Loading...
HomeMy WebLinkAboutSW6240102_Response To Comments_20240507 $F4Dsite 'Z ' solutions May 6, 2024 civil engineering I land surveying NCDEQ Division of Water Quality f Attn: Brianna Holland 512 N. Salisbury Street Raleigh, NC 27604 RE: Storm water resubmittal, Raeford Vass Road Dollar General (SW6240103), Raeford, North Carolina Ms. Holland; The review comments for the above project dated April 17, 2024 have been addressed as noted below. 1. An outlet structure is shown on Sheet C-3.1 — Drainage Area Map, but it is not shown on the other plan sheets. Is there an outlet structure for the SCM? If so, show on the SCM detail sheets per 15A NCAC 02H .1042 (2) (h) and provide calculations showing the outlet is non-erosive with the maximum velocities allowed. If not, provide the maximum allowable velocity for the material in the provided 10-year storm spillway outlet calculations per 15A NCAC 02H .1050 (4) and show the elevation of the bypass on the detail sheet (15A NCAC 02H .1042 (2) (h)). The outlet structure you are referring to on sheet C-3.1 is the skimmer for the basin while it is functioning as an erosion control measure. There is no outlet structure other than the concrete spillway as noted on detail #9 sheet C-6.2. The notch elevation is shown in the spillway. The overflow from the spillway during a 10 yr storm is 6.40 cfs. The 10'spillway will flow 4.2" deep for a velocity of 1.83 ft/s which is less than the maximum of 5 ft/s. The skimmer has been removed from sheet C-3.1. 2. Per Infiltration MDC 2: "The lowest point of the infiltration system shall be a minimum of two feet above the SHWT. However, the separation may be reduced to no less than one foot if the applicant provides a hydrogeologic evaluation that demonstrates that the water table will subside to its pre-storm elevation within five days or less." There are two primary reasons for the two-foot separation requirement; the first is the inherent uncertainty in pinpointing the exact location of the SHWT in the field, and the second is the potential for mounding of the groundwater table in the vicinity of the infiltration system. If the mounding becomes severe enough, the infiltration will not function as designed. See Part A-2 for guidance on what should be provided in a hydrogeologic evaluation. The lowest point in the forebay does not meet this requirement. Including the 4" of clean sand shown (bottom of which is 231.77), it does not appear the infiltration system meets this requirement outside of the forebay as well. The sand has been removed from 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 On time,every time. I www.4Dsitesolutions.com the bottom of the basin. I did not see a requirement for sand in the bottom of the basin. Therefore, the invert of the infiltration basin at 232.10' is more than 2' above the SHWT of 229.83'. Per the comment below, the forebay is provided in addition to and is not part of the infiltration system. As such, the forebay is not subject to the separation requirement of the infiltration system.The forebay is designed to collect sediment and will therefore not infiltrate like the main body of the basin. There was no change to the basin except for removing the 4" of sand in the bottom. All MDC requirements have been met. 3. Please ensure that the forebay area & volume are not included in the Infiltration System surface area &volume (A forebay is provided in addition to, not as part of, an Infiltration System), Infiltration MDC 4. The forebay was not included with the infiltration system sizing or routing calculations. 2,600 sf is the bottom of the basin minus the forebay. The linework on the basin has been modified to eliminate confusion about the location of the bottom of the basin. 4. Please provide a Response to Comments letter indicating, in a point-by-point manner, how each of the above comments has been addressed. This item is required per 15A NCAC 02H .1042(3)(b). A response to each of the comments has been provided. 5. Please note that electronic copies were not received and are required, per 15A NCAC 02H .1042 (2). A full electronic copy was uploaded as part of the resubmittal. 6. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. Done I look forward to working with you on this project. If you have any questions or concerns, please contact me at your earliest convenience. Sincerely, 4D Site Solutions, Inc Scott Brown, PE sbrown@4dsitesolutions.com Enclosure 2