Loading...
HomeMy WebLinkAboutSW6240102_Plansheet - Grading/Drainage Plan_20240507 ■ GROUND STABILIZATION CHART 4Dsite SITE AREA STABILIZATION STABILIZATION TIME N solutions s DESCRIPTION TIME FRAME FRAME EXCEPTIONS F� AS CONSTRUCTION SEQUENCE '� lL PERIMETER DIKES, C, 9 �0 SWALES, DITHCES 7 DAYS NONE �A���9 00 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD civil engineering I land surveying AND SLOPES �& �2 PRE CONSTRUCTION CONFERENCE. 409 Chicago Drive,Suite 112,Fayetteville,NC 28306 HIGH QUALITY WATER 2�77)�O 6Q 2. INSTALL STONE CONSTRUCTION ENTRANCE AND TEMPORARY SILT office1910-426-6777 fax1910-426-5777 license number I C-2354 7 DAYS NONE 83 FENCE WHERE SPECIFIED. www.4Dsitesotutions.com (HQW) ZONES FA7r Q 3. CONSTRUCT INFILTRATION BASIN. IF SLOPES ARE 10' OR n I 4. CLEAR AND GRUB THE SITE AS NEEDED. 7 DAYS SLOPES STEEPER LESS IN LENGTH AND ARE 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO THAN 3:1 NOT STEEPER THAN 2:1, I AREAS REMAIN GRASSED. SITE * 14 DAYS ARE ALLOWED 6. INSTALL UTILITIES. 7-DAYS FOR SLOPES 7. PERFORM FINE GRADING.SLO FLATTERES 3:1 OR 14 DAYS GREATER THAN N LENGTH FEET I I 9. PAVE8. LL AND ROADWAYSEANDE BASE PARKINGOURSE.LOTS. ♦�A` CARq����j� NONE N 10. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. `��OQ;•'FESS/ *•.• �� ALL OTHER AREAS v I 11. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE :�� �: i WITH SLOPES FLATTER 14 DAYS (EXCEPT FOR ALL TEMPORARY MEASURES. 'Q < THAN 4:1 PEHQW ZONES)RIMETERS D ���/L�/F /� , I / \ i 12. COMPLETE EXCAVATION OF THE INFILTRATION BASIN AND - SEA p� �/ /Q tic yo J I RESHAPE TO DESIGN DIMENSIONS. 02 4 o S9 ����� / / J I / 13. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS • �` z �p ST S / / OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING O ����VVVGI NE ..0 OfC \ I 1 TO THE NCDEQ EROSION CONTROL MANUAL. 'I���S'CO•••••8� `��♦♦ z NORTH TEMPORARY SKIMMER BASIN #1 J I � 0 r „24/ L=104', W=52', D=3' U v./ G SIDE SLOPES= 3:1 SILT FENCE VICINITY MAP TOP OF BASIN: : 232.' RIP RAP DISSIPATER OUTLET , F/ BOTTOM OF BASIN: 232.10' 9C � /� L=3' W=1'/3' 10' EMERGENCY SPILLWAY �, NOT TO SCALE 10' EMERGENCY SPILLWAY: 234.58' �., �� REVISIONS INVERT OF SKIMMER: 232.10' / DW-8" DMnx=12" TO BE SODDED. EROSION CONTROL NOTES 7i2,, SIDE SLOPES OF BASIN ARE TO 6C Q CLASS B 18" THICK ELEV: 234.60'�� C BE SEEDED WITHIN SEVEN DAYS. - •Fo - 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE Fi I AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) S ..S SF SF SF FROM INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS WITH 1.2" ORIFICE FOR DEWATERING THE -� SF TEMPORARY SILT / BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR 1 - - - SEDIMENT BASIN DURING CONSTRUCTION. � FENCE (TYP) REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. I TOP: 235.10 Y SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN LEGEND: \ IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE 0 ECM-EXISTING CONCRETE MONUMENT ECM t\ U a 234 23 J I WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. � / / I EPK / 233 I 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT EiR O EPK-EXISTING PK NAIL ✓ \ FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE (0 �EIR-EXISTING IRON ROD / PERMANENT INFILTRATION BASIN-1 JN j \ ( OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE a COMPUTED POINT / / HIGH WATER: 234.95' (100 YR) I JN JN JN w 1 OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING �/ 234.77' (10 YR) 29 � CONSTRUCTION. R/W - RIGHT OF WAY 232.10' (1 YR) 0 I JN JN � FOREBAY I 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE N/F - NOW OR FORMERLY ) r �C \�Q TOP OF BASIN: 235.10' J BMP-01 J RIP RAP DISSIPATER I CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN PROPERTY LINE r / INVERT OF BASIN: 232.10' I JN a N L=8' W=4'/9' / ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT / I JN JN w -OPL- - - OLD PROPERTY LINE EMERGENCY SPILLWAY: 234.60' o D50=8" DMAX=12" CONTROL PLANNING AND DESIGN MANUAL. r INFILTRATION RATE: 3.11 IN/HR U I BTM: 232.10 FES-3 CLASS B 18" THICK L. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A ADJACENT PROPERTY LINE SHWT: 229.83' o w �X�,O o MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING )� J _ 234 I'\ I ACTIVITIES. 910-433-3300 RIGHT-OF-WAY // 1 LL o 0 INFILTRATION BASIN IS TO BE USED AS AN r N � _� INV: 239.80'� 1� 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED - - - - - SETBACK LINE r� / eo � I ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON ss SANITARY SEWER LINE C CONSTRUCTIONRTHENECONVERTEDOTO AN -�+ SF ( I TEMPORARY CONSTRUCTION A DAILY BASIS WHEN TRACKING OCCURS. O �• �] ENTRANCE 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM ANY X FENCE LINE I INFILTRATION BASIN UPON STABILIZATION > O �S 1 � 238 r z70 MAJOR CONTOUR /- J f OF THE SITE. �OOI /� � Z�0_ 241 I 'o PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING C'p n W FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY 241.62 ��- p O VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM 278 MINOR CONTOUR / / EXCAVATE TO A DEPTH OF 232.60' FOR THE J L_ J ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. LIGHT POLE 1 BASIN. AFTER SITE IS STABILIZED I 0 > 241.25 Xo4HP�o O TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO PP EXCAVATE TO ELEV: 232.10' AND CONVERT 0 L C Z • UTILITY POLE S THE BASIN TO THE FINAL DESIGN ��� tO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE I I u)240.97 �� nF o CD G I COVERED IF LEFT MORE THAN 24 HOURS. n SANITARY SEWER MANHOLE FOR THE INFILTRATION BASIN. TEMPORARY INLET ��� o C o n D I 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN / PROTECTION (TYP) DI-2 (n PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. PROJECT NAME COVER SLOPE MATH NAG S75 I r, , ;;0 Cl) INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A EC MATTING OR EQUAL IMMEDIATELY aU-0 241.77 ,243.34 O (r- DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED UPON CONSTRUCTION �OC� ��� NP�' C o EROSION CONTROL DEVICES IMMEDIATELY. pS / 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH NOTIFICATION OF COMBINED SELF-MONITORING AND / ✓ _ HOC 78 LF OF CL IV HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH SELF-INSPECTION FORM: �v 241.88 243 GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT 1, 15" RCP RAEFORD > � � l,D S I TF S / 014 23 23g 242.84 f ' J241.92 \ Jr ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN o C 23$ 4 r " INV: 240.75' o RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION VASS ROAD 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR �J 24� 241.73 1 CONTROL MATTING, AND/OR SODDING AND STAKING IN GREEN SPACE LAND-DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH -A OS _ r ee 242.50 I AREAS AND OTHERWISE APPROPRIATE MEASURES. USE EARLY PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED o O 242. I 24286 I \ I APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. EROSION AND SEDIMENTATION CONTROL PLAN IS BEING z c� �- / 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE /INV_ 2Q38.i0' �� 242.00 O -� I I PERMANTHE OENECTED AREA T VEGETATION A AS UNDERGONE B ENGOESTABLISH D, IT IISA RECOMMENDED MN NDED DOLLAR INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. � � \ 1 N 242.58 243.01 I I THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. TO SIMPLIFY DOCUMENTATION OF SELF-INSPECTION REPORTS ^� LIMITS OF CONSTRUCTION \ I N 242.58 / ( / 