HomeMy WebLinkAbout20160070 Ver 1_Bridge 990016 Yancey Plans_20160120WETLAND PERMIT IMPACT SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (tt) (ft) (ft)
1 12+16 to 13+79 Culvert 0.01 76
1 12+09 to 12+77 LT Bank Stabilization < 0.01 < 0.01 46 11
1 13+13 to 13+95 RT Bank Stabilization < 0.01 < 0.01 51 20
1 14+27 to 14+48 RT Bank Stabilization < 0.01 < 0.01 8 10
TOTALS`: 0.02 0.01 181 41 0
'Rounded totals are sum of actual impacts
NOTES:
�
11 ����� J1 � �� � � ���
1V fi11�'ll�� �1�' � wi����lli����
1C'I'llll4`L1La1� Ay�o 1�'17\1�'A1L`esJ 1711Ld1Ll�ll0lLeil�JL's�
Il J�1H[N G. ��]E][iS'1CIN .�NN Il➢.�`VI� 14 C� .�]LIl,�N F8ll9., �BqJff$1�7�VIIlL1L�, N4� 28ill4
� ���El�]H[iNE Ca��l�� % 9 1H.�NE� CI81ElEI� RllD., �U1f8IV�VIIl,ILIB, N1' 28iIl4
1f�rA"ll"llidCd.� .�. Ng.�&$S1E�P�d,Il,
3 ,V.Q�kE� �. JVB. � 5AI8eA ]E. C��fft.ANIE Il1�iIl N(' Il9i, 1BUI8N�VIll.Il,�,NC 2Ri14
� W.�L°JCE� ��.�1[dl��R.� RdC]H'Il'�I8 �� �EM[�,EFB 1L���, �AV.�NN,��I, G� 3Il410
r
O
0
d
�
N
Z
�
�
0
z
w
Z
U
a
0
Q
0
a
�
�
Z
Q
z
0
0
+
0
H
N
z
0
�
� o
Z Z
0 -
ti �
w W
� 3
O
�
a
�
� WETLAND AND SURFACE WATER IMPACTS PERMIT
�
�5��/,� DENOTES IMPACTS IN
,;� / SURFACE WATER
PERMANENT 5�
wATER IMPACTS
PARCEL PROPERTY
# OWNER'$
NAME
1 JOHN G. & KERSTIN ANN DAVIS
2 PATRICIA A. MARSHALL
3 JAMES C. 1R. & SARA E. COCHRANE
4 WALTER & BARBERA RICHTER
"' Z
z =� Z o
O V �' O Q
� w
� � <
� �tiZ �
Z � � p p Z
�E TB 2GI E \
�i�/' T T T -r
T ---- PERMANENT
�� � `� SURFACE
� WATER
IMPACTS
F�� �
STREAM IMPACTS
Length Area Type
Permanen} 76 ff. 517 sf Install New CuHert and
Rip Rap at Inlet and Outlet
Work Area to
Temporary 0 fr. 0 sf Install New CuHert and
Ri Ra af Inlet and Outlet
Permanent 705 fr. 547 sf Bank Sfa6ilization
Temporary 41 h. 498 sf Work Area to Instoll
Bank Sta6ilizafion
N 38° 39' 12.3" E
-�- r� �iu. iur_
SCALE
P - 50' BEGIN PROJECT
-L- POT Sta. b
RIGHT-OF-WAY AREAS
TOTAL AREA %+REA AREA CONSTRUCTION PERMANENT TEMPORARY
REMAINING REMAINING DRAINAGE DRAINAGE
AREA TAKEN RIGHT LEFT EASEMENT EASEMENT EASEMENT
WA 0.001 Ac. WA WA 0.017 Ac 0 Ac. 0 Ac.
WA 0.012 Ac. WA WA 0.021 Ac. 0 Ac. 0 Ac.
WA 0.014 Ac. WA WA 0.097 Ac 0.017 Ac 0 Ac.
rii
�� GRAU 350
T�_Z
N 48' 03' 16.5" E�
o i�s-
� /NC. --15- —
c / C � \E_�
0
� 1S-
7 _ !
��
25'TAPER
ro Exisr.
