Loading...
HomeMy WebLinkAbout210010_Application_20240308 State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non-Discharge General Permit On September 30,2024,the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore,all applications must be received by the Division of Water Resources by no later than April 3,2024. Please do not leave any question unanswered Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Certificate Of Coverage Number: AWS210010 2. Facility Name: A.J.Smith&Sons-Ine _- 3. Permittee's Name(same as on the Waste Management Plan): A J Smith&Sons Inc 4. Permittee's Mailing Address: 601 Greenhall Rd City: Edenton State: NC Zip: 27932 Telephone Number: 252-333-5111 Ext. E-mail: &XaradisemoduceAgmail.com 5. Facility's Physical Address: 430 Greenhall Rd City: Edenton State: NC Zip: 27932 6. County where Facility is located: Chowan 7. Farm Manager's Name(if different from Landowner): Fred R Smith S. Farm Manager's telephone number(include area code): 252482-8977 Ext. 9. Integrator's Name(if there is not an Integrator,write"None"): Murnhy-Brown LLC 10. Operator Name(OIC): Fred R.Smith Phone No.: 252-333-5111 OIC#: 17748 11. Lessee's Name(if there is not a Lessee,write"None"): 12. Indicate animal operation type and number: Current Permit: Operations 1)rpc Allowablc Count Cattle-Beef Feeder 60 Swine-Feeder to Finish 6,216 Operation Tvnes: Swine Cattle Dry Poultry Other Tvnes Wean to Finish Dairy Calf Non Laying Chickens Horses-Horses Wean to Feeder Dairy Heifer Laying Chickens Horses-Other Farrow to Finish Milk Cow Pullets Sheep-Sheep Feeder to Finish Dry Cow Turkeys Sheep-Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment Lagoons,Digesters and Waste Storage Ponds(WSP):(Fill/Verify the following information. Make all necessary corrections and provide missing data.) Structure Type Estimated Liner Type Estimated Design Freeboard Structure (Lagoon/Digester/ Date (Clay,Synthetic, Capacity Surface Area "Redline" Name WSP) Built Unknown) (Cubic Feet) (Square Feet) (Inches) 1 Lagoon 1/1/1992 Full,clay 1,292,884.00 148,104.00 19.00 Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.1OC(d),either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1.The most recent Waste Utilization Plan(WUP),signed by the owner and a certified technical specialist.containing: a. The method by which waste is applied-to the-disposal fields(e.g.irrigation,injection,etc.) b. A map of every field used for land application(for example:irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2.A site map/schematic 3.Emergency Action Plan 4.Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6.Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist 7.Lagoon/storage pond capacity documentation(design,calculations,etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations,wetland determinations,or hazard classifications that may be applicable to your facility. 8.Operation and Maintenance Plan If your CAWMP includes any components not shown on this list,please include the additional components with your submittal. (e.g.composting,digesters,solids separators,sludge drying system,waste transfers,etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included,this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C.Section 1001 provides a punishment by a fine of not more than$10,000 or imprisonment of not more than 5 years,or both for a similar offense.) Print the Name of the Permittee/Landowner/Signing Official and Sign below.(If multiple Landowners exist,all landowners should sign. If Landowner is a corporation,signature should be by a principal executive officer of the corporation): Name(Print): _ ��� Sin, IT H Title: V Signature: l(,c Date: Name(Print): Title: Signature: Date: Name(Print): _ Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animaLoperations@deq.nc.gov NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh,North Carolina 27699-1636 Animal Waste Management Plan Certification (Please type or print all information that does not require a signature) General Information: Name of Farm: AJ Smith&Sons Farm Facility No: 21-10 Owner(s)Name: Fred Smith Phone No: 252-333-5111 Mailing Address: 601 Greenhall Rd Edenton, NC 27932 Farm Location: County Farm is located in: Chowan Latitude and Longitude: 76 37' 55" / 36 07' 10" Integrator: Murphy Brown Please attach a copy of a county road map with location identified and described below(Be specific: road names, directions, milepost, etc.): Located on SR 1316, Greenhall Rd. approximately 5 miles north of Edenton. Operation Description: Type of Swine No.of Animals Type of Poultry No.of Animals Type of Cattle No.of Animals 0 Wean to Feeder -r- 17-11 Layer Dairy Eby Feeder to Finish Pullets 0 Beef 60 [] Farrow to Wean [] Farrow to Feeder Farrow to Finish [] Wean to Finish [� Gilts [] Boars Acreage Available for Application: 107 Required Acreage: 107 Number of Lagoons/Storage Ponds: 1 Total Capacity: 1,292,884 Cubic Feet(ft3) Are subsurface drains present on the farm: Yes or I No (please circle one) If YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD(please circle one) Owner/Manager Agreement I (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we)understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25-year, 24- hour storm and there must not be run-off from the application of animal waste. I (we)understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conservation Service. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. I (we) know that any modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to implementation. A change in land ownership requires written notification to DEM or a new certification (if the approved plan is changed)within 60 days of a title transfer. Name of Land Owner: cy`` � �- S©y,S Signature: Date: Name of Mager(if different from owner): Signature_ / 4- Ann'_ L, Date i� AWC -- August 1, 1997 1 Technical Specialist Certification I. As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005. 1 certify that the animal waste management system for this farm named above has an animal waste management plan that meets or exceeds standards and specifications of the [Division of Environmental Management (DEM) as specified in 16A NCAC 2H.201 and the USDA-Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001.0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC, 1), the technical specialist should only certify parts for which they are technically competent. H. Certification of Design A) Collection. Storage,Treatment System Check M5,poropdato box Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity: storage capability consistent with waste utilization requirements. O New expanded or retrofitted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address(Agency): P.O. Box 856,Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: _ Date: 10-ke-�-Zs-1 U B) Land Application Site(WUP) The plan provides for minimum separations(buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management hydraulic and nutrient loading rates. i Name of Technical Specialist (Please Print): Toni King Affiliation Murphy-Brown, LLC Date Work Completed: Address(Agee ): P.O. Box 856,Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: Date: \o 'ZOt" C) Runoff Controls from Exterior Lots Check the appropriate box pro [Ka Facility without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. 0 Facility with exterior lots (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address (Agency): P.O. Box 856,Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: Date: tl� —ZOLe AWC--August 1, 1997 2 D). Applicalion and Handling E ui ment check the propriate box NY Existina or expanding facility with existing waste application eqq!pment(WIJP or I) Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates. A schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). ❑ New exi>anded or existing facility without existing waste application equipment for spray irrigation. (1) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan: (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established: required buffers can be maintained: calibration and adjustment guidance are contained as part of the plan). ❑ New: expanded or existing facility without existing waste a pli,�tion equipment for land spreading not using spray irrigation, (WUP or 1) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan: (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates: a schedule for timing of applications has been established; required buffers can be maintained: calibration and adjustment guidance are contained as a part of the plan). Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address(Age cy): P.O. Box 8 6,Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: Date: gyp- 1 ,�o E) Odor Contro nsect Control Mo ality Mabagement and Emergency Action Plan SD. SI, WUP, RC or 1) The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan, Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Management Plan and the Emergency Action Plan are complete and can be implemented by this facility Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address(Agen y): P.O. Box 856,Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: = Date: 10 -la ,-) o , F) Written Notice of New or Expanding Sm e Farm The following signature block is only to be used for new or expanding swine farms that begin construction after June 21, 1996. If the facility was built before June 21, 1996, when was it constructed or last expanded I (we)certify that I (we)have attempted to contact by certified mail all adjoining property owners and all property owners who own property located across a public road,street or highway from this new or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-805. A copy of the notice and a list of property owners notified is attached. Name of Land Owner: Signature: `Date: Name of Manager(if different from owner): Signature: Date AWC --August 1, 1997 3 111. Certification of Installation A) Collection, Storage,Treatment Installation New,expanded or retrofitted facility (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Address(Agency): Phone No.: Signature: Date: B) Land Ap-plication Site(WUP) Check the/appropriate box cropping system is in place on all land as specified in the animal waste management plan. 0 Conditional Approval: all required land as specified in the plan is cleared for planting: the cropping system as specified in the waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by__ _ _ (month/day/year); the proposed cover crop is appropriate for compliance with the waste utilization plan. E3 Also check this box if appropriate If the cropping system as specified in the plan can not be established on newly Geared land within 30 days of this certification,the owner has committed to establish an interim crop for erosion control: Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address (A�gerfft P.O, Box 856,Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: Date: This following signature block is only to be used when the box for conditional approval in III. B I (we) certify that I (we) have committed to establish the cropping system as specified in my (our) waste utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me(us)to an enforcement action from DEM. Name of Land Owner:_ Signature: Date: _ Name of Manager(if different from owner): Signature: Date AWC--August 1, 1997 4 C) Runoff Controls from Exterior Lots (RC) Facility with exterior lots Methods to minimize the run off of pollutants from lounging and heavy use area have been installed as specified in the plan. For facilities without exterior lots, no certification is necessary Name of Technical Specialist(Please Print): Affiliation Date Work Completed: _ Address(Agency): Phone No.: Signature: Date: D) Application and Handlinc; Ecui?ment Installation (WUP or 1) Check the appropriate bl Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as part of the plan. 0 Animal waste application and handling equipment specified in the plan has not been installed but the owner has produced leasing or third party application and has provided a signed contract: equipment specified in the contract agrees with the requirements of the plan: required buffers can be maintained: calibration and adjustment guidance have been provided to the owners and are continued as part of the plan. Conditional approval: Animal waste application and handling equipment specified in the plan has been purchased and will be on site and installed by (month/day/year); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping I system contained in the plan; and calibration and adjustment guidance have been i provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address (Agen ): P.O. Box 856, Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: Date: 'lam_ --t Qk The following signature block is only use en the box for conditional approval in III D above has been checked. I (we) certify that I (we) have committed to purchase the animal waste application and handling equipment as specified in my(our)waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within 15 days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me(us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager(if different from owner): Signature: Date _ E)Odor Control, Insect Control and Mortality Management(SD SI,WUP, RC or I� Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system in the Plan has also been installed and is operational. Name of Technical Specialist(Please Print): Toni W. King _ Affiliation Murphy-Brown, LLC Date Work Completed: Address(Age y): P.O. Box 856, Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: ' Date: \O —k—p --2 0, t� AWC--August 1, 1997 5 4 Please return the completed form to the Division of Water Quality at the following Address: Department of Environment health and Natural Resources Division oV Water Gality Water Quality Section, Com liance Group P.O. Box 29536 Raleigh,NC 27626-0535 Please remember to submit a copy of this form along with the complete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your files with your Animal Waste Management Plan. AWC --August 1, 1997 6 Afurphy-Brown, LLC 9/27/2016 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Fred Smith Farm Name: A.J.Smith and Sons Facility 21-10 Count : Chowan Permit Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish 6216 Gilts Cattle 60 Storage Structure: Anaerobic Lagoon Storage Period: >180 days Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils,when it is raining,or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWR regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution,the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1of11 This plan is based on the waste application method shown above. If you choose to change methods in the future,you need to revise this plan, Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste Is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made,which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH In the optimum range for specific crop production. This waste utilization plan,if carried out,meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons,W,tons,etc.): Capacity Type Waste Produced per Animal Total Farrow to Wean 3203 gaUyr gallyr Farrow to Feeder 3861 gallyr gallyr Farrow to Finish 10478 gaUyr gal/yr Wean to Feeder 191 gallyr gallyr Wean to Finish 776 gal/yr gal/yr 6216 Feeder to Finish 927 gal/yr 5,762,232 gal/yr Gilts 1016 gallyr gal/yr 601 Cattle 6662 gal/yr 1 399,720 gal/yr Total 6,161,952 gal/yr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (ibs): Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 3.84 Ibslyr Ibslyr Farrow to Feeder 6.95 Ibslyr Ibs/yr Farrow to Finish 18.86 Ibslyr Ibstyr Wean to Feeder 0.34 Ibs/yr Ibstyr Wean to Finish 1.4 Ibs/yr Ibstyr 6216 Feeder to Finish 1.67 Ibs/yr 10,381 Ibslyr Gilts 1.83 Ibs/yr Ibstyr 601 Cattle 1 11.44 Ibs! r 686 Ibstyr Total 11,067 Ibstyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 107 Total N Required 1st Year: 18724.84 Total N Required 2nd Year: 0.00 Average Annual Nitrogen Requirement of Crops: 18,724.84 Total Nitrogen Produced by Farm: 111,067.12 Nitrogen Balance for Crops: (7,657.72) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics,and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of11 m co N N N Cl)O r 0 to1. In N » hOrO00M CCD D MN n rpO pM��00 Ne-�pf�nGOp ypp 1yf1 N CO 001 YMl fD»f0 N CD N sn-M a N rn N 0.2 P a M♦p N GOr m m N^OHn Nt00`��` »OImNr » V r W NN O iT» V F. a7�Ir V MP NMN r c9 NMM rM[7 F V O C1 O M�OI�!! p a Ip Ifi �Z m SOO aDM$NOw OOO !p0»01000 0 co NO W»O p O F' A O VNrm V N0 » »pNOr W M»cm O Vf O N EDN O]m M1n W r'n J Z� p a O O O O p p P 0 0 0 0 0 0 0 0 0 0 Z O �a o00 000000000P o000000000 0000000000 J =2p� J� Q C 0z N a Qv u m c� N $_ m � cL a Pe VC i Y . ♦ ♦ ♦ R ♦ Y Y N U Z9 cD fG N N m» »� to G00 IANM OOMlm r 0 o o r .pv;a?a?p O N ph�O p O V 00 PM'f NN Or CAM�O�pp Nm L6N3 wci N�N N OGODNn V 1+N10N » 10 N O!r P Ln O Im n N H h W V z O00 N pN»r NIN N 'M n On Nr[+NI �a NN IA OQNOM[MNm— 1U cs OnNN�OOf tto �p»Ogp001�Plfl w�P rmNrr�r N'V-'INrm �4 rMr aW z 21 J a. :e ll�� ��+7! Q 7 w 2 m » » pn m N -a m In VI N pp»Y> V z »»» Mpvpi�OMi lNn.rn�N Am01ry 0QNim rnP olPn nmOOOallo of 70l�N b V V V N OCr e=MN C:lC r^M r r M N co- : r� Q 0 0 0 »O»p»O�O O O C) m lV(V N ppOCCN" �} fV n lV���Mr t��p rNN ,O r no O GO r »M» r r n »(�!» c r m "!� FaQ nv �LL� cl a n $ �'�cn� `z�'iv, $ u �i¢ v v v p N LciYG� c� u) �ssgg CC ~ aiga ugi(A uu))Tnvv) � o �!mo m co wmmmmwmmmm mmmm w oo co ao mm ISQf IA N N »II7»»»NIA IAN IA NN N NN N N N N N NNNNN N NNNN Q y U L m .-N M a0 r N M Q tL C M� O G �j • u 4 =c R� F� 2 H A Q J QR s za �a CL �z a a em a a O,a V m •g N O N EQ a Q,ms U O cU N Z 9 O ,s 2 a �a J QR 3 2 a a J� Q� V m 4 gn um �Y .O+ EQ h a O ro U� «%U C WH O R �4 10 v Q IL G 0 — fl. u F o a This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future,regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields(i.e.small grain,etc, interseeded in bermuda),forage must be removed through grazing,hay,and/or silage. Where grazing,plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain,etc,is to be removed for hay or silage,care should be exercised not to let small grain reach maturity,especially late in the season(i.e, April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation,you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season,depending on the time small grain is planted in the fall. The ideal time to interplant small grain,etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Description-Harvested As A Barley Grain Crop B Grazed Hybrid Bermudagrass Pasture/Grazed C Hybrid Bermudagrass Hay Hay B/C Comb. Hybrid Bermudagrass Graze/Hay Combination D Corn-Grain Grain Crop E Corn-Silage Silage F Cotton Cotton Lint G Grazed Fescue Pasture/Grazed H Fescue Hay Hay I Oats Grain Crop J Rye Grain Crop K Grazed Overseed Pasture/Grazed(Seeded in Bermudagrass) L Overseed Hay Flay(Seeded in Bermudagrass) M Grain Sorghum Grain Crop N Wheat Grain Crop 0 Soybean Grain Crop P Pine Trees Pine Trees S Small Grain Grain Crop/Hay(After Grain Crop) CC Cover Crop Not Harvested;Burned/Disked In SWG Swithgrass Biomass Crop Acres shown in the preceding table are considered to be the usable acres excluding required buffers,filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may,and most likely will be,more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of11 `I SLUDGE APPLICATION: t The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm S}ecifications _PAN/vr/animal Farm Total/ r Farrow to Wean 0.8 Farrow to Feeder 0.96 Farrow to Finish 3.9 Wean to Feeder 0.07 Wean to Finish 0.27 6216 Feeder to Finish 0.34 2113.44 Gilts 0.39 60 Boars 0.55 33 i The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2146.44 pounds of plant available nitrogen per year and will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years,you will have approximately 10732.2 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre,you will need 35 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre,you will need 85.8576 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type,crop,and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content,soil structure,soil texture,water droplet size,and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the i plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan,it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations,the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for>180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of11 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inlhr *inches T1032 1 StA,AaA Sage 0.5 1 T1032 2 MuA,At Sage 0.65 1 T1032 3 At,AaA Sage 0.35 1 1ptional Cro 1 StA,AaA 3r Sorghurr 0.5 1 StA,AaA Soybeans 0.5 1 StA,AaA Wheat 0.5 1 StA,AaA Small Grair 0.5 1 StA,AaA Cotton 0.5 1 StA,AaA Corn 0.5 1 StA,AaA Triticale 0.5 1 StA,AaA Onions 0.5 1 StA,AaA Cover 0.5 1 StA,AaA Peanut 0.5 1 2 MuA,At 3r Sorghurr 0.65 1 MuA,At Soybeans 0.65 1 MuA,At Wheat 0.65 1 MuA,At Small Grair 0.65 1 MuA,At Cotton 0,65 1 MuA,At Corn 0.65 1 MuA,At Triticale 0.65 1 MuA,At Onions 0.65 1 MuA,At Cover 0.65 1 MuA,At