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY I243.08 1 AND NPDES SELF-MONITORING REPORTS, DWQ AND DEMLR o I 1.9 AC U a I I WITH THE INITIATION OF CONSTRUCTION ACTIVITY. GENERAL DEVELOPED A COMBINED FORM. THE SELF-INSPECTION 1 0 > I 242.95 _: - a 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING �1 r J o 242.16 i _ PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. O � r � 2'' � 242.50 PROGRAM OF THE NPDES STORMWATER PERMIT FOR 242.86 '° 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND CONSTRUCTION ACTIVITIES. THE FOCUS OF THE S J✓ Oct ` 7'' a 242 58 TW/EP- N N i PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS SELF-INSPECTION REPORT IS THE INSTALLATION AND / , / ��I Oc I _ rn v /c PROJECT. MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL �C, 7' " - //�^ll` I ° d N I \ 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR MEASURES ACCORDING TO THE APPROVED PLAN. THE 6, 0 OPL- -� OPL -OPL- - 0 OPL- - -OPL- - -OPL- - -OPL- J -OPL- - -OPL- - I 242 36 0 �A/r V STABILITY AND OPERATION FOLLOWING EVERY RUNOFF-PRODUCING INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF � I RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND **COORDINATE DOWNSPOUT LOCATIONS I ;" EP- M 242 91 REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: I I WITH ARCHITECTURAL PLANS. CONNECT I 242.46 DESIGNED. HTTPS://WWW.DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL-AND- / r U DOWNSPOUTS TO 10" PVC. YI-4 \ � N 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND LAND-RESOURCES/STORMWATER/STORMWATER-PROGRAM/NPDES- r > a I GRATE: 242.32' FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED CONSTRUCTION-PROGRAM N 242.34 BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES GRADING AND \ 246.35 LF OF 10" o INV: 240.30' - 242 g8 / OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, L HDPE C� 1% MIN PROPOSED BUILDING 242.52 ( OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) T'Sp (76'xl40') / BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT 433-3300. O� i9 0 10,640 SF \ GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION `S ��� ti I� TEMPORARY DIVERSION J o FEE 243.08 242.53 / / �N ) N EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GRADING NOTES 09 T y ` BERM (TYP) YI-5 GROJ ( I I J FORUALDL DIOVER STURBEDFICIENT TO AREAS WITHIN TAI4 WORKINON MUST BE G DAYS OR 90CCOA CALENDAR .0C O� TO BE SEEDED WITHIN GRATE: 242.32' I -243 20 CONTROL PLAN 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE J �F 7 DAYS U I INV: 239.80' 242.16 I DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF BENCHMARK AND MUST BE VERIFIED BY THE GENERAL 1� S \ > 0 242.86 , CONSTRUCTION DEVELOPMENT. CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED ) o 242.95 TW p 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL GRADE OF THE CURB, UNLESS OTHERWISE NOTED. 0 I 242.45 p 242.36 �� 241.95 MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO I CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES `7 I o 242 45 TW/EP p, 107.5 LF OF 6" `� � 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND U I 242.58\ I 242.36 ry HDPE 0 1% MIN I MULCHED ACCORDING TO THE DETAILS HEREIN. LONGITUDINAL SLOPE NO STEEPER THAN 5%. o > I 7 242 50 TW/EP 242 43 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL ( o i I 241.98 C, , / = YI-6 �'' 1 242 95 Li I SITE IS MATT TAGGART. CONTACT 910-944-0881. CLIENT LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE 0 / 7'' F7 _ C WITH THE APPROVED EROSION AND SEDIMENTATION GRATE: 241.90' nj 243.08 L-242.95 oe - - 0P' - -241.51 - OPL A CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND SHED r / J INV: 239.80'24 G 242.86 241 99 I V 243.03 , TW 1 DEBRISMAINTAIN