Loading...
HomeMy WebLinkAboutSW6240102_Design Calculations_20240507 (8) OUTLET PROTECTION DATE DESIGN PHASE DESIGN 09-22-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Raeford Vass Rd Dollar General 2019 REVISION / / LOCATION BY RECORD / / Raeford, North Carolina CSB OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure I FES No.= FES-3 Q1o/Qfull = 0.62 Pipe Dia= 15 in VNfull = 1.05 Q10= 8.72 cfs V= 11.9 fps Qfull = 13.97 cfs Vfull = 11.37 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in t Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft 1. Length 2019-Storm drainage.xlsx LATEST REVISION:5/7/2024 11:48 AM PAGE 1 OF 1