+vtrti I lutcsl v4rt tt], and the Minirnhim Maim CritcriA rpr file fit,t-Track #'et111ittittt ur[lwhip Stations and Force Mains (Islest vemi0gJ, Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) °ep0°soea'eoueo°eO ..� North Carolina Professional Engineer's seal, signature, and date: ,°°° tk C A R 0 °� •°°s°°° j °° es S °� ? ° 9 s a SEAL o s : 054280 S i e ° ° F s / AI G� • ,� e r—oocU9ran°d6_k`°'rGl�i�v.•'�� W _ 3/27/2024 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Timothy R. Smith, by Robin Rose Rcpistcred Agent attest that this application for Chatham Park Section 6.2 Phase 1 B (Signature Authority Name from Application Item 1.3.) (Project Name from Application Item I1,1) attest that this application has been reviewed by me and Is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and _I43-2d5.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature:. ��- — Hate: FORM: FPA 10-23 Page 5 of 5 ■0 WithersRavenel Letter of Transmittal NOour People Your Success t�C DePt pj Emjro,-intai rr� 55 Grant Drive, Suite D Pittsboro, NC 27312 APR 2 2024 t: 919.469.3340 1 f: 919.467,6008 Raleigh ReM TO- NCDEQ-Division of Water Resources 3800 Barrett Drive Raleigh, NC 27609 _._.. WE ARE SENDING YOU THE FOLLOWING ITEMS: ❑ Attached ❑ Under Separate Cover Via ❑ Shop Drawings C] Prints N Plans ❑ Copy of Letter i - Change Order Fl Disk 4/01/2024 23-0187-G Chatham Park Section 6.2 Phase 113 - 1S1 Sewer Permit to NCDEQ ❑ Samples ❑ Specifications ® Other o PIPP DESCRIPTION.... Cover Letter Fast Track Sewer System Extension Application (FTA 04-16) I ` N/A zero flow Flow Tracking/Acceptance Form for Sewer Extension Applications (FTSE 04-16) 1 USGS Map 1 Street Level Map 1 Application Fee in the amount of $600.00 made payable to NCDEQ 2 Thumb Drives with PDF of Submittal Items THESE ARE TRANSMITTED as checked below ❑ For approval ❑ Approved as submitted ❑ Far your use ❑ Approved as noted ❑ As requested ❑ Returned for corrections ❑ For review and comment ❑ For bids due REMARKS: COPY TO: ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ Other ❑ Prints returned after loan to us SIGNED: Gareth Avant, PE QA/QC: RECEIVED. If enclosures are not as noted, kindly notify us at once. ■■ WithersRavenel .. Our People. Your Success. April 4, 2024 NCDEQ - DWR Wastewater Management 3800 Barrett Drive Raleigh, NC 27609 RE: Chatham Park - Section 6.2 Phase 1B Sewer System Extension Permit Dear NCDEQ Reviewer, cinai APR .2 2024 RaIc;g, �Fglonal oxiCC On behalf of Chatham Park Investors LLC, please find the attached documentation in support of a Fast Track Application (FTA 10-23) for Chatham Park Section 6.2 Phase 1B. As noted in the application, this project will consist of 1,519 LF of 8" PVC sewer lines located east of Chatham Park Way and will connect to sewer (WQ0043641) permitted and constructed under separate cover and will be tributary to the Village South Pump Station (WQ0042824) permitted and constructed under separate cover. We are providing infrastructure to serve the additional 47 units in Phase 1B of Section 6.2 consisting of 47 single family homes, but we are allocating zero flow until such time that the downstream Village South Pump Station has been Certified (anticipated June/July, 2024), as requested by DWR. The proposed project has been designed to meet all the DWR's minimum design criteria for sanitary sewer extensions. The design flow rate for this project is calculated at 8,460 gpd based on NCAC 2T Rules for wastewater flow rates and the DEQ approved sewer flow reduction of 60 gal/bedroom, approved under separate cover for Chatham Park, is included with this submittal package. The proposed sanitary sewer line sizes are more than adequate to convey the projected design flow rates. Please find attached the following information in support of the application: Fast Track Sewer System Extension Application (FTA 10-23) USGS Map • Street Level Map • Check in the amount of $600.00 made payable to NCDEQ 2 Thumb Drives with PDFs of all submittal documents If you have any questions regarding this request or if you require any additional information, please feel free to contact me at 919-238-0329 or cfreshour@withersravenel.com. Sincerely WithersRaVenel Christopher L. Freshour, PE Project Manager 115 MacKenan Drive I Cary, NC 27511 t: 919.469.33401 f: 919.467.6008 1 www.withersravenel.com I License No. C-0832 Cary I Greensboro I Pittsboro I Raleigh I Wilmington Ali Lk -fr r.rz WWi ( CD cm CD �m � CD Im Om O 6 � • r w a �3 charl?Qnr Pk w ry L r �r ar +„ 16 k. c z m C 3 (6 �_ A Sr N N w w 3 O n -w� 0 N Q. O - G � Y A O. oLl co 3 CD 0 p A 0 3 o +y O N 5 m"'A� ti �gv� Joe 0 1 5 Camcr r _ ND CL CD N m L O CD 'mil N ti . L wd Lq OT