HomeMy WebLinkAboutNCC241353_Site Plan or Location Map_20240509 GROVE 98 NORTHEAST QUADRANT LOT 6
CONSTRUCTION PLANS40
z PUD
s LIMITS
' SITE
i II I NEQ COMMERCIAL LOT 4 (�® ��
��xi EL X EV EV (UNDER CONSTRUCTION) 111112..
s 4018 y J , Colelenest&Stone
6._ _ 1830875268 _ _ � _ _ __ �� _ _ ❑❑ BOLTON&MENK,INC.
0�, WB FITNESS WAKE FOREST LLC F -4 - _ i
—
7it
c —� II J �� 418 S DAWSON STREET
RALEIGH,NORTH CAROLINA 27601
_ I-_ L Q 3 li
C
Phone:(919)719-1800
I STOP S stop S stop S ) STOP =IIM STI C----'sTOP f, ,� _g�'� Email:info@colejeneststone.com
E 1 �� IUM ✓— _ www.bolton-menk.mm
, t
� == I � � 1111111
__ I �� t 9 — VICINITY MAP N.T.S. STILES CORPORATION
pi I� I —
EB
•� - 0' __IM= I _ ^ �- - - --► .. SURVEY DIBCLA68i300 W.SUMMIT AVE
__ I �❑ _ �II NC(9ING 11151-4422.S DTEDEOON/URVEVISD DATED 7/0,/19). DBy BNK,AALEIGH, SUITE 230
I II LLNC I9191851-A412.DATED 08/31/18(REVISEO DAZED O]/09/191. CHARLOTTE,NC 26203
1 t1111
❑•❑ 1 � I `� I a •
I IGROVE 98 NEQ
I — == __ i + j LOT 6 CONSTRUCTION
I l = NEQ COMMERCIAL LOT 5 __ = �= I I - i DOCUMENTS SET
` (UNDER CONSTRUCTION) -- I NEQ MULTI-FAMILY
1830876045 __ I �� HIGHWAY 98 AND LIGON MILL ROAD
-- (UNDER REVIEW) WAKE FOREST,NC
(
G98 COMMERCIAL PH II LLC e I I Sheet List Table
Mil
dD1 _ dD19 1 1 1830972389 COVER SHEET
_ I Sheet Number Sheet Title
`��*IPA,
II ALLIANCE GROUP OF NC LLC
�� PROPERTY LINE,TYP. " I J uu C-000 COVER SHEET
Iii1-1
C-001 EXISTING CONDITIONS
_� I i _ IC-002EXISTING CONDITIONS
' • xn / "`KKK��_ III _IC-200SITE PLAN
�, //+Q E�3� I I ❑❑ I C-300 OVERALL SOIL AND EROSION CONTROL
�f - I C-301 SOIL AND EROSIONPHAS CONTROL PHASE I E I PROJECT NO:
H I 50436.07
STOP 'Yr ] C-302 SOIL AND EROSION CONTROL PHASE II
Z �I I / J
'�� �I e I ❑❑ C-400 OVERALL GRADING&DRAINAGE PLAN
r REVISIONS:
I RIGHT OF WAY,TYP. C-401 GRADING&DRAINAGE PLAN
I
:'I � C-500 UTILITY PLAN
gp BUILDING I ' I 10/20/2023: 1ST ROUND CD SUBMITTAL
• '�' t PP—IUI PHOTOMETRIC SITE PLAN
im
R I 02/26/2024: 2ND ROUND CD SUBMITTAL
II 1. ea— i���� ail 4,936 SF ❑❑
C—EBB PLANTING PLAN—CODE ONLY
I IIIIIIIIIII
— I C-700 SITE DETAILS I 03/29/2024: SIGNATURE SET CD SUBMITTAL
C-701 SITE DETAILS II
_ 1 _=1 I I� j C-702 SITE DETAILS
_ Allow 1111 I I • I C-710 PLANTING DETAILS
' I t _
7 C-800 SEC DETAILS I
rIL
i---
t T ] „� \_-` --.-�R _ C-601 STORMWATER DETAILS
C-EGOUTILITY DETAILS I
FA-T C-603 UTILITY DETAILS II
1 u 1 __ _ _ I •� I I I I+III \ \� C-604 NCGU1
\<yr \\,...,:j ____„______---__
DR.CALVIN JONES HWY RIGHT OF WAY,TYP.
