HomeMy WebLinkAbout20151268 Ver 1_Approval Letter_20160112Water Resources
ENVIRONMENTAL QUALITY
Two Bobs, LLC
Attn: Bobby Myrick
101 Shady Oaks Drive
Biscoe, NC 27209
i
PAT MCCRORY
Gowe u,
/ DONALD R. VAN DER VAART
Secretory
S. JAY ZIMMERMAN
Director
January 12, 2015
DWR # 15-1268
Montgomery County
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL
CONDITIONS
Heart of North Carolina Mega Park — Right turn Lane and Access Road
Dear Mr. Myrick:
You have our approval for the impacts listed below for the purpose described in your
application dated January 30, 2015, received by the Division of Water Resources (Division)
December 8, 2015 and the additional information received on December 18, 2015. These
impacts are covered by the attached Water Quality General Certification Number 3890 and the
conditions listed below. This certification is associated with the use of Nationwide Permit
Number 39 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you
should get any other federal, state or local permits before proceeding with your project,
including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge,
and Water Supply Watershed regulations.
This approval requires you to follow the conditions listed in the enclosed certification (s) or
general permit and the following additional conditions:
The following impacts are hereby approved provided that all of the other specific
and general conditions of the Certification are met. No other impacts are approved,
including incidental impacts. [15A NCAC 02H .0506(b) and (c)].
State of North Carolina I Environmental Quality I Water Resources
225 Gran Street -Suite 7141 Fayetteville, North Carolina 28301-5043
910-433-3300
Heart of North Carolina Mega Park
DWR# 15-1268
Type of Impact
Amount Approved
Amount Approved.
(units)
(units)
Permanent
Temporary
404/401 Wetlands Impact 1
0.05 (acres)
(acres)
Stream
123 (linear feet) .
(linear feet)
2. This approval is for the purpose and design described in your application. The plans
and specifications for this project are incorporated by reference as part of the
Certification. If you change your project, you must notify the Division and you may
be required to submit a. new application' package with the appropriate fee. If the
property is sold, the new owner must be given a copy of this approval letter and
General Certification(s)/Permit/Authorization and is responsible for complying with
all conditions. [15A NCAC 02H .0501(d)(2)]
3. No Waste, Spoil, Solids, or Fill of Any Kind,
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre -Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
4. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and.erosion
control measures must be such that they equal, or exceed, the requirements specified in
the most recent version of the North Carolina Sediment and Erosion Control Manual. The
devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil)
projects, including contractor -owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed;
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
Heart of North Carolina Mega Park
DWR# 15-1268
5. No Sediment & Erosion Control Measures in Wetlands or Waters
Sediment and erosion control measures should not be placed in wetlands or waters without
prior approval by the Division. If placement of sediment and erosion control devices in
wetlands and waters is unavoidable, design and placement of temporary erosion control
measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands
or stream beds or banks, adjacent to or upstream and downstream of the above structures.
All sediment and erosion control devices shall be removed and the natural grade restored
within two (2) months of the date that the Division of Land Resources or locally delegated
program has released the project.
6. Stormwater Management Plan
The Division approves the stormwater management plan (SMP), for the access road
proposed for a portion of the project considered as Phase I. The SWP consists of vegetative
filter areas, vegetated swales, rock check dams and associated conveyances, inlet and outlet
structures, and the grading and drainage patterns depicted on the "Stormwater BMP Plan —
Access Road" drawing of 11/17/2015. The SWP also includes the additional drawings,
engineering calculations and information also dated 11/17/2015 and received by the
Division on December 08, 2015. All of these elements related to the stormwater plan for.
Phase I are incorporated by eference and are enforceable by the Division. In addition to
these requirements, the following conditions also apply in order to meet the 401
Certification specifications set for in 15A NCAC 02H .0506(b)(5):
1. The maximum allowable impervious area for the approved Phase I road shall be
33,026 square feet. Any changes to maximum road area for Phase I shall require the
applicant to submit and receive approval for a revised stormwater management
plan by the Division.
2. The footprint of all stormwater management devices as well as an additional 10 -
foot wide area on all sides of the devices shall be located in either: public rights-of-
way; dedicated common areas; or recorded easement areas. The final plats for the
project showing all such rights-of-way, common areas and easement areas shall be
in accordance with the approved plans.
3. The stormwater practices of the approved SMP shall be constructed and operational
before any permanent paving is applied or any other structure is occupied at the
site.
4. The SMP may not be modified withou.t'prior written authorization from the
Division.,
5. Maintenance activities for the stormwater practices shall be the responsibility -of the
owner until the road is transferred to the Department of Transportation.
6. The applicant and/or authorized agent shall provide a completed Certificate of
Completion form to the Division within thirty (30) days of project completion
Heart of North Carolina Mega Park
DWR# 15-1268.
(available at
http://Portal.ncdenr.org/web/wq/swp/ws/401/certsandperm its/apply/forms). .
A final, written stormwater management plan for each future phase of the project shall be
submitted to the DWR 401 & Buffer Permitting Branch (1617 Mail Service Center, Raleigh,
NC 27699-1617). The SMP shall be designed to treat the runoff from the entire built -upon
area in each phase in accordance with the version of the 401 Stormwater Requirements and
BMP Manual in effect at the time of the submittal. Each SMP shall be approved by the
Division before any land disturbance associated with that phase may occur. In addition,
before any permanent building is erected, the corresponding stormwater management
devices shall be constructed and operational in order to meet the water quality protection
requirements of 15A NCAC 02H .0506(b)(5).
