Loading...
HomeMy WebLinkAboutNCC232066_NOT Closeout Documents_20240506 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200 County: Person Project: Polywood Facility Substation River basin: Roanoke Person financially responsible: Project#: PERSO-2023-012 Address: 1. Project Location: Jim Thorpe Hwy,Woodsdale Township Pictures: No 2. Weather and soil conditions: Sunny,wet soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: May 06,2024 9. Corrective action needed: 10. Comments: FRP confirmed no further disturbance will be taking place,substation is no longer need and project can be closed out. Tree cover was removed,but stumps and debris were left in place.No signs of erosion or additional disturbance at time of inspection. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Isaac Allen Others present: Date of inspection: April 10,2024 Time arriving on site: 10:00 AM Time leaving site: 10:55 AM Cc: