Loading...
HomeMy WebLinkAboutNC0025879_Authorization to Construct_20151222 INCT PAT MCCRORY (;orrrn.n' DONALD R. VAN DER VAART Water Resources S. JAY ZIMMERMAN ENVIRONMENTAL QUALITY December 22, 2015 Mayor Steve Hooper Town of Robbinsville P. O. Box 129 Robbinsville,North Carolina 28771 SUBJECT: Authorization to Construct A to C No. 025879A03 Town of Robbinsville Robbinsville WWTP Dear Mayor Hooper: A Permit Application package for an Authorization to Construct (ATC) Permit was received October 14, 2015, by the Division of Water Resources (Division). This Authorization to Construct Permit is issued based solely upon the North Carolina Licensed Professional Engineer's certification and the Applicant's certification of the ATC Permit Application package. The Division has waived the technical review of the plans, specifications, calculations and other supporting documentation included in the subject ATC Permit Application package. Note that the ATC Permit Application package may be subject to a Division audit. This ATC results in no increase in design or permitted capacity of the existing 0.63 MGD Robbinsville WWTP and is hereby issued for the construction of the following specific modifications: Installation of tertiary filters overflow piping system to new belt press filtrate pump station system; installation of one (1) 50 GPM at 15.3 ft TDH sludge feed pump with VFD, piping, and controls; installation of a 55 gal drum polymer mixing/feed system to inject 10 lbs polymer per ton dry solids with containment, piping, and controls; installation of enclosed 350 lbs/hr (dry) belt filter press with VFD and incline dewatered sludge conveyor and one (1) 40 GPM at 203 ft TDH washwater booster pump, air compressor, collection basin, other containment, piping, and controls; installation of belt press filtrate pump station consisting of two (2) 350 GPM at 12.1 ft TDH submersible pumps, piping, and controls; installation of enclosed 4,200 lbs/hr sludge/lime mixer system with VFD and incline conveyer, containment, and controls; installation of a lime storage and conveyance system consisting of one (1) nominal 30 ton (65 lbs/ft3) silo with filter bag house and controls for bulk truck unloading, bin activator, 1,000 lbs/hr volumetric screw feeder with VFD and transfer screw conveyer, piping, and controls; installation of a covered 12 yd3 retention bin storage, covered 150 yd3 dry storage, and containment area with catch basin; in conformity with the State of North Carolina I Environmental Quality I Water Resources 1617 Mail service Center I Raleigh,North Carolina 27699-1617 Location:512 N.Salisbury St.Raleigh,North Carolina 27604,Archdale Building 9th Floor Phone:919 807 6300/Fax:919 807 9489 Mayor Steve Hooper,Town of Robbinsville December 22,2015 Page 2 of 3 project plans, specifications,and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0025879 issued effective February 1, 2014, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0025879. It is the Owner's responsibility to ensure that the as-constructed project meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number (828) 296 - 4500, shall be notified.at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. Mayor Steve Hooper,Town of Robbinsville December 22,2015 Page 3 of 3 A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ron Berry at telephone number (919) 807-6396. Sincerely f • S. Jay Zimmerman, P.G. Director, Division of Water Resources With Engineer's Certificate attached: cc: Michael Waresak, P.E. McGill Associates, P.A. 55 Broad Street Asheville, NC 28801 DWR Asheville Regional Office, Water Quality Programs Central Files NPDES File Without Engineer's Certificate attached: Graham County Health Department DWI/Bill Bland& Ken Pohlig I . Town of Robbinsville Robbinsville WWTP Authorization to Construct No. 025879A03 Issued December 22, 2015 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Robbinsville Wastewater Treatment Plant, located in Graham County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of tertiary filters overflow piping system to new belt press filtrate pump station system; installation of one (1) 50 GPM at 15.3 ft TDII sludge feed pump with VFD, piping, and controls; installation of a 55 gal drum polymer mixing/feed system to inject 10 lbs polymer per ton dry solids with containment, piping, and controls; installation of enclosed 350 lbs/hr (dry) belt filter press with VFD and incline dewatered sludge conveyor and one (1) 40 GPM at 203 ft TDH washwater booster pump, air compressor, collection basin, other containment, piping, and controls; installation of belt press filtrate pump station consisting of two (2) 350 GPM at 12.1 ft TDH submersible pumps, piping, and controls; installation of enclosed 4,200 lbs/hr sludge/lime mixer system with VFD and incline conveyer, contaimnent, and controls; installation of a lime storage and conveyance system consisting of one (1) nominal 30 ton (65 lbs/ft3) silo with filter bag house and controls for bulk truck unloading, bin activator, 1,000 lbs/hr volumetric screw feeder with VFD and transfer screw conveyer, piping, and controls; installation of a covered 12 yd3 retention bin storage, covered 150 yd3 dry storage, and containment area with catch basin; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date Mail this Certification to: Attn: Ron Berry 3 ilE,A Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh,NC 27699-1617