Loading...
HomeMy WebLinkAboutSWA000199_Fast Track Commencement_20230426 LETTER OF TRANSMITTAL Al E. DATE: 04/25/23 TO: Division of Energy, Mineral & Land Resources CIO Lily Kay Post-Construction Stormwater Management Program NC Department cf Winston-Salem Regional Office Environmental Quality 450 West Hanes Mill Road Suite 300 Received Winston Salem NC 27105 APR 2 6 2023 Winston-SHem FROM: Alan Crees Gfiiice RE: Arbor Dormus Treehouse Development PROJECT No.: ATC Permit SWA000199 WE ARE SENDING YOU: Copies Date No. Description 1 4.24.23 Fast Track Construction Commencement Form TRANSMITTED: FOR YOUR USE/FILE FOR APPROVAL AS YOU REQUESTED FOR REVIEW/COMMENT FOR SIGNATURE AS REQUESTED BY: XFOR YOUR INFORMATION FOR REMARKS: VIA: MAIL FAX HAND DELIVERED PICK UP COPY: Transmitted from the Boone, NC Office of Municipal Engineering Inc. 820-B State Farm Road - Boone, North Carolina 28607 Phone (828)262-1767—Fax (828) 265-2601 - E-mail (general): mesco@boone.net Post-Construction Stormwater Management ATC Permit No. SWA000199 Attachment A Fast Track Construction Commencement Form ATC Permit No. SWA000199 Arbor Domus Treehouse Development Watauga County Complete and submit this form (NO SUBSTITUTES) to the Winston-Salem Regional Office The undersigned hereby notifies the agency below that the construction of this project is expected to commence on - Z.3 (mm/dd/yyyy) and is expected to be completed by - 30 -2-7(mm/dd/yyyy). I understand that this proiect shall not be considered complete until the Division has received the final Fast-Track Stormwater Permit Application Form and all required supporting documentation. 706'1424E 1 C-.E'�. cc/.t/g2�/7.74,vA cat G G C 7 Z 54-20?_5 /gnature of d. Holder Title (if any) Date Designer's Certification I, rt `O A .- , C.fiZA25 , as a duly re is red Licensed Professional in the State of No h Carolina, having been authorized to observe ( periodically, ❑ weekly, ❑full time) the construction of the subject project on behalf of the Permittee. I hereby state that, to the best of my abilities, due care and diligence will be used such that the project and all stormwater control measures (SCMs) shall be constructed to meet all applicable requirements of 15A NCAC 02H Section .1000- .1062, including the Minimum Design Criteria (MDC). �\\\i i 1111/, North Carolina Licensed Professional Seal, signature, ,\`�N CA '•.� Ro,�/if • and date: 1 �O` ESS/Q p 9�'� • :a SEAL �r 27044 _ • ;��/ .;•:NGIt �c�\\;• iff4 `� y NP It is highly recommended that this notification be sent in a manner that provides proof of receipt by the Division. The Division does not acknowledge receipt of Fast Track Construction Commencement Notification Forms. Submit this form to the following Office: Division of Energy, Mineral and Land Resources c/o Lily Kay Post-Construction Stormwater Management Program Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Page 1 of 1