ALL LEAVINGRTHEOSITEONTROL DEVICES AND ON NEIGHBORING ROADS. ANY / O �J 24258 g DI-1 241.75 244 I L RHETSON O OC "= a ="- � I LOC L � 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE INV: 240.00' 243 _ �; 242.86 91.5 LF OF 6" PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, _ _ �TW/ HDPE 0 1% MIN �,�, ' 001 AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL o 0 > l •�1.. - �001 COMPANIES, INC. BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND `� I J o 243.03 242 40/ i 242.36 i O /1/ 3 HAS BEEN COMPLETED 242.86 242.36 EP/ & 2 '� 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE / �242.77 TW EP / ao T 2 AD ? I CONTRACTOR AND THE OWNER TO PROTECT ADJACENT / (p I I 242.85 242.61 _" _/ I -- -- 241.94 `�9 OJ PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING Q U _�__- -�� I 7242.11 3 91% OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR o > l tiR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR i �` qA/ \ o J o 242.88 242.74 242.38 �a5 STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN � �CF�� 242 T AND BELOW GROUND 96 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY TFQ I 243 74 \ �, 2075 Juniper Lake Road HE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE 1 243.03 I I N West End North Carolina 27376 SHOWN OR NOT SHOWN ON THESE / U 242.77 PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE 0 244.29 243.33 243 Phone: (910) 944-0881 TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS \ / 244 OPERATION. m 1 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH I �� 1244 33___� 244 \ DURING AND AFTER GRADING BY THE CONTRACTOR TO / U DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT S� [ ✓ Z �/ j > 245 - \ 246 - �o'` l \ IS DETERMINED THAT THERE IS A SLOPE STABILITY ti A �7 o PROJECT INFORMATION N PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 7 SS Cif 2'. Fj 7,, r 'r� I 't� 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT c G�9S7' j0) y Oct FiQ \ / 246 �027 F02� 00^ SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED O 62 -/) _ _ _ _ _ _ _ N BY SILT FENCE. ��0/tiq 9A0 1 001 O1 0 DESIGNED BY: SCOTT 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL 7) O o r PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS 83 O 001 / DRAWN BY: SCOTT IN PROGRESS. 6 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE **ENTRANCE SHALL NOT BE USED FOR CONSTRUCTION _ _� N CHECKED BY: CHRIS TION SUCH THAT THEY CAN TRAFFIC. TRANSPORT THE SHALL REMAIN NNATURAL I DRAINAGE UNTIL FACILITIES TO 1 �, ^� �~ "` PROJECT NUMBER: 2019 3 HANDLE THE STORM WATER ARE CONSTRUCTED. THE CA CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE (D DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 0 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN cA cA US 401 (FAYETTEVILLE ROAD) cA \ L DRAWING SCALE SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR `-� 60' PUBLIC R W `n N TO IMPLEMENTATION OF THE CHANGE. 0 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR - HORIZONTAL: 1"=30' o MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. DATE RELEASED *DO NOT COMPACT THE BOTTOM ® �F THE BASIN. � GRAPHIC SCALE MECHANICAL �/ �9 / -moo EQU PMENT SHALL BASIN BOTTOM.BE USED \ LOT 2Q 2J / 30 0 15 30 60 120 **CONTRACTOR IS RESPONSIBLE FOR 2A2`S6 MAY 6, 2024 PROVIDING POST CONSTRUCTION 2s > INFILTRATION TESTING AT BOTTOM N 6 Know what's below. OF BASIN. ONE TEST MINIMUM. IN FEET SHEET NUMBER SIDE SLOPES OF BASIN ARE 3:1 ( ) CaII before dI FROM THE TOP OF BASIN TO THE N Y g INVERT OF THE BASIN AND ARE TO 1 inch = 30 ft. OU . BE SEEDED WITHIN 7 DAYS. -30 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1 -800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED '