HomeMy WebLinkAboutSWA000199_Fast Track Commencement_20230426 LETTER OF TRANSMITTAL
Al E.
DATE: 04/25/23
TO: Division of Energy, Mineral & Land Resources
CIO Lily Kay
Post-Construction Stormwater Management Program NC Department cf
Winston-Salem Regional Office Environmental Quality
450 West Hanes Mill Road Suite 300 Received
Winston Salem NC 27105 APR 2 6 2023
Winston-SHem
FROM: Alan Crees Gfiiice
RE: Arbor Dormus Treehouse Development
PROJECT No.: ATC Permit SWA000199
WE ARE SENDING YOU:
Copies Date No. Description
1 4.24.23 Fast Track Construction Commencement Form
TRANSMITTED:
FOR YOUR USE/FILE FOR APPROVAL AS YOU REQUESTED
FOR REVIEW/COMMENT FOR SIGNATURE AS REQUESTED BY:
XFOR YOUR INFORMATION FOR
REMARKS:
VIA: MAIL FAX HAND DELIVERED PICK UP
COPY:
Transmitted from the Boone, NC Office of
Municipal Engineering Inc.
820-B State Farm Road - Boone, North Carolina 28607
Phone (828)262-1767—Fax (828) 265-2601 - E-mail (general): mesco@boone.net
Post-Construction Stormwater Management
ATC Permit No. SWA000199
Attachment A
Fast Track Construction Commencement Form
ATC Permit No. SWA000199
Arbor Domus Treehouse Development
Watauga County
Complete and submit this form (NO SUBSTITUTES) to the Winston-Salem Regional Office
The undersigned hereby notifies the agency below that the construction of this project is expected to
commence on - Z.3 (mm/dd/yyyy) and is expected to be completed by
- 30 -2-7(mm/dd/yyyy). I understand that this proiect shall not be considered complete until
the Division has received the final Fast-Track Stormwater Permit Application Form and all
required supporting documentation.
706'1424E 1 C-.E'�.
cc/.t/g2�/7.74,vA cat G G C 7 Z 54-20?_5
/gnature of d. Holder Title (if any) Date
Designer's Certification
I, rt `O A .- , C.fiZA25 , as a duly re is red Licensed Professional in the State of
No h Carolina, having been authorized to observe ( periodically, ❑ weekly, ❑full time) the
construction of the subject project on behalf of the Permittee. I hereby state that, to the best of my
abilities, due care and diligence will be used such that the project and all stormwater control measures
(SCMs) shall be constructed to meet all applicable requirements of 15A NCAC 02H Section .1000-
.1062, including the Minimum Design Criteria (MDC).
�\\\i i 1111/,
North Carolina Licensed Professional Seal, signature, ,\`�N CA '•.�
Ro,�/if
•
and date: 1
�O` ESS/Q p 9�'�
•
:a SEAL �r
27044 _
•
;��/ .;•:NGIt �c�\\;•
iff4 `� y
NP
It is highly recommended that this notification be sent in a manner that provides proof of receipt by the
Division. The Division does not acknowledge receipt of Fast Track Construction Commencement Notification
Forms.
Submit this form to the following Office:
Division of Energy, Mineral and Land Resources c/o Lily Kay
Post-Construction Stormwater Management Program
Winston-Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston-Salem, NC 27105
Page 1 of 1