HomeMy WebLinkAboutSW6240102_Stormwater Narrative_20240507 mP4Dsite
::Jsolutions
civil engineering I land surveying
Raeford Vass Road Dollar General Storm Water Narrative f
Currently undeveloped, the site is to be utilized as a new retail store with the associated
parking area. In its current condition the site drains generally from the south to the
north.
Storm water will be collected within the property via paved and grassed swales and
storm drainage which will convey the runoff into the proposed infiltration basin. There
is a forebay in the basin that will serve as the pretreatment. The basin will infiltrate the
1 yr 24 hr storm event within the 72 hour time period as required by manual. The
infiltration basin has been designed in accordance with the latest NCDEQ MDC
Stormwater Design Manual.
t
409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 1910-426-6777 fax 1910-426-5777
On time,every time. I www.4Dsitesolutions.com