HomeMy WebLinkAbout20240626 Ver 1_ePCN Application_20240430DW R
DHlsloo of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned Version# *
20240626 1
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Select Project Reviewer*
Chad Turlington:chad.turlington
Information for Initial Review
1a. Name of project:
Pinehurst Lake Bulkhead
la. Who is the Primary Contact?*
Brandon Dabbs
1b. Primary Contact Email:*
brandon@dabbsbrothers.com
Date Submitted
4/30/2024
Nearest Body of Water
Pinehurst Lake
Basin
Lumber
Water Classification
WS-II;HQW
Site Coordinates
Latitude:
35.170453
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Moore
Is this a NCDMS Project
Yes No
Longitude:
-79.494208
Reviewing Office*
Fayetteville Regional Office - (910) 433-3300
1c. Primary Contact Phone:*
(803)917-7822
Is this project a public transportation project?*
Yes No
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
Please provide the date of the previous submission.'
4/24/2024
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Are you a federal applicant?*
Yes No
If yes, please provide a statement concerning compliance with the Coastal Zone Management Act."
We are not located in a coastal zone
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
TRAD,JOSEPHJEROME
2b. Deed book and page no.:
5596 / 524
2c. Contact Person:
401 Water Quality Certification - Express
Riparian Buffer Authorization
Yes No
Yes No
2d. Address
Street Address
11 Lakeside Ct.
Address Line 2
City
Pinehurst
Postal / Zip Code
28374
2e. Telephone Number:
(314)614-7691
2g. Email Address:*
info@dabbsbrothers.com
3. Applicant Information (if different from owner)
3a. Name:
Brandon Dabbs
3b. Business Name:
Dabbs Brothers LLC
3c.Address
Street Address
PO Box 2032
Address Line 2
city
Wilmington
Postal / Zip Code
28402
3d. Telephone Number:
(803)917-7822
3f. Email Address:*
brandon@dabbsbrothers.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Pinehurst
2. Project Identification
2a. Property Identification Number:
855109273300
2c. Project Address
Street Address
11 Lakeside Ct.
Address Line 2
City
Pinehurst
Postal / Zip Code
28374
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Pinehurst Lake
3b. Water Resources Classification of nearest receiving water:
WS-II;HQW
3c. What river basins) is your project located it *
Lumber
State / Province / Region
NC
Country
USA
2f. Fax Number:
State / Province / Region
NC
Country
USA
3e. Fax Number:
2b. Property size:
.524
State / Province / Region
NC
Country
USA
3d. Please provide the 12-digit HUC in which the project is located.
03040203
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
New home construction underway. We propose to build a bulkhead on the lakefront. The adjacent properties already have existing bulkheads which are causing some erosion to occur on
the subject property.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4b(2). Is Any Portion of the Work Already Complete?
Yes No
If yes, describe the completed work
4c. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. not related to the 404 or 401.
4f. List the total estimated acreage of all existing wetlands on the property:
0.014 (If any. Awaiting USACE verification)
4g. List the total estimated linear feet of all existing streams on the property:
0
4h. Explain the purpose of the proposed project:*
To construct a bulkhead on the waterfront to mitigate erosion from surrounding properties.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
Construct a timber bulkhead to match existing bulkheads on neighboring properties
4k. Will this activity involve dredging in wetlands or waters?*
Yes No
If yes, Describe the type of dredging, the composition of the dredged material and the location of disposal area.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No Unknown
Comments:
Awaiting verification from USACE
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
7. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list)
9 Lakeside Ct. Pinehurst, NC 28374
13 Lakeside Ct. Pinehurst, NC 28374
8. Scheduling of Activity:
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries O Buffers
Open Waters Pond Construction
2h.Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards:
Fill dirt to be placed behind bulkhead. No materials will be discharged into water
3i. Total cubic yard stream impacts:*
3
4. Open Water Impacts
4a. Site #
4a1. Impact Reason
4b. Impact type
4c. Name of waterbody
4d. Activity type :11".
Waterbody type
4f. Impact area
survey
erosion
P
Pinehurst Lake
Bulkheads
-11
Lake
0.01
4g. Total temporary open water Impacts: 4g. Total permanent open water impacts:
0.00 0.01
4g. Total open water impacts:
0.01
4g. Total cubic yard open water impacts:
0
4h. Comments:
Minimal intrusion from bulkhead to open water
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Minimal encroachment into open water areas.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
All fill material to be brought in after construction of the bulkhead with appropriate ground cover applied. Erosion control measures to be in place during
construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Does not meet threshold of 0.1 acres
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
Not in affected area
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
Comments:
1 home per .5 acre
G. Supplementary Information
1. Environmental Documentation
O
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
All surrounding areas are developed
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
Unknown
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Private environmental report
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
NCDEQ
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Online search
8. Flood Zone Designation (Corps Requirement)
Be. Will this project occur in a FEMA-designated 100-year floodplain?
Yes No
8b. If yes, explain how project meets FEMA requirements:
Constructed to meet height standards currently in place
8c. What source(s) did you use to make the floodplain determination?"
Survey
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Moore County GIS.pdf 119.06KB
Siteplan.pdf 311.03KB
File must be PDF or KMZ
Comments
Minimal area located in open water
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Brandon Dabbs
Signature
Ot"&Ar OkAera
Date
4/30/2024
O