Loading...
HomeMy WebLinkAboutNCC241326_Site Plan or Location Map_20240507 DowSign Envelope ID:4DCE894E-7B07-44B4-B09D-FC38776E2341 © COPYRIGHT 2024 BY BLUE RIDGE ENGINEERING PLLC,NC LICENSE FP0205,ALL RIGHTS RESERVED.THIS PLAN MAY NOT BE RE-USED, SOLD, LOANED OR GIVEN OTHERS.REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN ROADWAY PLANS FOR S P BLUE RIDGE ENGINEERING PLLC 33 Ga og TOWNHOMES1, o ' AT BROOKSHIRE O PoF s sR''''2' iQ SEAL �Vititi20 i o&ri�pA G -�=�, NP�,• Cnz�D�al Fz „ As, PHASE 3 1/23/2024 a bD C WAUTAGA COUNTY, NORTH CAROLINA =NN Cv W . o ov0g1L„ -o' N2D;c9 a'. EYr.lao o3D° 2 v2_c03u CO m Z m 3 LL 0 .. Brookshire Rd DEVELOPER RCPDB INVESTMENTS,LLC PO BOX 3018 N1Oo G14a Phase 2 J BOONE,NC 28607 ,, ^o 1— W l0 CIVIL ENGINEER z 2ory BLUE RIDGE ENGINEERING PLLC N x W.JESSE HANLIN,PE " m zi Hickory Heights Dr > z 924 MAIN STREET,SUITE 200 , z a o NORTH WILKESBORO,NC 28659 w o 0 -0 m m (336)838-2500 Li a /\ CL CC —\ ® Phase 1 a SURVEYOR SURVEY PROS,PLLC • C.NEIL SHEPHERD,PE,PLS 924 MAIN STREET,SUITE 300 NOTE: NORTH WILKESBORO,NC 28659 PHASE 3 2 THESE PLANS ARE FOR ROADWAY CONSTRUCTION TO SERVE PHASE (336)838-2500 / 3 AT TOWNHOMES AT BROOKSHIRE. TOWNHOME SITES SHOWN m HEREIN ARE PRELIMINARY. FIELD CONDITIONS SHALL BE w PLANNING Yosef Dr EVALUATED FOR EACH TOWNHOME SITE PRIOR TO CONSTRUCTION. Q WATAUGA COUNTY Brookshire Rd BASEMENT/FOUNDATION HEIGHTS MAY GREATLY VARY DUE TO I 126 POPLAR GROVE CONNECTOR,SUITE 201 EXISTING TOPOGRAPHY, AND BUILDING PLANS MAY VARY. SITE w BOONE,NC SPECIFIC GRADING WILL BE REQUIRED FOR EACH TOWNHOME cc (828)265-8043 = N EROSION CONTROL 0 WATAUGA COUNTY NC HWY 194 0 0 842 WEST KING STREET,SUITE A DRAWING INDEX 00 � BOONE,NC 28607 Q N (828)265-8043 Bamboo Rd o z 1— C-1 COVER SHEET w < a N STORMWATER 2 c O NCDEMLR CENTRAL OFFICE US HWY 421 C 2 GENERAL NOTES s O z u C-3 MASTER PLAN v) = x STORMWATER PROGRAM L. Z 1n ao O 1612 MAIL SERVICE CENTER C-4 PHASE 3 PLAN j > p 512 NORTH SALISBURY STREET C-5 EROSION/SEDIMENT CONTROL AND GRADING PLAN �j 0 m z RALEIGH,NC 27699 C-6 EROSION/SEDIMENT CONTROL AND GRADING PLAN SHEET I— C-7 STORM WATER DRAINAGE PLAN N IC-8 STORMWATER DRAINAGE PLAN _ 1 ~ C-9 STORM WATER DRAINAGE PLAN + cc w C-10 EROSION AND SEDIMENT CONTROL DETAILS a