(SR-98/NC 98) 6 ----------__
VARIABLE R/W I� a�'
s1pN&MEN _
— — — @ O.c Pr IALd m•.2
— m.
I — — 3 : _ =e p<
4yto;0N0d
PROJECT DATA.
PARKING SPACES'
PROJECT NAME: GROW 98 PUD—NORTHEAST QUADRANT COMMERCIAL LOT 6 TOTAL VEHICULAR PARKING REQUIRED 1/200 SF 0 4,936 SF-25 SPACES
TOTAL VEHICULAR PARKING PROVIDED=58 SPACES(3 HC+55 STANDARD)
PROJECT LOCATION: HIGHWAY 98 AND UGON MILL ROAD,WAKE FOREST NC PSUmlugr,"
TOTAL BICYCLE PARKING REQUIRED=2 PER 40 AUTO SPACES=3 SPACES tun lrrptp r
PARCEL PIN: 1830876045 TOTAL BICYCLE PARKING PROVIDED=4 SPACES(2 RACKS,2 PER RACK) °PtN��CARO'�• '� �o`d.,N O7''�.,
PROJECT ADDRESS: 680 RICHLAND GROVE AVE �. ' R5 S +�' ...,. `���()P.�ESS/O �2
WAKE FOREST,NC 27587 F% S `_ O
PRINCIPLE BUILDING FRONT SETBACK=10'MIN. .K: T�
OWNER& SETBACKS: STREET SIDE/SECONDARY FRONT SETBACK=5'MIN. _ . j K_ As......SiSIDE(FROM ADJACENT LOT)SETBACK=5'MIN.MASTER DEVELOPER: G98 COMMERCIAL PH II,LLC LO{.,.2 ..vti �,, �. �� �4i�STILES CORPORATIONSIDE(INTERIOR)SETBACK=0'MIN. ' t,3y10 GDPGI .`201 E LAS OLAS BLVD STE 1200 REAR SETBACK—20r MIN. i�4Oq ..,, �• Q�p` 'p.Qs .......+�c,•:-
FORT LAUDERDALE FL 33301-4434 '5i�NM.PE HOLL sJ
ATTN: MARK HEBARD,MARK.HEBARDOSTILES.COM 1980-207-0197 OVERLAY DISTRICTS: RICHLAND CREEK WATER SUPPLY WATERSHED(WS—IV) •mmm•"5503/29/2024 mm,,`,,03/29/2024
SPECIAL HIGHWAY OVERLAY(SH2-0)
PREPARED BY: BOLTON&MENK,INC.I COLEJENEST&STONE,PA ALL PUBLIC FACILITIES,INCLUDING UTILITIES,SIDEWALKS,AND
418 S DAWSON ST SPECIAL FLOOD HANDICAP RAMPS,ARE TO BE CONSTRUCTED ON ALL STREETS N
RALEIGH,NC 27601 HAZARD OVERLAY: NONE AS SPECIFIED BY TOWN OF WAKE FOREST STANDARDS.SUCH
ATTN: JORDAN PETERSEN,RLA,LEED AP FACILITIES APPROVED BY THE TOWN OF WAKE FOREST SHALL CITY OF RAIEIGH-PLANS AUTHORIZED FOR CONSTRUCTION
671)
JORDAN.PETERSENISBOLTON—MENK.COM,919-748-1797 BE INSTALLED AS APPROVED,UNLESS A CHANGE IS APPROVED �in approval:This approval la beingoro electronically.ma approval Is valid only upon me avprature m aSTao
PROPOSED STORMWATER BY THE TOWN OF WAKE FOREST. Officer bear..me City will retain a copy of the approved plan,.Any doer aathox.ed by this approval must
CURRFNT PROPFRTY CONTROL MEASURE: 0 ON SITE; USING SCM#2 FROM INFRASTRUCTURE PLANS yaoS thlaelaa,onkappror.l envy=leeeaa.A once Issued.AM
REVIEW ENGINEER DISCLAIMER nrodm tw t Issued ill Invalidate thls
EXECUTION OF THESE CONSTRUCTION PLANS BY THE REVIEW p miaaP rov v p Pp