SPECIAL CUT DITCH
SEE DETAIL A
-L- PT S1o. 11+64.04
SPECIAL NT DITCH
20 TON Cl 8 RIP RAP
W/64 SY GEOTEXTILE
SEE DETAIL B
�v�
WA 0.002 Ac. WA WA 0.012 Ac. 0.007 Ac. 0 Ac.
. . .. ... '.. T ... �-- -r-
o. ......�:�.�.....�...�.... ...
� ;�
Z �°`g o a �r � d a
°- � " " _ � � z z BM'l EL. = 3/13.88'
W y DRPEN'FT tE � j j � � � � o Q . . N 772924 E l0/3l10 ��.
'� o 0 0 0 0' m o o -L- STAJ2+4/76 (22.66' LTJ
� z= Z Z Z Z Z" RR SPIKE lN BASE OF l2" DOUBLE 8/RCH
? o0 0 0 0 0 0 �� � m i
� � --
a "
� -L- 72+50.0 23' RT 0404 36 �
U �
H
�
o n 3,140 — — --- —
� �J . _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ ___ _ _ _
� n�
Z 3
° � 3,130 �
� �
�
i_. �. . �. . �. �. �..i . �. �. �. �. �. �. �. �.
'-L- J/H,IVTVV.I
ELEV. = 3,129.19'
For insiallation of new mlveA.
For mnstruction a cess to install �
n culvert_
in tollotion Wf riprop oi the culvert
a�d o ,ief �tia„�ei „a„s�,�o�� as weu
e ouiler i e followin insiallation.
, For <onsiruction f outlet pipe ✓
and 6ank sta6ilization.
��ti��1
��SQ'
BEGM SBG
57A.12+90.00
-L- PT St
S N
� 0401
E -��^;
D �N �.• �.. S E TB 2GI
�I 17.5'
/NC.
LATERAL 'V' DI
S�TC7A"CCB'ftITRP.P
W/42 SY GEOTEXTILE
SEE OETAIL C
-L- PC Sto.13+59.57
37 O
48.2" E ENo sec
�57A 14+40.00
040 o GRAU 350
\ v?I /7,$, ` TL-2
E—
- PT
-L- POT Sta. /5+52.64
15" PIPE OUTLEf DATA
DRAINAGE AREA 0.61 ac
Q1O O.2 C{5
V10 6.3 Ws
PERMANENT i
SURFACE^WAfTR i � .
TO raOF
f.ljs R �
q,,
- O SCALE
o ��F 1"-50'
� � � �O h
, �, N
9,9-
�s S - SSS"cr
�RIP RAP AT
EMBANKMENT
SEE DETAIL D
Sto. 14+99
O
END PROJECT
-L- POT Sto. l.
BRIDGE HYDRAULIC DATA
STR '9900/6 Sta.l2+9/.78 -L-
DESIGN FREOUENCY = 2 YRS
DESIGN DISCHARGE = 220 CFS
DESIGN HW ELEVATION = 3,l13.9 FT
l00 YEAR FREQUENCY = l00 YRS
l00 YEAR DISCHARGE _ l.100 CFS
l00 YEAR HW ELEVATION = 3.l17.35 FT
�.
OVERTOPPING FREQUENCY= 2+ YRS
OVERTOPPING DISCHARGE = 295 CFS
OVERTOPPING ELEVATION = 3.l14.3 FT
- NORMAL WATER SURFACE ELEV = 3.l1/.9 FT
DATE OF HYDRAULIC SURVEY = l0/20/3
Pl = 11+00.00 �
EL = 3./25.96' --- - —
V� _ 12�, - - --
. K - 52 r r : � : : : � _: I
V = 42 mph
\ \ � ( 1S300o�
_ PI = 12f90.00
� � EL = 3.///.52'
° ,- 3,120 -. i,;63382/ � ��6000� Kc= 7050
� � ' � V = 42 mph
'° BE6/N SP. CUT DITCH RT. ��� �,
� iN�Er cHaNNE� rr✓rs� our�er cHaNNE� rNrs� -L- STA.10+39 �3�'��
� SFC7/ON A-A OOOKING UOWNS7RFAMJ SFC710N B-R (IOOKING DOWN57RFAMl � E/ _,3,/`Z7.,�jQ � g�6� '�
- 3,11 0 rora� cHaNNe� excavarloN Esr.as cr rora� cHaNNE� excavarloN Esr.so cr - � a
-�- srais+2s.�
ELEV. = 3,102/4'
PROJECT REFERENCE NO. I SHEET NO.
ILW SHEET NO.
ROADWAY DESIGN HYDRAULICS
�i N NE[�
PERMIT RA WI1VG
SHEET 3 OF 4
GRAPHIC SCALES
50 0 50 100
�
PLANS
50 0 50 100
PROFILE (HORIZONTAL)
�� — 0 �0 20
PROFILE (VERTICAL)
YANCEY #16
DESIGN SPEED = 40 mph
ADT = 290 (2010)
ADT = 580 (2025)
O
NOTES:
1. ELK FORK IS IN THE FRENCH BROAD RNER
BASIN, WHICH HAS NO BUFFER ZONES AT THIS LOCATION.
2. CLEARING AND GRUBBING ON THIS PROJECT SHALL BE
PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II
WITH CLEARING EXTENDING 5' BEYOND THE TOE OF SLOPE
WITH NO GRUBBING.
3. PROPOSED CULVERT TO BE BUILT USING STAGE�-
CONSTRUCTION.
EXISTING BRIDGE DIMENSIONS - 2@9'-0", 55 �EG. SKEW;
TIMBER FLOOR ON TIMBER POSTS/ABUTMENTS
PROPOSED CUWERT DIMENSIONS - 2@8'X4' RCBC,
36 DEG. SKEW', W/ HEADWALL (BURIED 1.5')
BOX CULVERT DETAIL
�NOT TO 5<ALE�
�No,es: I'-a'-'i I'-a'-'i
1) NATIVE MATERIAL BEfWEEN SILLSBAFFLES �
IN THE CULVERT SHALL PROVIDE A CONTINUOUS
LOW fLOW CHANNEL NATIVE MATERIAI
CONSISTS OF MATERIAL THAT IS EXCAVATED
FROM THE STREAM BED AT THE PROJECT SITE
DURING CONSTRUCTION NATIVE MATERIAL
IS SUBIECT TO APPROVAI BY THE ENGINEER
AND MAY 8E SUBJECT TO PERMIT CONDITIONS. 4
2) SILIS ARE TO BE 1 0 FT. WIDE, GAST
SEPARATELY AND ATfACHED BY DOWELS.
1.5' 1.5'
3) TOP OF SILLS SHOULD MATCH STREAM
3,140
3,130
BED ELEVATION IN LOW FLOW CHANNEL
OF STREAM. (THALWEG) � .� Z O
PI = 192f90Z.00 '
� EL = J.�O✓.'I�I� 4) NUMBER OF $ILL$ DETERMINEO BY THE SILL$ AT
ENGINEER. INLET AND OUTLET
VC=70'
K = 2l5
V = 76 mph ��,a\ q $,11�
F 31 iONS CL77 RIP RAP 37 70NS CL.II RIP RAP ��l �/, �_ _,g/�e �� -�- e�re�
G 33 SY GEOTEXTILE FABRIC 39 SY GEOTEXTILE FABRIC ADJUST SLOPES TO ���� � ���� *�O . �'. �1 �4p400% � �
i � NA7URAL GROUND NA7URAL 6ROUND TIE PROPOSED � � � �� � `� -'-----
J 1� BANKS TO TOP OF ._ . . . . : �_; � � � � � f. � . n � �. _ '. i = � ' �.. - 1 �.
