Loading...
HomeMy WebLinkAboutWQCSD0037_Qtrly Progress Report April 2024_20240508Mayor $dward Waltz Commissioners Mrs. Janet Baker Ms. Cara Dunn Mrs. Myra Fryar Ms. Lisa Moore (Mayor Pro-tem) Mr. Dan Ryan Town of MaijsviHe 404 Main St. P.O. Box 265 Mnyavtlle, NC 28555 (910)743-4441 Pax (910)143-0895 April 28, 2024 Robert Tankard Assistant Regional Supervisor Division of Water Resources Water Quality Regional Operations Section Re: Quarterly Progress Report (April 2024) . Dear Mr. Tankard, N A The following is an update for Maysville's WWTP and Collections System: Wastewater I&I Remediation Status: • CCTV completed; repair work started after issuance of Change Order 1 • The contractor has returned to work on the I&I. Wastewater Treatment Plant Upgrade Status: • Plans were sent to the Electrical Engineer for updating. • Negotiation ongoing with Crowder Construction. • Altemate equipment considered. Action Items: • Awarding the project. Improvements for Better WWTP Effluent Status: • Site design and grading plan at 7Q% completion. • Design of digester modification at 70% completion. • Major Equipment Item Specifications has been updated. Action Items: • Continue developing Major Equipment Item Specifications. • Achieve an 80% draft design for review. Let me know if you have any questions or concerns Town Manager Scliumats. Brown Town Clerk Teressa Selders RECEIVEDMCDENR/DWR MAY - 8 2024 Water Quality Regional operations Section Washington Regional Office Respectfully, s Schumata Brown Town Manager