Loading...
HomeMy WebLinkAbout20240330 Ver 1_More Info Received_20240418 (5)Aprill6, 2024 NCDEQ Division of Water Resorirces 401 & Buffer Permitting Branch 512 North Salisbury Street Raleigh,NorthCarolina 27699-1611 Attention: Ms. Stephanie Goss, Supervisor SUBJECT: Response to Request for Additional Information: April 4, 2024 401 Water Quality Certification And Neuse River Buffer Authorization DWRNo: 20240330 Wilson County Southwest Water District Buckhorn Pressure Zone - Water System Extensions PN: 22-027 Dear Ms. Goss: We offer the following responses to your review comments, received by our office on April 4Th: Comment No. 1:The most recent version of the 1:24,000 USGS Topographic Map - Please cleanly draw or delineate the site boundaries on the topographic map. ResponseNo. 1: Pleme referencc capies of Lucama USGS Topographic Map for project cmssing lacatiws. Cornrnent No. 2:The most recent version of tl'ie bound and published County NRCS Soil Survey Map - Please clearly delineate the site boundaries, etc. on the map. If the delineation obscures any of the features, it is recornrnended that a clean copy be provided. Copies of the current soil survey and/or soil survey map sheets can be obtained from the local NRCS Corinty Office (http://www.nc.nrcs.usda.gov/). GIS soil layers are not acceptable. Response No. 2: Please referetxce copies of Wilson Coun$ NRCS Soils Mapping for project crossing locations. submitsion 2-23-241ttephanie goss-ncdeq-401-permiuing-comment-response-ltr(4-16-24) doc Ms. Stephanie Goss April 16, 2024 Page Two (2) Comment No. 3:An agent arithorization form for W Landon Younce of Green Engineering PLLC. Response No. 3: Please find attached Agent Authorization Form for W Landon Younce, as executed by the Coutdy Manager. Comment No. 4:Provide a key for the features on your site plans. ResponseNo.4: Please reference Key of Features now included Off each corresponditxgRevisedPlan Sheet, as requested. ComrnentNo. 5:The impact amounts need to be clearly identified at the corresponding impact locations on the site plan(s)/map(s). Response No. 5:Please reference tables on correspondmg Revised Platx Sheets, now reflectitig temporary impact amounts in square footages for each crossing location. Cornrnent No. 6:Update site plan(s)/map(s) to show buffer impacts and Zones 1 and 2. Response No. 6:Please reference Revised plate sheets, now reflecting corresponding shaded (hatched) areas for the buffer impacts, and Zones I & 2. Comment No. 7:Provide a map detailing the pump around design proposed for the site. RBsporxse No. 7:Please reference attached Revised Sheet 32A for Temporary In- Stream Pump Around Detail, to be utilized for some crossings, (FS deemed necessary. Length of stream work area shall not exceed that which is required by area disturbed by pipe installation trench. Comment No. 8:Detailed restoration plan for the impacted areas including how the impacted stream will be restored to match the existing stream width and bank slopes. submission 2-23-241stephanie goss-ncdeq-401-pe+mitiing-comment-response-lfr(4-16-24) doc Mr. William H. Denton, IV, PE April 16, 2024 Page Three (3) Response No. 8:Please reference attached Revised Sheet 32A for Stream Crossing Construction and Repair Notes. Notes are included which require timber reinforcement, if txecessary to reinforce steeper stream banks where matting alone is itisufficietit for stabilization. Length of stream work area s/ta// not exceed that which is required by area disturbed by pipe imtallation trench. Comment No. 9:Provide which Uses from the Table of Uses in the Neuse Buffer Rule (Title 15A NCAC 02B .0714) yori are proposing to fit your buffer impacts rmder. Response No. 9:This project proposes to install (notx-electric utiliffl) new water main across existing buffers, roughly perpendicular to each stream, at 10 fi. wide, and with minimal impacts to the buffered areas {IS "allowable", according to the Neuse Buffer Rule (Title I 5A NCAC 02B .0714) I trust that with this additional information you will be able to complete yorir review. However, should you require additional information, please advise. Respectfully, W. Landon Younce, PE WI,Y Enclosures: As stated. submission 2-23-241sieplianie goss-ncdeq-401-perniitting-comment-response-fir(4-16-24) doc