EXIS7ING BANKS � � II *��r �-I-37/43 '""""" ' - �- �� � 3 100
3��00 PROP.GRADE AT CHANNEL _ _ / '"^�"E� �
� � � � IMPROVEMENT . � W • ��
� ADJUST SLOPES TO � � WING WALL ,i T ZE M. . _,- ° `"' � ' '" " --_ _
w riE PROPosEo � `�`e � END SP.CUT DITCH RT. -r-=ra - f � ie_rq --_
e<wKs ro roP oF BEGIN LATERAL 'V' DITCH RT — �� 9 S���S J � —_
EXISTING BANKS \' CLASS // � �r � � � �r T � � � � ��r �
CLASS lI EXCAVATION ' �� � �� NUMBER OF SILLS-8 PER BARREL
�� 3,090 Ar cNaNNe� �H� RiP RaP RiP Raa rrrPr -L- STA.12+75 END LATERAL 'V' DITCH RT. Eo�A��Y SPA�Eo iAPPROX, 9,0 �. �EN,ERs� 3 090
= rMPRa✓EMEmr varvEs wi cEorExri�e wi cEorExri�E �-�� E/ = 3,///.20 (2J-8'X4' RCBC �
;;,�o � TZE IN. ll"-l7" FABRIC l7YPJ FABRIC l7YPJ VARIES � -�- STAl3f3�
a L �2,_��, El = 3,10475 Pu,N wew
�r'>
10+00 11 +00 12+00 13+00 14+00 15+00 16+00
r
0
0
d
�
N
Z
O
�
LL
Z
w
z
3
z
a
0
Q
0
a
7
�
Z
Q
0
0
+
0
�
N
z
0
�
� o
Z Z
0 -
ti �
w W
� 3
O
�
a
�
� WETLAND AND SURFACE WATER IMPACTS PERMIT
�
� . �5��/,� DENOTES IMPACTS IN
,;� / SURFACE WATER
�-- \
.. �� 315e -- --
`_� — __
.._,``` = _ _ �
\ `_ ._� ---__-- �
. ` �_` _ =3140�—___
� .—
--
- --
�� �
� . ____ _
PERMANENT 5�
wATER IMPACTS
PARCEL PROPERTY
# OWNER'$
NAME
1 JOHN G. & KERSTIN ANN DAVIS
2 PATRICIA A. MARSHALL
3 JAMES C. 1R. & SARA E. COCHRANE
4 WALTER & BARBERA RICHTER
"' Z
z =� Z o
O V �' O Q
� w
� � <
� �tiZ �
Z � � p p Z
�E TB 2GI E \
�,�'� T -r T-- �----
-- PERMANENT
��-\ \ SURFACE
WATER
IMPACTS
STREAM IMPACTS
Length Area Type
Permanen} 76 ff. 517 sf Install New CuHert and
Rip Rap at Inlet and Outlet
Work Area to
Temporary 0 fr. 0 sf Install New CuHert and
Ri Ra af Inlet and Outlet
Permanent 705 fr. 547 sf Bank Sfa61 zation
Temporary 41 h. 498 sf Work Area to Instoll
Bank Sta61 zahon
N 38° 39' 12.3" E
-�- r� �iu. iur_
SCALE
P - 50' BEGIN PROJECT
-L- POT Sta. b
RIGHT-OF-WAY AREAS
TOTAL AREA %+REA AREA CONSTRUCTION PERMANENT TEMPORARY
REMAINING REMAINING DRAINAGE DRAINAGE
AREA TAKEN RIGHT LEFT EASEMENT EASEMENT EASEMENT
WA 0.001 Ac. WA WA 0.017 Ac 0 Ac. 0 Ac.
WA 0.012 Ac. WA WA 0.021 Ac. 0 Ac. 0 Ac.
WA 0.014 Ac. WA WA 0.097 Ac 0.017 Ac 0 Ac.
r�
�� GRAU 350-
T�_2
N 48' 03' 16.5' E�
o ns�
o /NC. - -15 -
o ;
� JS -
� - E—E�
` � � `� �
_,
?s ra�ER
ro Exisr.
SPECIAL CUT DITCH
SEE DETAIL A
-L- PT S1o. 11+64.04
SPECIAL NT DITCH
20 TON Cl 8 RIP RAP
W/64 SY GEOTEXTILE
SEE DETAIL B
�v�
WA 0.002 Ac. WA WA 0.012 Ac. 0.007 Ac. 0 Ac.
. . .. ... '.. T ... �-- -r-
o. ......�:�.�.....�...�.... ...
� ;�
Z �°`g o a �r � d a
°- � " " _ � � z z BM'l EL. = 3/13.88'
W y DRPEN'FT tE � j j � � � � o Q . . N 772924 E l0/3l10 ��.
'� o 0 0 0 0' m o o -L- STAJ2+4/76 (22.66' LTJ
� z= Z Z Z Z Z" RR SPIKE lN BASE OF l2" DOUBLE 8/RCH
? o0 0 0 0 0 0 �� � m i
a -
�� -L- 72+50.0 23' RT 0404 36 �
U
H �
9
o � 3,140 — -- _
(o� 0 . _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ ___ _ _
?