ZONING: PUD RZ-18-15 IMPERVIOUS(SCM$2): ENGINEER FOR THE TOWN OF WAKE FOREST IN NO WAY LIMITS City of Raleigh Development Approval
PIN: 1830876045 (LOT 5) THE RESPONSIBILITY OF THE OWNER AND ENGINEER OF
EXISTING= 0 AC(0%IMPERVIOUS) RECORD WITH REGARD TO COMPLIANCE WITH ALL FEDERAL Raleigh Water Review Officer
TOTAL PARCEL AREA: 1.09 ACRES PROPOSED=2.17 AC(75.9%IMPERVIOUS) STATE,AND LOCAL STANDARDS AND/OR CONDITIONS. SCALE: 1rr=30r
TOTAL— 2.17 AC(75.9%IMPERVIOUS) OWNER CERTIFICATE
TOTAL DISTURBED AREA: 1.16 ACRES/50,765 SF (LOT 6) OWNER HEREBY CERTIFIES AND AGREES TO TAKE SUCH ACTION 0 15' SO' 60'
TOTAL IMPERVIOUS AREA: 0.72 ACRES/31250 SF(66.1%) EXISTING= 0 AC(0%IMPERVIOUS) AS MAY BE REQUIRED BY THE TOWN OF WAKE FOREST TO These plans have been electronically approved for construction by the Town of Wake Forest
PROPOSED—0.72 AC(66.1%IMPERVIOUS) CORRECT ANY ERRORS,OMISSIONS OR NON-COMPLIANCE WITH Planning Department.This approval may not be altered once issued. SCALE: 1"=30'
CURRENT LAND USE: N/A TOTAL— 0.72 AC(66.1%IMPERVIOUS) TOWN STANDARDS AND/OR CONDITIONS DESCRIBED IN THESE
13 PROPOSED LAND USE: COMMERCIAL(RESTAURANT) CONSTRUCTION PLANS,INCLUDING RESUBMISSION OR DATE: 12/06/23
PUBLIC IMPROVEMENT RE-EXECUTION OF THESE CONSTRUCTION PLANS WITH THE Planning
m PROPOSED BUILDING QUANTITIES: PUBUC WATER=PROPOSED SERVICE METER CONNECTION(2)ALONG NC98. APPROPRIATE CORRECTION AND/OR REVISIONS. DESIGNED By: NG,PK
SQUARE FOOTAGE: 4,694 SF(BUILDING) (1)1.5"DOMESTIC SERVICE AND(1)1"IRRIGATION METER. AV
// /
a 242 SF(EXTERIOR COOLER) /I/ Cj.it 4/8/2024 DRAWN BY: NG,PK
ri 4,936 SF(TOTAL) PRIVATE IMPROVEMENT ill
OWNER DATE These have been electronically d for construction b the Town of Wake Forest CHECKED BY: 1P,BL
QUANTITIES: PRIVATE STORM= 15-RCP—280 LF pans yrtmente y
BUILDING HEIGHT: 24'TO TOP OF PARAPET Public Works and Engineering Departments.This approval may not be altered once issued.
NO.OF STORY: 1 PRIVATE SEWER=(1)PROPOSED 6"LATERAL WITH(2)1,000 GALLON ANY PROPOSED SIGNAGE SHOWN ON THESE CONSTRUCTION
Y GREASE TRAPS IN SERIEST TO MH FOR 1 BUILDING. PLANS IS INCLUDED T SHOW THE GENERAL SEPARATE SIGN OF
g PRIVATE CROSS—ACCESS EASEMENT LENGTH: 203 FUTURE AIGNAGE.SIGNAGE REQUIRES SEPARATE PERMIT _000
oe PRIVATE PARKING DRIVEWAY LENGTH: 283 LF REVIEW AND APPROVAL. Public Works/Engineering C 1.
O
FILE NO.: