Loading...
HomeMy WebLinkAboutNCC232807_MODIFICATION Supporting Doc (LEG RESP CHANGE)_20240503 NCGO1 Legally Responsible Individual Change Form Use this form when: The person who is legally responsible for the permit has changed, but there is NO CHANGE in the project name or ownership. **If the project name has changed, or if the ownership of the project has changed,do NOT use this form.** Instead,you must submit a new NCGO1 electronic Notice of Intent(eNOI). Directions: Print this form,complete,scan and upload to the Construction Stormwater Permit MODIFICATION Form. Then, mail the original form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N.Salisbury Street, 6`h Floor(Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR MODIFICATION HAS BEEN REVIEWED AND ACCEPTED AS COMPLETE. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] Certificate of Coverage (COC) Number: NCC232807 Name of Project: Marshall Phase 3 Industrial Landfill (Phases 1-3) Legally Responsible Organizational Entity: Duke Energy Carolinas LLC PREVIOUS Legally Responsible Individual: David Dellario NEW Legally Responsible Individual: Issa J. Zarzar The following section is to be completed and signed by the NEW Legally Responsible Individual. Per NC General Statute 143-215.68(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Page 1 of 2 NCGO1 Legally Responsible Individual Change Form THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] Under penalty of law, I certify that(check all boxes to indicate your agreement): • I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. O I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. O If the approved Erosion and Sediment Control Plan is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. 2 I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I] This form has been reviewed and is accurate and complete to the best of my knowledge. *Signature: w-��"'"� Date: '/ii/z u Zy Print Name of Signed: Issa J. Zarzar Title:GM CCP Project Management Mailing Address: 410 S. Wilmington St. Raleigh, NC 27601 Street Address: 410 S. Wilmington St. Raleigh, NC 27601 Email Address: Issa.Zarzar@duke-energy.com Phone Number: 919 812-0446 * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of the NCG010000 permit. Page 2 of 2