� 3
Z
° � 3,130 �
� �
�
i_. �. . �. . �. �. �..i . �. �. �. �. �. �. �. �.
'-L- J/H,IVTVV.I
ELEV. = 3,129.19'
�S
For insiallation of new mlveA.
For mnstruction a cess to install �
n culvert_
nstallotion of riprop oi the culvert
and o tlet channel trans t ons as well
e ouiler e follown �nsiallaton
, For <onsiruct on f outlet p pe ✓
and 6ank sta6 I zat on
��ti��1
��SQ'
BEGM SBG
57A.12+90.00
-L- PT St
N
0401
E ta zci
�I 17.5'
/NC.
LATERAL 'V' DI
S�TC7A"CCB'ftITRP.P
W/42 SY GEOTEXTILE
SEE OETAIL C
-L- PC Sto.13+59.57
37 O
48.2" E ENo sec
�ST A.14+40.00
040 O GRAU 350
\ `n' /7,$, ` TL-2
-L- POT Sta. /5+52.64
15" PIPE OUTLEf DATA
DRAINAGE AREA 0.61 ac
Q1O O.2 C{5
V10 6.3 Ws
PERMANENT ,
�UFFncE wATER .
E �� ���
-- TB 2G F T� AP�-R
&y c`�"Yi,s?
�� /
� � O SCALE
�- ,-,_��, � � g � F 1„ - 50'
, ,
�- j�._ ����o o ti N
,
�S ... 040_ _ � � ,g.9'Cc
�I 15 S . J`��'�
_./ �
- PT
�RIP RAP AT
EMBANKMENT
SEE DETAIL D
Sto. 14+99
O
END PROJECT
-L- POT Sto. l.
BRIDGE HYDRAULIC DATA
STR '9900/6 Sta.l2+9/.78 -L-
DESIGN FREOUENCY = 2 YRS
DESIGN DISCHARGE = 220 CFS
DESIGN HW ELEVATION = 3,l13.9 FT
l00 YEAR FREQUENCY = l00 YRS
l00 YEAR DISCHARGE _ l.100 CFS
l00 YEAR HW ELEVATION = 3.l17.35 FT
�.
OVERTOPPING FREQUENCY= 2+ YRS
OVERTOPPING DISCHARGE = 295 CFS
OVERTOPPING ELEVATION = 3.l14.3 FT
- NORMAL WATER SURFACE ELEV = 3.l1/.9 FT
DATE OF HYDRAULIC SURVEY = l0/20/3
Pl = 11+00.00 �
E/L� = 3./25.96' --- - —
� Vl. — �2� .� � __ _ _ __
. K - 52 r r : � : : : � _: I
V = 42 mph
\ \ � ( 1S300o� _
_ PI = 12f90.00
� � EL = 3.///.52'
° ,- 3,120 -. i,;63382/ � ��6000� Kc= 7050
� � ' � V = 42 mph
'° BE6/N SP. CUT DITCH RT. ��� �,
� iN�Er cHaNNE� rr✓rs� our�er cHaNNE� rNrs� -L- STA.10+39 �3�'��
� SFC7/ON A-A OOOKING UOWNS7RFAMJ SFC710N B-R (IOOKING DOWN57RFAMl � E/ _,3,/`Z7.,�jQ � g�6� '�
- 3,11 0 rora� cHaNNe� excavarloN Esr.as cr rora� cHaNNE� excavarloN Esr.so cr - � a
-�- srais+2s.�
ELEV. = 3,102/4'
PROJECT REFERENCE NO. I SHEET NO.
ILW SHEET NO.
ROADWAY DESIGN HYDRAULICS
�i N NE[�
PERMIT RA WI1VG
SHEET 4 OF 4
GRAPHIC SCALES
50 0 50 100
�
PLANS
50 0 50 100
PROFILE (HORIZONTAL)
�� 0 �0 20
PROFILE (VERTICAL)
YANCEY #16
DESIGN SPEED = 40 mph
ADT = 290 (2010)
ADT = 580 (2025)
O
NOTES:
1. ELK FORK IS IN THE FRENCH BROAD RNER
BASIN, WHICH HAS NO BUFFER ZONES AT THIS LOCATION.
2. CLEARING AND GRUBBING ON THIS PROJECT SHALL BE
PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II
WITH CLEARING EXTENDING 5' BEYOND THE TOE OF SLOPE
WITH NO GRUBBING.
3. PROPOSED CULVERT TO BE BUILT USING STAGE�-
CONSTRUCTION.
EXISTING BRIDGE DIMENSIONS - 2@9'-0", 55 �EG. SKEW;
TIMBER FLOOR ON TIMBER POSTS/ABUTMENTS
PROPOSED CUWERT DIMENSIONS - 2@8'X4' RCBC,
36 DEG. SKEW', W/ HEADWALL (BURIED 1.5')
BOX CULVERT DETAIL
�NOT TO 5<ALE�
*NOTES: r—a —�' r—a —�'I
1) NATIVE MATERIAL BEfWEEN SILLSBAFFLES �
IN THE CULVERT SHALL PROVIDE A CONTINUOUS
LOW fLOW CHANNEL NATIVE MATERIAI
CONSISTS OF MATERIAL THAT IS EXCAVATED
FROM THE STREAM BED AT THE PROJECT SITE
DURING CONSTRUCTION NATIVE MATERIAL
IS SUBIECT TO APPROVAI BY THE ENGINEER
AND MAY 8E SUBJECT TO PERMIT CONDITIONS. 4
2) SILIS ARE TO BE 1 0 FT. WIDE, GAST
SEPARATELY AND ATfACHED BY DOWELS.
1.5' 1.5'
3) TOP OF SILLS SHOULD MATCH STREAM
3,140
3,130
BED ELEVATION IN LOW FLOW CHANNEL
OF STREAM. (THALWEG) � .� Z O
PI = 192f90Z.00 '
� EL = J.�O✓.'I�I� 4) NUMBER OF $ILL$ DETERMINEO BY THE SILL$ AT
ENGINEER. INLET AND OUTLET
VC=70'
K = 2l5
V = 76 mph ��,a\ q $,11�
F 31 iONS CL77 RIP RAP 37 70NS CL.II RIP RAP ��l �/, �_ _,g/�e �� -�- e�re�
G 33 SY GEOTEXTILE FABRIC 39 SY GEOTEXTILE FABRIC ADJUST SLOPES TO ���� � ���� *�O . �'. �1 �4p400% � �
i � NA7URAL GROUND NA7URAL 6ROUND TIE PROPOSED � � � �� � `� -'-----
J 1� BANKS TO TOP OF ._ . . . . : �_; � � � � � f. � . n � �. _ '. i = � ' �.. - 1 �.
EXIS7ING BANKS � � II *��r �-I-37/43 '""""" ' - �- �� � 3 100
3��00 PROP.GRADE AT CHANNEL _ _ / '"^�"E� �
� � � � IMPROVEMENT . � W • ��
� ADJUST SLOPES TO � � WING WALL ,i T ZE M. . _,- ° `"' � ' '" " --_ _
w riE PROPosEo � `�`e � END SP.CUT DITCH RT. -r-=ra - f � ie_rq --_
e<wKs ro roP oF BEGIN LATERAL 'V' DITCH RT — �� 9 S���S J � —_
EXISTING BANKS \' CLASS // � �r � � � �r T � � � � ��r �
CLASS lI EXCAVATION ' �� � �� NUMBER OF SILLS-8 PER BARREL
�� 3,090 Ar cNaNNe� �H� RiP RaP RiP Raa rrrPr -L- STA.12+75 END LATERAL 'V' DITCH RT. Eo�A��Y SPA�Eo iAPPROX, 9,0 �. �EN,ERs� 3 090
= rMPRa✓EMEmr varvEs wi cEorExri�e wi cEorExri�E �-�� E/ = 3,///.20 (2J-8'X4' RCBC �
;;,�o � TZE IN. ll"-l7" FABRIC l7YPJ FABRIC l7YPJ VARIES � -�- STAl3f3�
a L �2,_��, El = 3,10475 Pu,N wew
�r'>
10+00 11 +00 12+00 13+00 14+00 15+00 16+00