Loading...
HomeMy WebLinkAboutNC0002305_More Information (Received)_20240509��' � performance lextites LEAR May 8, 2024 Water Quality Regional Operations Section Division of Water Resources / DEQ 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Attn: Geoff Kegley, Helen Perez Subject: Response to Compliance Inspection Report (April 23, 2024) NPDES WW permit # NC0002305 Lear Corporation - Duplin County Dear Mr. Kegley, Ms. Perez: This letter is in response to inform NCDEQ about Lear Corporation's (Lear) plan to address the comments and findings in the April 23, 2024, Compliance Inspection Report. The following actions are planned to address the findings: Immediate action to be taken: 1) Inspect basin wall daily for "weep points" at the horizontal crack in the sludge basin 2) Clean out and patch repair (using hydraulic cement) any active weep points detected. 3) Lear has contracted with WSP, an environmental engineering firm to evaluate the structural integrity of the sludge basin and to advise Lear of any immediate and longer -term actions for improvements as needed.. 4) Lear is planning to reduce the level in this tank, during our next scheduled shut down in July 2024, for a visual inspection inside this tank. This will allow us to understand what improvements may be required and allow for planning them accordingly. Please feel free to reach out to me if you have any questions. Sincerely, Michael Cothran Plant Manager - Guilford Mills by Lear