Loading...
HomeMy WebLinkAbout100005_Application_20240227ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Robert G Ward Robert Ward Farm 6615 Robert G Ward Dr Winnabow, NC 28479-5664 NORTH CAROLINA Environmental Quality February 12, 2024 Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: RECEIVED FEB 2 6 20?4 NC DEQ/ ° ; , Pi Central Office Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits, which expire on September 30, 2024. In order to ensure your continued covers a under the State Non -Discharge General Permitsyou must submit an application for Rermit coverage to the Division of Water Resources DWR bV A riI 3.2024. Enclosed you will find a "Request for Certificate of Coverage for Facility Currently Covered by an Expiring State Non -Discharge General Permit." The armlication form must be completed. si ned b • the Permittee. and returned to the DWR b Aipril 3, 2024. Mailing Address: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699 1636 Email: animal.operations6@,deg.nc.gov phone: (919) 707 9129 Please note that you must include one (1)_cony of the Certified Animal Waste Manaimment Plan (CAWMP) with the com leted and signed application form. A list of items included in the CAWMP can be found on aee 2 of the renewal application form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NC G.S. § 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. Copies of the animal waste operation State Non -Discharge General Permits are available at www.deg.nc.gov/animalpermits2024. General permits can be requested by writing to the address above. If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9129. Sincerely, Michael Pjetraj, Deputy Director Division of Water Resources Enclosures: Request for Certificate of Covers e for Facilit\ Currently Covered by an ExRiring State Non -Discharge General Permit North CaroUnaDepartment ofFnviroamentalQuality DirisionofWater Resources l Si2hIoithSaiishurrStroel 1d36Afai15en•iceCaUr Rand-.h,NorthCaroiva276991d36 _.. 919.1079129 C State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2024, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2024. Please do not leave any question unanswered Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Certificate Of Coverage Number: AWS100005 2. Facility Name: RobertWard Farm 3. Permittee's Name (same as on the Waste Management Plan): Robert G Ward 4. Permittee's Mailing Address: 6615 Robert G Ward Dr City: Winnabow State: NC Zip: 28479-5664 Telephone Number: 910-233-6525 Ext. E-mail: 5. Facility's Physical Address: 1100 Bell Swamp Rd City: Winnabow State: NC Zip: 28479 6. County where Facility is located: Brunswick 7. Farm Manager's Name (if different from Landowner): Robert G Ward 8. Farm Manager's telephone number (include area code): 910-233-6525 Ext. 9. Integrator's Name (if there is not an Integrator, write "None"): Mu h%-Brown LLC 10. Operator Name (OIC): Robert G. Ward Phone No.: 910-253-5142 OIC #: 16979 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine - Feeder to Finish 6,080 Operation Types: Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses - Horses Wean to Feeder Dairy Heifer Laying Chickens Horses - Other Farrow to Finish Milk Cow Pullets Sheep- Sheep Feeder to Finish Dry Cow Turkeys Sheep - Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment Lagoons, Digesters and Waste Storage Ponds (WSP): (Fill/Verify the following information. Make all necessary corrections and provide missing data.) Structure Name Structure Type (Lagoon/Digester/ WSP) Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (Inches) 1 Lagoon 1/l/1994 Full, clay 742,671.00 102,340.00 20.00 2 Lagoon 1/1/1994 Full, clay 104,544.00 20.00 Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.1OC(d), either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), signed by the owner and a certified technical specialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, solids separators, sludge drying system, waste transfers, etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Print the Name of the Permittee/Landowner/Signing Official and Sign below. (If multiple Landowners exist, all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name (Print): 0o �,La M I & t We. 11J iA, P— Signature: ew4a Name (Print): Signature: Name (Print): Signature: Title: Date: 1 X ! - X Title: Date: Title: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animal.operations@deq.nc.gov NCDEQ-DWR Animal Feeding Operations Program _ 1636 Mail Service Center Raleigh, North Carolina 27699-1636 -I utrient Management Plan For Animal Waste Utilization This plan has been prepared for: RGW Farm Robert Gene Word 6615 Robert Gene Ward Dr. Winnabow, NC 28479 (910) 233-6525 11-10-2019 This plan has been developed by: Greer Moore Clear Run Farm CamwI ing Services Inc. PO Box 338 Harrells, NC 28444 (910)38tjl�- 6 Developer signahue Type of Plan: Nitrogen Only with Manure Only Owner/ManagerMroducer Agreement 1(we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. k- 7--- ----- S*nature (owner) Signahae (manager or producer) r�- Date ��� This plan meets 'the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water "' assrvation Commission. Plan Approved By: Technical Specialist SignahuE Date 4582% Database Version 3.1 Date Printed: 11-10-2018 Cover Page 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. Note: In source ID, S means standard source, U means user defined source_ — -- * Max Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this source. 458296 Database Version 3.1 Date Printed: 11-10-2018 Sonme Page 1 of 1 Narrative Producer has option of planting a winter cover for tun -under, or harvest. Should producer plant a winter cover with plans to turn -under, the allowable PAN rate is 30 lbstacre, and must be deducted from the starting PAN rate of the next crop punted. Should producer decide to harvest the winter cover crop the PAN rate is 100 lbsJacre. Please maintain all crop yields. 459M Database Version 3.1 Date Printed. 11-10-2018 Narrative Page 1 of 1 The table shown below provides a summary ofthe crops or rotations included in this plan for each field Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown, where available. Planned Crops Summary Total Usuble Leaching Tract Field Acses A�a+es Index (LI) Soil Series Crop Sequence gyg 5002 F8 18.50 18.50 MA Lynchburg Com, Gram 125 bu. wham Grain 55 bu. Soybeans, ManunxL Double Crop 39 bu. 5002 PP2 4132 4132 N/A Rams Corn, Grain 125 bu. why. Grain 55 bu. Soybeans, Msnured, Double Crop 37 bu. 5002 PPS 26.66 26.66 MA Lynchburg Corn, Grain 125 bu. Grain 55 U. Soybeans, Manured Double Crop 39 bu. PLAN TOTALS: 86AS 86.48 < 2 Low potential to contribute to soluble None nutrient leaching below the toot zone. 2 & Moderate potential to ootrtribute to Nutrient Management (590) should be planned. <-10 soluble nutrient leaching below do root H ugh potential to contribute to soluble lNutrient Management (590) should be planned. Other conservation practices that improve nutrient leaching below the root zone. the soils available water holding capacity and improve nutrient use ei%e n y should be > 10 considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328j Long -Term No-1111(7781 and edge -of -field practices such as Fiber (393) and Riparian Forest Buffers (391). 458296 Database Version 3.1 Date Printed 11/1002018 PCs Page 1 of I NOTE: Symbol * means user entered data. 0 0 0 0 0 o a 0 rl'- 0* n - N N Ip3 N N N R 0*42 00 00 m C t��7► Or OR cr a oc W w� r t_ rA v cr OO� a, N N O O- a as Kt rn rn N N o o <D W N• P. O CD � O cr e� O Qp O rr C N ° o a cr a G F C o tic El�K sue'w' o � o W o K "G a ay e v9 zz- 6 • O O `r3 - rn O o c o c o o m ohogoaA i s w O n Q O C a' R A �+ a' P— a w CA cw w e Q fyN a can c m bc+ rgg*EPv S o .mod ° °O °9 a ••Y��' 4m oo co oe p �- v .00 O cc og It..: :ppt p• rph N ca a a o w rn U °° `A A7 N• A Y on O � �' d r'A 1 O O O O O O Lh 00 w H N O° cm O� N �j v v V J v V {ate V R so' a v q - a o d W 2 ta C� N N O O a rn �7 ¢ T � N N O O UA ttr rb cr ca A A A O ON 0o 0.this * F F v F H F � F vyi F �Ib CA A r %0 r [6 to O tJt O to O 4 R a w aCL � p� O O Cl O O O Paz A g' �C; .�. v $ w 0 0 0 0 0 o z a- 91 FE I�a G m to [A .A to U to S O O IN j o rN on rz c c �+ ID7 O O O N N �l N o iCQ- +7 YYY S d° � c o c CI 0$ fl N c o 0 0 h.y w 6 4 pVp��1 Q 00 _r W O ry �A a bo A U tW �p 6 Sir y The Itrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soi Is. If applying waste nutrients through an irrigation system, you mast apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each fiend may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rule Application Amount (cur') C=hM) 5002 F8 Lynchburg 0.50 1.0 5002 PP2 Mains 0.40 1.0 5002 PPS ILyncbbwg 0.50 1.0 452296 Database Version 3.1 Date Printed 1111N2019 IAF Page l of 1 NOTE: Symbol * means user entmed data The Available Waste Storage Capacity table provides an estimate ofthe number of days of storage capacity available at the end of each month ofthe plan. Available storage capacity is calculated as the design storage capacity in clays minus the number of days of net stone volume accumulated. The start date is a value entered by the user and is defined as the elate prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity ofthe facility. Ifthe available storage capacity is greater than: the design storage capacity, this indicates thatthe plan calls for the application of nutrients that have not yet accumulated If available storage opacity is negative, the estimated volume of accumulated waste exceeds the design storage volume ofthe structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage opacity. Source Name I Swine Feeder -Finish oon Liquid MO Stogy e P!CYYs Start Date 911 180 Plan Year Month Available Storage Capacity (Days) 1 1 28 2 51 3 71 4 92 ill 5 112 6 133 7 102 8 71 1 9 88 1 10 81 1 11 75 1 12 68 2 1 61 2 2 57 2 3 50 2 4 100 2 5 135 2 6 171 7 180 2 8 -180 2 LE2 9 180 2 10 149 2 11 119 2 MMEMMMUNMEMi12 88 * Available Storage Capacity is calculated as ofthe end of each month. 458296 Database Version 3.1 Date Printed_ i 1-10-2o18 Capacity Page 1 of 1 The following Lagoon Sludge Nitrogen Utilization table provides an estimate ofthe number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based an average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application ofthe effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not posmble, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PAN Rate lblac Maximum Sludge Application Rate 1000 gallac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Com 120 bu 150 13.16 7622 152.44 228.66 Hay 6 ton RY.R 300 26.32 38.11 7622 114.33 Soybeaa 40 bu 160 14.04 71A6 142.92 214.37 459296 Database Version 3.1 Date Printed: 11-10-2018 Sludge Page 1 of 1 Required Specifications For Animal Waste'!4 anaaement 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. I There most be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally titled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). 458296 Database Version 3.1 Date Printed: I I/10l2018 Specification Paxe 1 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall .comply with the following: The outer perimeter of the land area onto which waste.is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied cheer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 459296 Database Version 3.1 Date Printed 1Ill 0124IS Specification Pane 2 15. Animal waste shall not be discharged into surface waters, drainagewsys, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and - accessible. Berms and structures should be inspected regularly for evidence of erosion, leafage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to markthe top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 459296 Database Version 3.1 Date Printed: 1111MOIS Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels- in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be keptfor a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) Years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. 459296 Daiabwe Version 3.1 Date Pirated: l 1/102019 Specification Page 4 Crop Notes The following crop note applies to field(s): PP2 Corn 1: CP, Mineral Soil, low -leachable In the Coastal Plain, corn is normally planted when soil temperatures reach 52 to 55 degrees Fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1-2" deep. Plant populations should be determined by the hybrid being planted. increase the seeding rate by 105/4 when planting no -till. Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool, wet soil, banded phosphorus will be more available to the young plants. An accepted practice is to apply 20-30 lbs/acre N and 20-30 lbs/acre phosphorus banded as a starter and one-half the remaining N behind the planter. The rest of the N should be applied about 30-40 days after emergence. The total amount of N is dependent on soil type. When including a starter in the fertilizer program, the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn. Timely management of weeds and insects are essential for corn production_ The following crop note applies to field(s): F8, PP5 Corn 1: CP, Mineral Soil, low -leachable In the Coastal Plain, corn is normally planted when soil temperatures reach 52 to 55 degrees fahrenheit. Review the Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 1 2" deep_ Plant populations should be determined by the hybrid being planted. Increase the seeding rate by 10% when planting no -fall. Phosphorus and potassium recommended by a soil test can be broadcast or banded at planting. When planting early in cool, wet soil, banded phosphorus will be more available to the young plants. An accepted practice is to apply 20-30 lbs/acre N and 20-30 lbs/acre phosphorus banded as a starter and one-half the remaining N behind the planter. The rest of the N should be applied about 30-40 days after emergence. The total amount of N is dependent on soil type. When including a starter in the fertilizer program, the recommended potassium and any additional phosphorus is normally broadcast at planting. Plant samples can be analyzed during the growing season to monitor the overall nutrient status of the corn. Timely management of weeds and insects are essential for corn production_ 458296 Database Version 3.1 Date Printed: 11-10-2018 Crop Note Page 1 of 3 The following crop note applies to field(s): PP2 Wheat: Coastal Plain, Mineral Soil, low -leachable In the Coastal Plain, wheat should be planted from October 20-November 25. Plant 22 seed/drill row foot at 1-1 1/2" deep and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Adequate depth control when planting the wheat is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weds are essential for profitable wheat production. The following crop note applies to field(s): FS, PP5 Wheat: Coastal Plain, Mineral Soil, low -leachable In the Coastal Plain, wheat should be planted from October 20-November 25. Plant 22 seed/drill row foot at 1-1 1/2" deep and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 100% when planting no -till. Adequate depth control when planting the wheat is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions_ Apply no more than 301bs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time_ The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the wheat. Timely management of diseases, insects and weeds are essential for profitable wheat production. The following crop note applies to field(s): PP2 Double -Crop Soybeans, Coastal Plain: Mineral Soil, low -leachable Double -crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no-tillmg soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 2-4 seed/row foot for 7-8" drills; 4-6 swWrow foot for 15" rows; 6-8 seed/row foot for 30" rows and 8-10 seed/row foot for 36" rows. Increase the seeding rate by at least 10% for no -till planting_ Seeding depth should be 1-1 112" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-301bs/acre N are sometimes made at planting to promote early growth and vigor. Tissue samples can be analyzed during the growing season to monitor the overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. 459296 Database Version 3.1 Date Printed: 11-10-2019 Crop Note Page 2 of 3 The following crop note applies to field(s): F8, PP5 Double -Crop Soybeans, Coastal Plain: Mineral Soil, low -leachable Double -crop soybeans should be planted as early in June as possible with planting completed by July 4th. When no -tilling soybeans in small grain straw, it is essential to manage the straw to achieve adequate plant populations. Review the NCSU Official Variety "green book" and information from. Private companies to select a high yielding variety with the characteristics needed for your area and conditions. Plant 2_4 seedlmw foot for 7-8" drills; 4-6 seed/row foot for 15" rows; 6-8 seed/row foot for 30" rows and 8-10 seed/row foot for 36" rows. Increase the seeding rate by at least 100/9 for 110-0 planting. Seeding depth should be 1-1 1/2" and adequate depth control is essential. Phosphorus and potash recommended for the soybeans can be applied to the wheat in the Fall. Soybeans produce their own nitrogen and are normally grown without additions of nitrogen. However, applications of 20-30 lbs/acre N are sometimes made at planting to promote early growth and vigor. Time samples can be analyzed during the growing season to monitorthe overall nutrient status of the soybeans. Timely management of weeds and insects is essential for profitable double crop soybean production. 459296 Database Version 3.1 Date Printed: 11-10 2018 Crop Note Page 3 of 3