Loading...
HomeMy WebLinkAboutSW6240102_Stormwater Narrative_20240507 mP4Dsite ::Jsolutions civil engineering I land surveying Raeford Vass Road Dollar General Storm Water Narrative f Currently undeveloped, the site is to be utilized as a new retail store with the associated parking area. In its current condition the site drains generally from the south to the north. Storm water will be collected within the property via paved and grassed swales and storm drainage which will convey the runoff into the proposed infiltration basin. There is a forebay in the basin that will serve as the pretreatment. The basin will infiltrate the 1 yr 24 hr storm event within the 72 hour time period as required by manual. The infiltration basin has been designed in accordance with the latest NCDEQ MDC Stormwater Design Manual. t 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 On time,every time. I www.4Dsitesolutions.com