Peanuts 0.65 1 3 At,AaA 3r Sorghurr 0.35 1 At,AaA Soybeans 0.35 1 At,AaA Wheat 0.35 1 At,AaA Small Grair 0.35 1 At,AaA Cotton 0.35 1 At,AaA Corn 0.35 1 At,AaA Triticale 0.35 1 At,AaA Onions 0.35 1 At,AaA Cover 0.35 1 At,AaA Peanuts 0.35 1 6of11 Additional Comments: This NUP changes this plan from a 6216 feeder to finish to a 5594 gilt farm. No crop changes or field/irrigation changes have been made but the plan has been updated to include all of the new production and RYE rates as provided on the NCSU website. This Sage should be applied on as follows: 60 Lbs N in Oct 30 Lbs N Feb 45 Lbs N Mar 40 Lbs N April Though plan is written for Sage, producer may use any combination of optional crops as long as he utilizes the 10,923 Ibs N produced per year. Revised 9/27/2016 to revert back to originally permitted type and capacity of 6216 Feeder to Finish with no other changes. 7of11 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: A.J.Smith and Sons Facility 21-10 Owner: Fred Smith Manager: OwnedManager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities,will require a new nutrient management plan and a new certification to be submitted to DWR before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWR upon request. Name of Facility Owner: Fred Smith Signature: Date Name.of.Manager(if different from owner): Signature: Date Name of Technical Specialist: Toni W. King Affiliation: Murphy-Brown, LLC. Address: 2822 Hwy 24 West,PO Drawer 856 Warsaw, NC 28398 Telephone: (910) 293-3434 Signature: L° Date 8 of 11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 1 Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393- Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland.When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 90111 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways,or wetlands by discharge or by over-spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses,and on other grassed waterways,waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers,toilets, sinks, etc., shall not be discharged into the animal waste management system. 10 of 11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation.Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion,leakage,or discharge. 18 If animal production at the facility is to be suspended or terminated,the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge,pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption,it should only be applied pre-plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate-determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate.Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 11 of 11 W d 'O U CL a a- `D m (� O O C7 CO 04 C O O r O C G 4d. N (13 r V ZZ N 3 $ "a wa C M W10 A N JJJJJJ JJ JJJJJJJJ JJ JJJJ O g c3 t'os COLg) J WWWWWWWWWWWWWWWWWWWWWW O L- O Vo W� Q) W =_ = = _= __ _ = = _ _ _ _= = _ _= _= z) E +�5• O 2 zzzzzzzzzzzz » zzzzzzzz c O c � c y - a E w L V J O m e € q W O c� 0. y 0) qr O) ao N 17 O> co 0 !'- U m N � e Q m � � p a_ z c z ■L V r M In 2 0 1n w w v In i�N W) 0 Of M tC) N M r U O c � E n 91 O U -p c0 0) cp cl q: . �n O p ch ri cM wi N r cO M M 6 V U = a G 9 � ' N E u OQ cprOCOhI` (OOC 01N Lnr rM --MOOrcC(Olgr 11) C1 U Z H � I € WU 9`� Mv40I- 000r NMwT Cl)pp E a 7i •� EN - MMMMw 6 `o c o _ m c o i ft } lc' � '•act 1 :• 'A', CO' E a U R;1. n1 cry �1 S ! R 8p o•i0 a E co s r m I S y T ■ :t Xt '°c N 12 _ a c o OE (V cr, UPI •P�" a •�F W a o41 t MAAA > € � j nLLY r M ow ■ r ■ �� Q O , CL € Z ■ .. � E H Y l • ' y } c rOL O O ^ ! 1 O'a 9 ai CL m ic c a/ Y al zE ' m c ! ky U. N � ' fnc cc M _ 9r E a c m Q p z ti A 1 �y IL N T� N a i� CO N LA � c CL N ,C c Vr/ � C E 32y d.Q Z C M C C y N a.Uj MCL N G (D t � a b 1 , M a t 2 0) L U r r 1 Ig � Q o W 0090 c0z W K�.� 8 N J N m to E V •� ENo V 0- V 0 U2vc ,I c o t i c d r� I00 F i 3 y M a"ti 9 V G � c a � E N N C tr 8' 'c n o to ,+ mid G7 W v $ t au Z Env q' ENS w t 1. ~2CL U N C � C`•C N 3 O aJ C Z�0 O o•a CLr W � a {- N ,r a m d L' E 10 6 I � c � d i a v� ayi 0 (0Ew °oe aiv t - - Grower: AJ SmithSons-(Fred Smith) Designed y: KBW Address: 601 Greenhall Rd Checked By: DSE Edenton, NC 27932 Date: 09/30/16 County: Chowan Sheet 1 of 7 ANAEROBIC WASTE LAGOON DESIGN FARM INFORMATION Farm Population: Nursery: ------------------- 0 Wean to Finish: ------------------- 0 Finishing: —----------------- 6216 Hd. Farrow to weanling: —----------------- 0 Farrow to feeder: ------------------ 0 Farrow to finish: ------------------ 0 Boars: ------------------ 0 Storage Period: ---------------- 180 Days 25 Yr./24 Hr Storm Event ---___.________ 7.1 In "Heavy Rain"Factor Not Applicable Rainfall in Excess of Evaporation 7.4 In. Additional Water Usage: —----------- 0 Additional Drainage Area: ------------------ 0 LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (YIN)--------- N Does Operator Want Emergency Spillway? (Y/N)--------- N Was This Design Built Prior to Sept. 1996? (Y/N)------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N)-------- N Seasonal High Water Table Elev: —---------------- 0.00 Freeboard: —----------------- 1.0 Ft. Emergency Spillway Flow Depth: Not Applicable Side Slopes: _--------------— 2 :1 (H:V) Inside Top Length: -------------- 652.4 Ft. Inside Top Width: ------------------ 247.4 Ft. Top of Dike Elevation: ---------------• Depth 21.70 Ft. Finished Bottom Elevation: —------------- 10.10 Ft. 11.60 Ft. Start Pump Elevation: -------------- 19.32 In. 20.09 Ft. Stop Pump Elevation: --------------- 46.8 In. 17.80 Ft. LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES %REQ'D. Storm Stor= 95497 (Cu.Ft.) 96,838 (Cu.Ft.) 100.36% Temporary= 304461 (Cu.Ft.) 347,076 (Cu.Ft.) 114.00% Permanent= 839160 (Cu.Ft.) 849,970 (Cu.Ft.) 101.29% Total Volume= 1,239,118 (Cu.Ft.) 1,292,884 (Cu.Ft.) 104.34% 1/2 Treatment Volume= 419,580 (Cu.Ft.) 1/2 Treatment Volume Elevation= 14.86 Ft. 82.12 In. 90 Temporary Storage Volume Elevation= 18.77 Ft. 35.11 In. Min. Required Liner Thickness ------------------ 1.5 Ft. Lagoon Surface Area: (Inside TOD) ------------------- 161,404 S.F. Murphy-Brown,LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293-3434 Grower: AJ SmithSons--re Smith) Designed y: KBW Address: 601 Greenhall Rd Checked By: DSE Edenton, NC 27932 Date: 09/30/16 County: Chowan Sheet 2 of 7 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: I ACu. Ft. LAGOON STAGE-AREA VOLUMES Contour _Elevation (FTJ Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. FT) 11.60 126,684 0 12.00 127,997 50,936 50,936 13.00 131,302 129,649 180,586 14.00 134,639 132,970 313,556 15.00 138,007 136,323 449,879 16.00 141,408 139,708 589,586 17.00 144,841 143,125 732,711 18.00 148,306 146,573 879,284 19.00 151,803 150,054 1,029,339 20.00 155,331 153,567 1,182,905 21.00 158,892 157,112 1,340,017 21.70 161,404 112,104 1,452,121 These volumes were calculated using the vertical average end area method. TOTAL READ VOL 1,239,118 CF CUMULATIVE VOL. ZONE VOL. 104.34% END PUMP = _ _ = 17.80 FT .849,970 CF TR'MT. 849,970 101.29% START PUMP = _ = 20.09 FT 1,197,046 CF TEMP 347,076 114.00% MAX STORAGE = 20.70 FT 1,292,884 CF STORMI 95,838 100.36% Murphy-Brown,LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293-3434 Grower: AJ Smith&Sons(Fred Smith) Designed By: KBW Address: 601 Greenhall Rd Checked By: DSE Edenton, NC 27932 Date: 09/30/16 County: Chowan Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: nimal Type apacdy AL (cu. ./I = otal Nursery 0 30 1.00 0 Wean to Finish 0 115 1.00 0 Finishing 6,216 135 1.00 839,160 Farrow to weanling 0 433 1.00 0 Farrow to feeder 0 522 1.00 0 Farrow to finish 0 1,417 1.00 0 Boars 0 400 1.00 0 Total Required Treatment Volume(cu.ft.)-- 839,160 Sludge Storage Volume: nimaType apacity cu. .lb) Total Nursery 0 30 0.00 0 Wean to Finish 0 115 0.00 0 Finishing 6,216 135 0.00 0 Farrow to weanling 0 433 0.00 0 Farrow to feeder 0 522 0.00 0 Farrow to finish 0 1,417 0.00 0 Boars 0 1 400 0.000 0 Total Required Sludge Storage Volume(cu.ft.)= 0 Temporary Storage Volume: Manure Production: rnmaType ----Capacity Sto. Period d.iday)=Total Nursery 0 180 0.30 0 Wean to Finish 0 180 1.17 0 Finishing 6,216 180 1.37 1,532,866 Farrow to weanling 0 180 4.39 0 Farrow to feeder 0 180 5.30 0 Farrow to finish 0 180 14.38 0 Boars 0 1 180 4.06 0 Total Manure Production(gals.)= 1,532,866 Total Manure Production(cu.ft.)= 204,929 Excess Fresh Water: jAnimal Type Capacity Sto. Period d.l ay)=Total Nursery 0 180 0.00 0 Wean to Finish 0 180 0.00 0 Finishing 6,216 180 0.00 0 Farrowto wean ling 0 180 0,00 0 Farrow to feeder 0 180 0.00 _ 0 Farrow to finish 0 180 0.00 0 Boars 0 180 0.00 0 Total Fresh Water Excess(gals.)= 0 Total Fresh Water Excess(cu.ft.)= 0 Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910)293-3434 Grower: AJ Smith&Sons (Fred Smith) Designed By: KBW Address: 601 Greenhall Rd Checked By: DSE Edenton, NC 27932 Date: 09/30/16 County: Chowan Sheet 4 of 7 Temporary Storage Volume: (Cont.} Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area+Additional Drainage Area)*Rainfall/12in./ft Vol.= (161404 sq.ft. + 0 sq.ft.) * 7 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap.(cu.ft.)= 99,632 Storm Storage: Val.=(Lagoon Surf. Area+Addt'I Drainage Area)*25Yr./24Hr. Storm(in)/12in./ft. Vol.= (161404 sq.ft + 0 sq.ft.) * 7.1 in. /12 in./ft. Total Required Volume for 25Yr.124Hr.Storm Event(cu.ft)= 95,497 "Heavy Rain"Storage: Vol.=(Lagoon Surf.Area+Addt'I Drainage Area)*"Heavy Rain" Factor(in)/12in./ft. Vol.= (161404 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for"Heavy Rain" (cu.ft.)= 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 0 Total Required Storm Storage (25Yr./241-1r. Storm+'Heavy Rain')= 95,497 (CU.FT) Total Required Temporary Storage (Manure Prod. +Excess Fr. Water+ Rainfall Excess+Additional Water Storage) = 304,461 (CU.FT) Total Required Permanent Storage (Treatment+Sludge)= 839,160 (CU.FT) TOTAL REQUIRED VOLUME= 1239118(CU.FT.) Murphy-Brown, LLC Engineering P D. Box 856, Warsaw NC 28398 (910)293-3434 Gr-ower: AJ Smith&Sons(Fred Smith) Designed By: KBW Address: 601 Greenhall Rd Checked By: DSE Edenton, NC 27932 Date: 09/30/16 County: Chowan Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation ------------------- 21.70 FT. Emergency Spillway Crest Elevation ------------------ Not AF Applicable Top of 25Yr./24Hr.Storm Storage ----------------- 20.70 FT. Top of"Heavy Rain"Storage ---------------- Not Applicable Start Pump Elevation ------------------ 20.09 FT. End Pump Elevation ---------------- 17.80 FT. Top of Sludge Storage ------------------ Not Applicable Seasonal High Watertable Elev. ------------------- 0.00 Finished Bottom Elevation --------------- 11.60 FT. Inside Top Length ------------------ 652.40 FT. Inside Top Width ----------------- 247.40 FT. Side Slopes ------------------- 2:1 H:V Lagoon Surface Area ---------------- 161,404 SF Min.Liner Thickness(if required) ------------------- 1.5 FT. Freeboard Depth ------------------- 1.00 FT. Temporary Storage Period ----------------- 180 Days TOTAL DESIGN VOLUME=1292884(CU.FT.) M Zone Depths: Treatment/Sludge Storage Zone Depth---------- 6.2 FT. Temporary Storage Zone Depth ---------- 2.3 FT. Freeboard/Storm Storage Zone Depth ----------- 1.6 FT. Total Lagoon Depth ---------- 10.1 FT. Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910)293-3434 f I i E x CjD C) ' 1 � w 0 Y � �- — a� Q d. �Q alb � o v N 1 = O CO r�- O O 0 N O � II O O O > O (4 N N W ti r T- II II W 11 II W 0 W W rn o Y w o a o0 V) W ° LL N o lu W O W W W m 12 H O `� O w o a LL a uw z a z °p N ° o 0 - a E - V L CN O = N U) ca U otS Z HE! a) �0 � p O 01 (D C N C � O � 0 II �QcoWU CbC CL W � a w u �, � a U a) c I— C� Q U N W J 3 m a., Q L a Grower: AJ Smith&Sons(Fred Smith) Designed By: KBW Address: 601 Greenhall Rd Checked By: DSE Edenton, NC 27932 Date: 09/30/16 County: Chowan Sheet 7 of 7 This livestock waste treatment lagoon is designed in accordance with the United States Natural Resources Conservation Service PRACTICE STANDARD 359-WASTE TREATMENT LAGOON, revised prior to June, 1996. Emergency Spillway: An Emergency Spillway is not required. NOTE: See attached Waste Utilization Plan DESIGNED: DATE: COMMENTS: This design is update of start and stop pump elevations and to show the 1/2 treatment volume level for sludge storage. This design does not supersede the original certification of the farm. Based on original lagoon design from G. Douglas Jones 4-8-92 Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 System Calibration Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. *Reprinted for Certification Training for Operations of Animal Waste Management Systems Manua! I OPERATION & MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant(such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter / early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer 1 early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: • Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. • Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying,the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes— look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes 2 Lagoon surface -- look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment-- look for: 1. settlement, cracking, or"jug" holes 2. side slope stability-- slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps -- check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation, An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure, You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. • Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height 3 Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occur at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 • Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. • Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). • Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer / early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. • Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. • Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. • Maintain strict vegetation, rodent, and varmint control near lagoon edges. • Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: 5 • proper lagoon sizing, • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and • require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. • Mix the sludge and lagoon liquid with a chopper-agitator impeller pump through large - bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag-line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil-test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. 6 The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure--an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levels-- high levels are a safety risk. • Failure to inspect and maintain the dam. • Excess surface water flowing into the lagoon. • Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: if lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. r •t EMERGENCY ACTION PLAN PHONE NUMBERS DWQ 919-9yL - G y;1 EMERGENCY MANAGEMENT SYSTEM 919- y7.t- ?6,6� SWCD 919-Y71 - Y/A7 NRCS 919-`/7"- '?137 This plan will be implemented in the event that wastes from your operation are leaking,' overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. . You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow-possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. C. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field-actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. C. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers-action include: a. Stop recycle pump. b. Stop irrigation pump. C. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D: Leakage from flush systems, houses, solid separators-action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. often this is seepage as opposed to flowing leaks- possible action: a. Dig a small well or ditch to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. C. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property) ? h. How much reached surface waters? 3 : Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone 919-1q6 . After hours, emergency number: 919- 733-3942 . Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number 919-`/92 -YWS' . C. Instruct EMS to contact local Health Department. d. Contact CES, phone number 919-YQ-�--M , local SWCD office phone number 919-Y54-'f/:27 , and local NRCS office for advice/technical assistance phone number 919-Y92 - 7937. 4: If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off-site damage. a. Contractors Name: A//cn b. Contractors Address: c. Contractors Phone:_ 6: Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc. ) a. Name: d;l/ b. Phone: '/82 - 74/37 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. da uda/nosh/wardlam paetpla n.dex soft 12.96 r 1 1 %1 J i•; J 'L J I N Cp CA en es zn .0 ~ C <: , j yUi •'� " - a u C S v .>` 0 4.0 Li G; ? Z _ z Cl) — tj U ^ t E E U t n . 3 � i § i\ .zr ; , � • � g ` U � � �� � \ B � � e • a 2 : - /� / . - � ? ) S � £ . e e — k 2 S 2 = § .g 2 8 2 $§ 2 7 f u / E U / = Zae e § # ] 2 - ; E ) 2 S § n ' G _ = 2 SCa j ! 8 cc � � \ 2 2 § � \ f / \ / g N e _ E §•� ] 4.0 va & \ / � | | � - � \ � / \� 2 < § < §\ \ � �2 5UQUUUUUUU2 < ZZZZZZZZZ I I � 2 / \ » § o Q aG2 � Ul � c � « _ 3 u 2u ] 2 § 2 k / � - Z & 0 E c § 2 < ,. to 3 E / \/ kk � k cUS _ � 2 2 5 S � � ■; : . 2 . ; _ ! kj 6. / § § k « 2J i cn @ 2 Z � f= 2 / 7 S 3 - - g / c 9Ij ; \ - � - - � • � § � � tj : §|) — . u u @ ,¥ a § : 5 ^ - § , : e c 3 = \ - / $\ u Q 2 C 7 a C� a d _ � c i. w rn m 10 Cif) �. p ai c °o on c O c o lu 0 to w > CO y o C > N 3 >v > O -0 C OOn OF, O 3r V V V N O coN p K C > r� C7 A 3 cn A w 0 A . w w 3www Vww A o > V y 3 G� U O RS U dQ .d V Cis O y y v� V a. ed Cd a� �s c o i a A 9 c3 O O O bA a. to 0 CN 3 A a > A A Qa Q V i -d w m v, z � ,°� `C chi o `� o u u Aa u u 3 V c o b p o : o 0.) aio an a c O .�° i 'a ° EL Z .oCO Co O o .y b 3 °on y ° tz a, Vi G y Cts m fir b�A Nco > Cd O _ p O C 0> : w O 0 CO En CA to •G .� O 'C i. v O O Y c1 V rpn O w c°c ri � w 5 a U b m b � bbt � )m) b SOS bo 3c 0 3 0 nn to cn a y O it cc O O G� O co A:, Q a Q w Q v d U > W d x 3 IML4 4 i U O M ice., rA � � � .� � � � N w .�J• a �u L a ca rA log t y b A � Z b � 3 o°'n ° o°'n oo w ° ° o t >, 0 " '° co ca O p O e� —rA s� cti pp O R rn Q. W U 4, a U v aL con 00 0 0 c� ? O 'a. �• *' O vim¢,' c`�i �, ro i w cn bo y O O 00cc ¢' y O O U foao y oA CA O O ca c� V ¢' oA O U U o P. ° O I Mu a� c y 0 a, .° �•o a� . �a z L m cc u i� V O v 75, rA CA to cn 0 U U _ � O 0 0 �D �D �D A- ::) -o i U U U U U U U rj. U o -ltzzzzzzzzzw 00 U OP O 00 N a 00 -- U 00 00 N w � O U wWq o% bD �� o byCIS I ca W '•••� � aoi W � [i, 'C b�q w co b CO- O o O H p o O p0 as en COL. 0 U U M cl U w o ¢. ° -v c OD c � c c o3 .3a o `� bio o � o 0 0 co M •v -b a b4 0 " ° z C °, U; oaawo � o O drntncntnaUUwoz a u . u L a u w C6 w �n oho tu CA � � tin .d a� � � � o � .� �+• ...�,, c0 o O api ° InE c .a o q5 .. .. 3 y •� C Atl rp bA G 0 �" p O UN "Cf � p U ° •� � Vi �" p ��'I ° ram. ° EA G. cn o °' CA Go 0 O ° O .Y o°'n AR 0 EAO c� pip U 45 N C y b ° rw VJ .0 W � tu En N bn y � bn 47 .� p• U U o, U F. N U > p En N V] C � (� CIS X O O Q w a won w a v u a u c.: .ci 0 CL C M a, N U z 5 -O a coca C ^O y Cza .5 U o0 �' Ok 0 0 on^ 4 U N v� td O a0+ cvC m .0 ^p v tj > a 17 7 0 � O � .o � � � O � � � r- o ^� �. O p Cd UbA ���, c�'o y O ^ y y y to 4-1 .F• �, o b oo a�i r- m 0 ec a�i z _ C� � � on .°3 � � �, 5 i .� � 5 04 y, � �o � a � .°� � •5 oA � � O ❑ O ❑ ❑ ❑ O c N _ _ 0 C O00 Ww � CA ea w CAVJ V ° O .0 9 w o 'C7 t N UCA 0 00 � y Q ' Q 3 d 3 a •� � • • • u t%/ 8 y C b0 '• �+ > q�p T3 - z a) p" w ¢ A y w U IN-Iortality Management Methods (check which method(s) are being implemented) ( Burial three feet beneath the surface of the around within 24 hours after knowledge of the death. The burial must be at least 300 feet from any flowing stream or public body of water. Rendering at a rendering plant licensed under G.S. 106-168.7 Complete incineration ❑ In the case of dead poultry only. placing in a disposal pit of a size and design approved by the Department of Agnculture J Anv method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached) Ce.e mbe.- IS. 1 qoh Version—November 26,2018 Mortality Management Methods Indicate which method(s)will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table.Attach burial location map and plan. Q Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. Rendering at a rendering plant licensed under G.S. 106-168.7 Complete incineration according to 02 NCAC 52C.0102. A composting system approved and permitted by the NC Department of Agriculture&Con- sumer Services Veterinary Division(attach copy of permit). If compost is distributed off-farm, additional requirements must be met and a permit is required from NC DEQ. IDIn the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture&Consumer Services(G.S. 106-549.70). a Any method which, in the professional opinion of the State Veterinarian,would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). (�I/ Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm-specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. Signature f farm Owner/Manager Date Signature of Technical Specialist Date