Loading...
HomeMy WebLinkAboutArbor Creek _Additional Info Request Response DWR_05062024TranSystems TRANSYSTEMS May 6, 2024 Catherine Otero 401 & Buffer Permitting Branch Division of Water Resources North Carolina Department of Environmental Quality 2400 Pershing Road, Suite 400 Kansas City, MO 64108 Tel 816 329 8600 www.transystems.com Su bject: Abor Creek Greenway (DWR #20201285 v2; SAW-2020-00572) Town of Holly Springs, Wake County Dear Ms. Otero, The following includes responses to the request for additional information request received April22, 2024. 1) 1. Please provide an agent authorization form [edocs.deq.nc.gov]. An Agent Authorization form is attached. 2) 2. Can you explain how the numbers on the buffer impacts map correspond to the numbers in the PCN and the overall buffer impacts on site? Please see the included screenshots. I am confused by how the circled impacts factor in as the starred impacts are the only ones included on your Version 2 PCN. A copy of the corrected buffer impact table is attached. During construction, the contractor identified an existing sewer line with a concrete encasement that sits above the natural streambed elevation. The contractor is going to have to shift the alignment of the greenway and drainage pipes, to avoid the sewer line. The original proposed alignment crossed over a sanitary sewer that had a concrete cradle that was not picked up during the survey. This cradle was too close to the surface to meet the proper culvert depths on the trail and to not negatively impact the immediate upstream properties. The culvert had to be realigned to miss the section of sanitary sewer. The proposed culvert length is 30 LF. [1] TRGNSYSTEMS Sincerely, Anna Reusche, PWS Senior Environmental Project Manager TranSystems [21 S E P I OFFICE: 919.789.9900DAX: 919.789.9591 / WWW EPIINC.COM3 AGENT AUTHORIZATION FORM All Blanks to be Filled in by the Municioal Official Name Matt Beard. Park Planner. Town of Hollv Sarin Address 128 S. Main Street, Holly Springs, NC 27540 Phone (919) 567-4018 Project Name/ Description Arbor Creek- Middle Creek Greenway Extension I, the municipal official, do hereby authorize SEPI Engineering & Construction, Inc. to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached for the above reference project. I hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. By: Matt Beard Print Name 3/25/2020 Date Signature X C E k � I Ln ) Q $ Lo cb � ! \ — > > %la � & \ { co w § § § d Q 2 k_ k_ 121 IE C > > � ■ k £ � � z .§ .§ 3 � � k k k E k 2 `M k k r k k � � m CN rL .6 c c w w co co k\ k k a CDa q N m c c 9 9 a a G w � ; _ CL .k � � [ \ cz C ( \ ( t a ; C E r § IL ¥ \