7. Any additional impacts to streams and/or wetlands as a result of future roads,
buildings, driveways, utility lines -or other development related activities within this
subdivision will require a modification of this 401 Water Quality Certification
approval.
8. Certificate of Completion
Upon completion of all. work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any -subsequent modifications, the applicant is required to
return the attached certificate of completion to the DWR WEBSCAPE Unit at: 1650 Mail
Service Center, Raleigh, North Carolina 27699-1650.
This approval and its conditions are final and binding unless contested. [G.S. 143-215.5]
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by
filing a written petition for an. administrative hearing to the Office of Administrative Hearings
(hereby known as OAH) within sixty (60) calendar days.
A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH
Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original
and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal
office hours (Monday through friday between 8:OOam and 5:00pm, excluding official state
holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of
the petition along with any applicable OAH filing fee is received by the OAH within five (5)
business days,following the faxed transmission.
Heart of North Carolina Mega Park
DWR# 15-1268
Mailing address for the OAH:
If sending via US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
If sending via delivery service (UPS,
FedEx, etc):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DENR:
John Evans, General Counsel
Department of Environment Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division under section 401 of the Clean Water Act.
Please contact Chad Turlington at (910) 433-3320 or chadturlingtonC@ncdenr.gov if you have
any questions or concerns.
Sincerely,
ra¢ Belinda S. Henson
Regional Supervisor
Division of Water Resources
Water Quality Regional Operations Section
Enclosures: GC 3890
cc: Bill Mullin — Dr. J.H. Carter III and Associates, Inc. (via email)
Jesse Wilson, P.E. — Wilson Engineering Group (via email)
Brennan Dooley - USACE Wilmington Regulatory Field Office (via email)
DWR FRO 401 file
DWR 401 & Buffer Permitting Unit file
JAN 14 2016
WaterResources
.ENVIRONMENTAL QUALITY
DWR Project No.:
Applicant:
Project Name:
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
S. JAY ZIMMERMAN
Director
County:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or.applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the DWR Central Office —
Wetlands and Buffers Permitting Unit at 1650 Mail Service Center, Raleigh, NC 27699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. Itis not necessary
to send certificates from all of these.
Applicant's Certification
I, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such. that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules_, the approved
plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature:
If this project was designed by a Certified Professional
as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe
(periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the construction
was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date
Registration No.
State of North Carolina I Environmental Quality I Water Resources
225 Green Street -Suite 7141 Fayetteville, North Carolina 28301-5043
910-433-3300
'
Water Quality Certification� _1 No. 3,890
WaterQuajRty Certification 9,0isitSUedJn1c.Ohf6rMi1
pr(Ifiba on Rurril�er 38. nts of"S6ctioh:
Carolina
40I, Pubilic..L-aw Oncl'95-217 of'theJJnit6d.7._tO.te.
s , OQ iond._ subject to the North
a A` H :0b00 -, ' C .0200
Q�Ivfsiori ofWater: a Regulations I ns I In I 15A NC_ Qand 1,5 N
Quality (bWA _CA - 02B_
.forA.hO:disqhjr6�.eof #11 natoff* to waters and 1-4japOR wetland.1...1 .
-'orjl
o
we
0ald,area
nota 1part -6f.th6surface tributary system tdinterstate t,p)avigl 1e
waters of the United'
Stow rlbp0in _CER -33QAppendix _k(g) (18y .9, 39,41, 42,.44,,.and A6) of the Corps.
A N on Rules (Buffer Rules) in 1 5A:NCA**C
,of�ngi.neerste.guio(tfons.-pnc[:fprt4e'Riparian rea
,.a :0001:.
!'Ca [jr�o oert0jes-that:the,:specified 'eaegor,.y.r,.of,activity Will not violate
Tho:State.of - North 'Carolina
piflops. of, $e6tions 8011, 102 30.31111306 and307Of the Laws 82 500 and;95-217
if c6nd, - tods, d With the conditions: hetdihift4 get. forth,
uc -in accor anca, h
Activities meeting any one (1) of_the following thresholdfa
rcumsta,
qtces require written
1
approval
fora 441 fto-Lr-'00,4fityC-ertftic.itio�tr Jh#`D11Vt 0" Of-WO0044
MY
IV
'--a.- Any to streams involving excavation or dredging,
or
b-
-,
.
TotTmplaotsvith jhe,OrpjeOtp
uricari�teOuitoor reaterthanASOjinearfeet
of. stream; in Ndinglemprar*Iqr pprmanenjimpac.,
--c. Any strea-m relocation; or
.d.: Any�,imp,am associatedith a high density prpj,e'qt.(as .defined in teth:,(A
.w'
Stdrhwdt6r 06,qulrenonO that [s: rlot§u qqt o either a7s, stormWqu"
rprqqi�q6(such
,dsbut not' limited oostal. oy0fiep,,HQNV,DRI,
.M, saAe im.p.,
nn-0oA
6 Phase
-_,e:. vemporaryt Op . ..
qrpprmanemimp v*!�kqt,4j4j-tU:U1
UIMIMM L1101 I VI1.V!74G1JL.I.I &�Il: IV/ qy;c�Wu
or open waters;;
.f. `i4ny1rhh a -t to 'w0flaficsadjapap to waters designated :as: O.RW
;SA, VIES
A_t;W-AS
4 orbarolih,
Trout, -or Ws design :a§ -a. Northa;or National Wild
Ald
And Sb6nic River, or
g., Any impacts to coastal v011anc5NCA-'07H -.020. .j or Wetlands
(UWt.
NGA0102H1 .0506), or
oran.Onforcemefit',action for vViolation(s).of
,DWQ-Weffand kuteoll'5A NCAC o2
,o
Ifod Wetland Rot.(A,BA
N
604'3-0H
A300), DW0 Surface: NN4tOr W14pcStandards;. otAlpntgn Buffet Rules ,
-A.
D2B,.'020Q)',]O'r-i
T:Any impacts to. rOAMg and/or UffegJrv,the -Neusp, Tar Pamlico;. orCatawbatawba Diver
- DrfmiheAe1bM6n,JOr GOP$ Qr6dM6t"etsheds (b(dhydther b 6Twatershed
the thI6,0fao-pikatioh.),
Nvitlh.Ripaii'M Proiodon- _R'O
11 .1
'PTI- m these rules ora-l3u# rAuthohiatim
Certifc9t6_i9Tssu6,d, �through N,C,, t1lylsJon o Coastal Managene..b0M)#e1ega1IO for
"ALLOWABLE' activities:.
l.n.apcordance With. North Carolina; 0.oneral Statqtp 143 2.15.31D(e), written approval for 401
.afe.'rQuafity .General CertificationMU.stinOlUd tare appropriate #ee. If.a project also requires; a
ANAPerm
Permit, then one, peymebt,10. both -agencies shall be submitted and will, bethe htgh6f of=the,
tvuQ fees.
-Water Quality Certification Na. '389,0
Water, Quality` Certiftcat . ioh, -No.. 3$910
Activities included in this GdnerAl. Certification that d6-ndt v_ Ot one of the thresholds
listed above do,not re'quirewritten appr,6Vallrdfn: the . jvJs1q,n as long as, they comply With
the Conditions of Certification iiliwd 601OW'a (f any. vi these Conditions cannot be met, then
written appr.oval'.fr.onith6.&i.vii§!'On.is,required.
Conditions of Certification:
1, No Impgot.5 Beyond' those Awthlorized in the Mitten. Approval: ar-Beyond thejh.resbpld of Use
of , it is,Cqmfinwio.p
No waste, spoil; solids; or fill of any ;Xirid shall occur fmwetlands, waters, ornpa'rian, areas
b6y,56d.the fbbtp 'n c ristrud.fibin.Notif,
_ri.ttf 'the. impacts �tg depicted in the Pre -Gd ica. ion,. as
authorized the Written
approval'fromJhe*Divil�ion�or '06thresholds blishedfor
. 1. .1 , _6yon
use of tris Certification without written authorii6tion,.incl'udiilgi.n6-fa6htiaI impacts- All
construct'-rati'on,-a'r.ldMain.tehAh.,'t6,i�f
.h 10 [Vitle .1
Struct' n acti I sj � ftclu.din,� . _.,g. design, ins- 0
sarhehtand 0 �.Ont.Prttotic.Eassh6ilbe.p.0.r*f.dfr6(�-d..so th, a
-, t, no
violations of state-waterqua quality standards. statutes, or, rules occur. Approved PIWIs and
specifications:for this Oro-jectpre incorporated by reference andiiro:ehfb.rco.able.:parts of this
:permit.
2. 'Standard Erosion aiid.8e.ditnEihtControl 'P,raoti.cas
,Erosion -andisediment cor'itrcif practices Must bein: specifications
.governing :ffie prppprdpslgnns.tPllatlbh and operation and ba - en cewf6. KBest:
Management
Practices and ifapplicabld, comp 'Vith;t. h6
specWrdlilons and
feqplt6mentsrofthe NPEES Constructloi:Stbrffiw6terPer,Mit
Issued to th6- sife:.
a. b6sjgft, installation, aperafion,jand inainterianpe' pf the: sediment tinct erosion control'
measures.ffustboo uqh.thafth' - -equal: -or exceed. the� feduir6ments,'tp. specified in'the, t
s� - - _. . they rn
recent.versiono_h * - '�Carol rJ
a-S60jmqOfand Efdsi6n.06htt6f MK61., ThedeVibes
shall be,:. ffia-i-Tit-alhe'd 6A all construction:slie bprrdw�Jt6s.and W6§t0:p5 epo1"1),
projects;.. .
mcfuding contractor -owned o its associated. With the .'O 't..
-
=
pper6ted, and maintamed in with the,most: recedf Version,& the
rofina;Sdrface- WhIhO.MahOat.
d.; FZe 1,0im,40 mp'togs irnent,06� tj)�.Ipitio on in
p.re§�, and !mole . _.. V
Control - .-
aQ rjance:with-, ftp requirements i0 1 -Act,-- and he
I y1rements of the m oil
Mining -Act ,of 1.971::
.d,. Sufficient Mot'erlp[s.rQqqired',f6rstabilization and/or Te' pair.:,,.. erosion T�ks
aiid -gfamwAfer routing-4rud f rgairrient-shall-,be w site at 9111irrits.
If the; projectwaters -Qrvotorsbeds-p
#��jffed as Primary Nurser
occurs in yAreas,
SAWS 1, W8-11, H1,
b'Q"aI1tY(HOWY,,QrQo
diryd, Resource. (ORI waters,
�tM
sedimer6tionand
e(OS16hOn ro .
_0 .t 1: designs
in-1ZANOAG 048. 012.4, 00,_-_Standards:it? Sposiffile'Mitershed.&
Mier-, Qualify Certification No., 3,$90
Water Quality. Certification No. 3e-90
3. No 5!a.01ment and Erosion Control Me.atures in Wi3t,lRinds or Waters
Sedinnent-ari erosion control measures -shall -not: :be. plac
Exr,
.Options: to this condition require, application submittal, b , ivision, if d i06� h f
pigcomept of sediment ahrfeitro§ to t6irdi
.Unavo . 1&06, then design- and: placement ofbemiporar Or
conducted in*manner that M. -�e . qu . flibr'lum
ay,nesult,"in,dis
adjacent to. or upstream and dpw.n'sirea.m of 66 aboVe si
.control devices sl*[ be removed and the natural grade r
date,that, the Division of Land :Resources ,(DLR,,) of lodzilfj
the q6oific area Within the project.
0
4. :Construction 8tormWater Petmit . "-NC.OQ1G OG
An NPCIEa.Construdtion Sto.rrnwateC,Permit iwsrewired for con
one (1) or more acres of land'. Thit.P�errnit'allOwsstP'e�t,v�!t ' de I
torbfrig.
dis -construction: activities as stipulated d. 1-h the .:c di
ns
is covered 40b this petmlt, full 6.ompKiance With, permit condition;
n"
sedimentatiorrcontrol`plan inspections and: maintenance,
and -reporting requirements is, reT
ulto.d. A copy
b
,ftispbCtion- log sheets, -arid. other inf6rMatiOh may 0- 0 - U04_
fittp 6,
po�!'t6l..n6d&tit.or�lwebw.aws/su%nodet-i§
eflands or waters.
wMenapproval b.V-the
�vetlards and waters Is
Introf measures shall' not be
Irt ds,,strearji,-.beds,-'or banks,
s. AlLsedim.ent and: etd.si6ft
within two (2)..montlis of the
ted program: has released
Cs that disturb
!during jano
If your project
onng,recOrd
The . -N,brt'h Oaroline E*artment of Transportati6n.(NCDO- uired to be in full
.()h-.,-, .,tlViti with the mpstlecent version
jq , '. 0
compliance-, wi d(tioj'nsi reI6ted,.tq.ddnsttUdti in
h i
ei.r :ln4iV..idu4iNP-PE,.S(NC-S0002'5.0) stoftfta erpe,..rim
it'.
6, Con§ttu[dtl6h.Mdr toriurn-6,a-nd�CoorO.Ination
activities idd . of high- biological activity (Le. sea turtle nesting, fish.
. tivities. must -occurduririg'perl S. -
p I atthe requ.1,00 -.6 other
r�quked
g, -.pr bird nesting), then bidl6gical. monitoring M
,afo or federal -acencies and b6dtdina*d.with thesb" a6t
Nities.
Commission -(WRC,)-,,USI'Fish;andWild tifeS'.e(vi.ce-'(!J--$.F-Ws �.Q
.,�,..L)i-yi$ion.ot.:.marine-., isneries
(DIMF) or'Nat"ipO4MArinq Fis ere�.'S Seance: (N
M
tro-ut,bradrOM6Ut
fish, larvaflpas=larval;ffshes :and ans1,-:br._oth"a0r-aquatic spedies oft. ncernsball'bd
]f 016m pepti0hS to this -Poncitionrequjte-wrron 6 pro wresource rce agency
tia, qsIbIsV n
forthe.gi. e moraftrium--
Work-Wifth troutcounties -oridentified stato-orf6d0ral
,
-endangered & threatened species hp(bitpt shall be. coordinated A . W. theappropriate WRC,
u8.F_\AF§.,,MMFS.--, and/or DMF pomonn'el;
6.Work in ,the Dry.
A114ork in or c1djacent.tostrearn-Watots shall be conducted so ihOttheflowing-stream does.
come cin.., contact With the.disturbed I 'OrOV90 . best management practides from the.
inapt ,i area. -.Approved
-C-onte6,fMaitival',-or.thi��NC. DOT'
of of . tit and. Erosion
Odristructiort*and M6interianceAdvitf0g. Manualsuch .-
: ch Pssan.40a s, rock b6fms, cofferdams,
4jod . .0 . th
Construction
' 0
- -nl structures shall be used;to minimize excavation in#(owing water.
iExce0tions to -this condition require application submittal to and written approval by the
Divisi.dn.
Water Quality Certification'.No. 3890
Water Quality Certification No.. 389
7. Riparian Area Protection (Buffer) Rules
Activities 1pcatqc[ In the, protected riparian areas "(whether juri-sdicilonal' wetlands:or not)v
within the NPP,5%.Tar-P' them
am lico, or Catawba River Basins or in thio, Randleman, J or ordari
Goose Creek Watersheds (or any. other -basin or)ijbters od wiffi. buffet r,.0 shall bism fd
and constructed in accotdance-with 15A. GAG02
to t4ges"j_ .0#1`10 within a 14 '13; .233..X259,
-0243 QZ6Q'.M7 and .a605,.and shall " 'be. located, I '_ddigigh6d, constructed, and maintained
to, havern--rirra'urbaace to protect water: qu6lif�o: tfte maxm0,extbat p-ractica
ble
.through. the use of best management practices.. All buffer: fu16-reqUirem6rits. includiingAlffuse
flowleVIrwontsi must be met.
8. If. concrete ,is.,used, during t he .oqnsfruction, then all necessary measures shat(be t6kea to
greveritdlreot confac(between uncured or curing concrete:and waters of'the,sfatO. Water
'that- inadvertently contacts uric;.UreO concrete shall not,be discharged 'towaters .dfthe state.
due, to the potential for-elovote.0 p_H:an0- pgssibI6 aquptic'life[flsh kills.,
-9. Bridge:deckidrains shall: h-00isch argo directly into, . o, t I he streamStormwater S wpt T shall be directed
;across `the bridge, and pre treated through sito:appr.opriate- means (grpssqd_swajes,._pre_
formed scour. 1161,6s-, vegetated buffets, etc) bOf re entering h
e stream.
rp6m, Please;referi6 the
most.c.ur tV.4rgid.nof St6fmWder'.0.eSfM . Practices. , E��(ceptions. to this- condition
ren Management
require.writltein' a' lIp-roval'by—the Division.
1Q. Compensatory 'Mitigation
N
-compens.otory.-Mit��otit)h,''ma'y�'b
Cle e* required for
In AG 02H �'O
;loss _6.of6quial iootlgreeter thain 150 linearfeet6f Wearhs'(ihtermitt&htand petennlM
:4fid/.Or'equal -..to.;O�r-g,roat6r than one
f _(,j) acrg
of wet -lands'. F
or_lihear public transportation;
onqect�, lmpaots:equal to 150'
linearteot per stream shall. require ffiitig8ti0h.
may e require. or any - - - . Buff '11610S
Buffer mitigation b -df ' any . ' c -t wl �. . pr in effect at the time of
_proje ittl
application S:-! "'Allowable I Mitigation" P
,)(pat.iOn-for activities classified 8' WllbW4 lovith Miti r ";Prohibited within the
Table:of Qse.s
.General Water, Quality Certification forlhis, Nationwide, and/or ko-gionaf Gefferal, Pei-rnit
Design j
monitoring protocols shall follow the US Army
gineers
- '1'' ' . _ .j - ' [p on
District d6n Guidelines (April 0rftssUb$bqffeit updt69 tomponsMo
ry
M!66zi iqn_pjans:§tqll4esubmitted to -the Divisiorifor-Wrft h approval 8`61*d'i
those
efore-any""
pi:Otdco,Js- The mitigation plary:must be. inip-le'rh6rite. . and/or-'corittructed'b. -Impapt
DOW on site: A tiv I'v,7. the Divisidn
wilfa cc'*epfpqy'M t into
,, -an in .lieu fee ' program
or-
a
Inthese-cases, proof ofpaymerit hall Vqprovidedo'the D;Visi00bef6re
<;Iji-Y imppcts:gccurvri site:
Water -Quality Oerfificafion: NO, 380,Q
Water Quality. Certification No. 3890
!I. - Relocated stream designs should include :the same dimensionspattern§, and profiles as the
existing channel (or aistable reference reach if th6existihg,ch6nnel is Unstable), to the
`6e-.'b66strud.ted.ih thf§.,.dty and water r shall
.maximum extent practical. The -new channel gl�i66id
h I until; the ban ar
not bbluihed into then.' k e. stabilized. V60etAfi6n used for bank
I ew channel.
stabilIzatiqn.shall be limited. to native wood - y-spqqies„and should include establishment of a
30406t Wide. Wooded and an adjacent 2-046ot.w[de- vedeitated buffer on. both Wes Of the.
.telodated channel to. the maximum extent prac66lA transitional phase, thic-bripor-a ting
appropriateJe mEttlng. -materials and seedling e:st.ab.lishmeht
-Is allowable,
howevermattng that ncorporates plasti0Meshand( pIps6c_twhathd] notbe Use
in
wetlands,. tipafien W.fers or floodpj'aihs-a recomm'e ed by the Carolina Sedimentment
and Ero%(ohControl Manual. Rip -rap,
A-JqQKs, concrete, t*, ga "bions& dtherhard*.struttur.0s
may beAlOweId-If.it.is necqssa'ry to ma_Ilntain.the
physics[ I`6*lty.of th,dstreaffihowever; the
apo.kant-mW§t orbvideWrittenjugtiftation.
and any :-calculations used".to determine the ,Oxtent -
location: it, conducted as a stream
6 coverage Please note that if the o..t.r.ea.m...r,e,.
p. cove 9,
restoration Enjinbert.Wil m, District, : A .08
.0 at[Oh as. defined ib the US' Army C.qrps Qf
StraaM. Mitigation Qoidefine8-(orlts subseq-p.ehl updates), the r&46f6d ieh9th may be used
.as; compensatory Mitigation for the impacts: rsuit09
from the relocation.
M, StqrmWOtpr Managepenf, Plah,eq If me
Re u e Tts
dress stormwater man a I geme . ntthroughout 'the .entire project area per
the 401 S "r_`Aft_._._hrhd_ fOtth:X'd f, this
lormwator. Requirements r6f6ren .e 0d. 'herein as 4 a n
certification
-11. Placement Of'C_Werts anid Other Structures in W.atets and Wetlands
Culverts required for jhit.pr6ject- shEill'b6O.esi-o�ed.:an.d.-installed in: such �a manner-,thai-the.
original - stream profiles are not: abhj# and -jallow for aquatic life MpyeM.eni during tow flows.
F_klsf ngstream ,d[mensibns_(inalUdift and longitudinal
9. (Imongiop%. pattern, a
profile)., Mustbq maintained above and, below locations of each culvert:
e0t:ofculverts and : other -structu-rdg',.ih'W,8itdtg:�ah'd..$;tr be be, bwi
rttMith inches,
When topographic constraints indicate 000�
lopes -of greater than 5%, culvert burial no
t
required provided that aitaltra V o01pps for fl4ft6ning;thbalope have been investigated
and aquatic movement/ coon possible k'
connectivity s (roc ladders,;
crossVaries, -etc}. Nbfif.56.6tion to the. Division including -Sqppbrting documentationtolnplude'a
locafion. map pr6filedrawings; 'and slope calculations shall* be provided
to - the 'Divisbn. 60 days. prior to. tholn5tallotion. of the culvert.
W"hen,bedrock. ispresent ih-culvert locations; :Wv'ertburial isnot,
required_ -, p
rovidddthat there
is suffir
0ocumentatiombCOO presen-00- bedrock,Notification; tion-t6-th.eOivisioninC_ludin
supporting-documeritatioti..iuc.h asUt h
n. o�.Iimjted'to� a. location. mb.pof t. e:culvdrt,
'ihim
ge4i�qhnicpl,-reports-, I)MO.Qn-a m urn of 60
installation e, f bedrock
eorook i's disco
days priqaq the insta on of the culvert 'dUl ye,r6d during construction, then
.the EOisjon shall be notified by phone &email within 24-hQurs of discovery,
if other site topographic, 'constraints preclude the ability fob,ury the culverts .as
described' above spid/or.it can'bedemonstrafed1. _that.burying the culvert
iWQpjdresult in
dostoilizati q oft channel, then exceptions to thls-conWHt-qn re( sub
mittal
to; :and written Pprov
a _al.by, the Division. of Water Quality, regardless of the total impacts to
.,
streams or weilanOs from the project;
water Q allty-Qertification No. 3890
.Water Cortifloat.i.ohNo. 3890
Installation .of culverts in wetlands must. Onsprecontinuity ofwater movement and be
designed to adequately accoM modatei. high-water or flood &Oftditions.. Additionally, when:
roadways, causeways, or other fill.projects- are. constructed acr6ssFEMAAesignated
floodwaysorwetlands; openings such; a,g.d.,O,Nerfs.-or.briO.g '-inustbe*provided. tbtnziiht;4irI
0. ,
the .natural hydrology of the.§ysfern �,as mv N �as pro ont constriction -of the-fldodw8y that may
result In destabilization of streams or wetlands,
The establishment of native, woody
dy VOgetafioft 6'ridother -soft.6tream bank.stabillzation
techniques must. -Oe -used: where. practicable instead of ripraip or other bank hardening
methods.
1-4. Alltemporaryfill and culverts shall -be removed and the -ftcacl:Odarea- returned to -.natural
�6- - I—— pl- .
c within 16t the. temporary 't lo-riger
on ions� wil 0 days the d6terminatikon ra.ry impac, is no
Jn
necessary The im'!pacted areas shall be restored to o.rginal, Ode, including -e
achstrea '
or,ginalOross sectlonat ftq ions,.plan form. pattern,an ongitUdinal bedaMdbed
s
profile,.
and the various, sites shall be, stabilized with natural woody Metotion (except .for tie
ap
. proved maintenance areas) and restored to prevent erosion:
1:6. All temporary'
pipes/ -culverts/ iriprap pads ,etc; _:shall be installed iin. 611,sttea.'M's 4§,outlined in
recent C61*61 Planh 'd
:the most -edition of the./Vort * h C ing-an,
Carolina Surface restrict stream
Design Mantfalo(th6Vort4� h4lWhdaiio -as notflow
or cause -63-equilibrium during, use of Phis General Certificafioi.
115; Any ripra-p required for proper d_ulvert:pl acenIehit; . stabilization; or restoration of
'temporarily dj . stprbeclareas -shall be-: s rictedt area directly impacted by the, approved
re t. ar
rip -rap shall --d 40-&61 "keyed t the original`-stream'construct n activity: All rip ,p S a ;buried r in"such that;
elevaii6h,ahcl-Weambank cont6uttate restored and -maintained. -Placement of rip -rap -OT
ofher approvedrhateri6fs-sh6lih6tr6suitin.,dk-6t8ib I lilzatiOn of the stream bed or:banks
upstro.prn or downstream of the larea.
17. Any rip -rap . u . sed,fbr stream stabilizatfon shall be of assize'and deniity'oo.as not to be-ab.I.P.-to
be carried off y- W,9ve, current action, or stream flows and consist f -n or masonry.
W tio.ril.,
material'teO 6. debris -i toxic pollutants .'-Rip -;e.apshall not .be--`.Ih8falled! in the -*6ambed
.'187 or X
6x depti . h integrity (i
Measures.
_8i A f4rti application ofT lizor to re. -establish vegetation is -,allowed r
in disturbed
incluoding riparian: buffers, but is.restricted (6 no'?--loser-than 10jeetfrom top of bank of
streams pyartil!zer application must complyly with th er-Fe deral, State..and Local
.regulations.
1-9. If.thit WEter-Qu11tyCertificationis used to a098- building then
ll lots owned by the
p%be buildable,without-additio :impacts qcfs-to-ifrearn of ftlands. Thazoplica nt
isrequired: foprovide evidence that the are bII2HdpWO,Witfi6Ut requiring additional Impacts
itbdId4o $01W hq,--�y the"Ojvi For -road
16 `wetlands, waters-, or buffers if required si
construction p`qrpose$-,,thi . s Certification shall o. 11
h*lv be ut )zOdlr nqtural high ground to
naturai; high ground.. '
20.. Deed, riotific o djurisdiction;l
i ,afi .,or sir�#pT rnqqh?nisms.�.hall'b_e placed all reiaihe
wetlands, wate-rs; and iprotective buffers within, the prqject-boundaries ih'6rder to :assure
compliance for Wetlanc,,w4ter, and buffer inp bfThese mechanisms -$
fi
all be put -In
place at the time of recording of the property of of individual lots whichever isappropriate. A.
sample deed notification n. can be downloadecfr6hth6.401N6fl4hd'sOhtwLbsite a,
http //portal ncdenr orgYb/,Wd I nd64rf" ia - Wfi&m's, "Th. text 'th.
9W IfS DO of e
- Milt to: aC $pedfit project.
sample: deed hotifib4tion. may b� modified as 6ppfdpirial:6� to
Documentation of deednotifications shall be provided to7the Divisionupon request',
Watet Quality'Cortificatiori No. 38.90 6'
Water Quality Certi . ficatiOn-Na. 38-90
21. If an environmental document is required under the National. or State Ehvirontnental Policy
Act ,(NEPA,ot8EPA),then ,thiS:General Certification. is not valid until; a FiM.ing of No
,
Significant Impadt'(FON61) or Record.of Depfsion (ROD) is issued bythe State
Clearingh,ous.6.
22, In theTtWenty-(20) coastal counties, the ap piropria.06. DW_Q Regional Office must bo contacted
to. determine it Coastal'Storniwat6r R6glutatiohs will IJO required:
.23. This General iCertificationOoes not relieve the applicant df'tha responsibility to., 6bt6iri. all -other
required Federal, S_ta(tp..or Local: approvals:.
24. The-applicant/permittee and1heir-,auth 'a in a manner
,_qrixod agents shall conduct al( a6fivifle
-consistent with Stafe, wafer quality :standards ('n (including
requirementsresulting-from
Acts, and othe appropriate requ�rerne
compliance w of -the Clean Water. A, -and propriat nts o
hdaitds or lawoore not being
such standards State and Federal' LOW. if the Qt i,s[Qn rmj at
'f
met, including failure to. guslato -a des" nated.qr 4ch10vqd..use-. or that S ate or. Federal law is
05- are :necessary to assure c
0 1"c then the
being, violated, (it that furth6rc 19' cessary6 �
uality Certification.-
Division may re6VOILlate.,and modify, this, Ganor6Ma.i;r:_. d
25..1N .en ritten authorization is.recoiMd lo Use: Of this certification, completion of -ill
_.en W s ppgn -com.p.le
P On 1 and any subsequent modifications;ithe
0 impacts'includ6cf. wit.. in the a
Otto _Op"
u e certificate -oh attached, to thiOap
plicant'shall be required to return th ific atd of - 0,6.
b " ' "�. " "I Ice In. Raleigh t 18,66. Mall.
80ntto, the;. W
Qnot py of,the certificate shall. be:
Service Center;Raleigh; NCV2769f9-1ff5D-
2 I`ocm tion�.,�includingm.b.hitorino�prtdlor.,rood6ling..
6. A ficrial site-specific rewiroments, May
1040projects . . � propose . r-,
tie added t6th �-writt approval r f6f d u We Quality
Certification. in order to ensure complance�nrith all. a idO _a(t f quality and qfNqnt,
standar
27Thi,s,cert-i-cation.graAs, permission thedireqt0r, anauthor
ize.drepresentative of the
Director,..or'DENR staff, upon; the 10q of proper credentialsto enter the properfy fty
,during normal,bOtihesshours.
This Goneraf-'CAt
.ertificr iomshall expire on, - the same day :as 'the expiration date ofthe.
icorrespondin it Tha. conditions 'da
corresponding Nationwide -and/or Regional GenAra('POM C--n.d[f sin6ffdctoh'fKe _tO
of 1
issuaric,&.of"Certifica I n,fpr.,a.:spe'16itid-or6je,ct.g.h remain 16 offbot-for th6life of the project,
- Al[irem"
rojoafdjos.t. -0f-fh,e-"pir..qti.on date of this. Certification.
Nori:cornpliahoe with
hor-viojati.ond.f-,the.-ponditionsherein sett-fOrth by -a- specific project,.m.ay-result.
. . "r . _.. ,
in
project and MayAlso. result -criminal and/or civil
revocation of th.16- General Certification for the �pr
penalties.
The Director of the North C-017011no bivi§ - i4n. of Water 'Quality may rdq,Uir6: submission, of- p, formal
p, 0 Witdetermined
gp lip ual,c jcajfomforany pToject in this. category. fact y.ifit
atiion for Fndivid I
.that
�the
-protect is: likely tbhave .eisignificant..E v6rse- e,ffect upon W
aterquality, in'c
loding;,stgtoor-
federa.11y-
listed endarg6recorthr6atenEd aquatic (p5ppcies, or degrade thewaters .sOthat0)dst[q9
bspsof the wetland &- downstream waters: are. precluded
'Water Quality "'Certification No. 3890
Water Quality Certification No. 3890
-Public hearings maybe. held forspedific applications or oY
Certification_-_ decision if deemed in _- public's_ _-_'-_—__-~ the—_ -Directorof the North Carolina,_
'--~--~—`---r ---ir
.� date. March 11— '
. �
' DIVISlONDFVVATGR0UALITY
By
�
� Oha/les\WAbUd` RE
. Motor_�
kistory.Aldte-' ;Watqr Quallfty. q-9ttificati6h, r'18,90 issued March 19, 201.2. rqpli�cesz
twQ
the Carps -of Engineers reauthorize,& any ofthe coiro�p
-
VVotef Qb»allitn No_MO8
Water Quality Certification No,. 3890
Attachment A- 401 StormwatipuRequirements-
The requirements listed below shall be, implemented in order to comply with Condition 12 of this
-the. North Caroliha DepaftOni:of Tran$P00ation, q0_mp(iaPce with
General For
the.
Jn U .0: shall $6Ne t - la
, 0 satisfyf1le 4Q4 and I o ted
,divid al,NPDES permit NCSGOO.25
Wetland Sc'tQrmw . ater:Requir.ements.1-
A. Design and fmpl6mentation Re4Uitetne*fifi;-. All pfojec%; regardless of project area,
amount of b- ilWpon area or amount b f-juds.dictionw iMpai t, shall Meet the following
,stqrmWqte,r design requirements:
4fiiWetlandsi..
.f. NonErosive Disi:hatge*to-ttreiiftis, dStormwpteT,qonveyances that
discharge.to streams and wetlands� must-disp -arge at a non erosive velpeityprior to
entering the stream. or wetlandduring Ihepea kfi owfrom theten-year storm.
'V0g0qtq;l.,Setbacks. A3046ot-wide veg0t,16 ' 4,
hi
str s
PrOW ore: stringent ction.Rple-ot Other m - t vegetati
thesetbackafall beMeq re
pu Thorii.6ntallyjtbiq
struc streams and ruler:
ppe
ne.Vege i-ia e s
w0fewafers,.r P, ndfcUlar,to z4ordli q.-
or.lok.�6 nffipnt impy-pe met.-conbOrrently 1
, I govo�r . $
coastal, Isolated Or 404 jurisdictional Wetlands...
vegetated setback be Oloored and
., .. - :may - ,graded, -- 3
in. gra$s, qr othpr vegetative or plant rnat6rial.-
main maintained adjacent to,
., .-ta - -
to..A.state Ipprian.Area
iqvirpmen[ts. The width .of
Pool elevation of imppu' - _n _qded
, (nfitgh,wat0jrRheW'tidal
Item rqqufred by state rules
i i Ireim. o 0 taod, rna contain
, - y
$6n -a' Portiqnsof the
.. .1
planted withand Maintained
iii:'.. Construction and Operation. The sto-0hW at' e-rma,nagenon �p �jn.m
must be tPI.Struct.q.
andopeNkloperational before any-,Prmanentbuilding.o-t-erstfuctur Iq_occupied or utilfzeO at.
the site The stormwater mahagementpl6n;including .draihage."patterns, must be
hiiAlhf6inOd in perp Ayo 4
iv.
..Otqn
,th r,$ -
.PWatqr:F
b.6 Mz' m'uh.fty,s.gt rMwaterman
comp . ap _40VOthit 6 P dr0od
'that are $ubjget to
InO (but not firdited
-and-moint 000 in
St0'rrnWAt6r eWg'A.R'q'q,reorients for Pr6jectsNot .Covered uhddr:it6h..(Iv).. .
program dr',.!. CeftMR-i-d-
,plecsA -e-,not --,!§Libjocf'to-.Anothor'D.,W.-
biomM, fall of.�
�y` shall wEA r, program s a Mae the.following requirements
A site is _
1;* 00njsity if all th6J6 owingrequi requirements tit -0 Met;
-
built. upon area. of twenty '-- 6hty-f I butpetbebt (246/611 or less,
development.''Whohdetorm-Iftingthe: amount
cohi3iderft b.dft c.urrent.pnd future
'built Upo, h area, coastal wetlands shall :be lhdludod:�, howiavO, and
revers as specified IR NorthCarolina's Schedule o f Glassificationsshall, be
e 5 -d jf-a_p6ffid.n.of project has a den'.sity 'grOdtbfthan-�24%,'ih6..,higher
xclade
density -area Must be located in an upland: area and away from surface waters
)dMqM extent practic&eP
and d(ahag. ay$:to-th.erna
Z Ali stormwafer- runoff from the upon* areas is transported primaritY via
vegetated . 6d conveyances designed in accordance With the most re.teht,Vergibn of
fh-.6.AI.CD_WQ 8,tormWa`*t6r**Be_st, Mqnpgem . en't Ptactices, Manual. Alternative
designs.' may be , approved if the applicant can show that the design. provides
Water Quality Certification No. 3800
Water Quality Certification No. 3890
equal or befterwaterqUE!Ilty"prOtedtiotI than the practicesspecifiedin: the manual.
The project must not include 6:stiormwatercollection system (such as piped
conveyances) as. defined in 15A NCAG 02B4O202(.6Q).7
b. High Density. Projects.that do not rne6t:lheLow Density requirements shall meet
the.following requirements:
1.. Stormw.ater runoff front the ;entire: site Must. be treated. by structural stormwater
controls (BMP's) thataredeslon�d'to--r-e-mo-ye.e,'i§hfy-f[Vo,percent (8,5%) Ofthe.
:average :annual ,amount Of Total - §bsp6rid.Od.Sbl1d (T8S) S-tormwo
terrunOff
that.dralns� directly to Nutrient Sensitive VV teirs{NSW) must als0.
be treated to
removethirty percent (30%) Of -Total
Nitro'Oen' (TN) and Total Phosphorus (TP) 8
2. All BMPs must be:designed* in ac:d6rdahc.e,with; th-o-ve.rsio.nQf ibe.NC DWQ'.
Stormwatdr B69t ManagemahtPrad i' Manual -t that.'is in place on the, date of,
Mces: . i9nua
storm -water management plan submittal: -Ak4na We d0sigins maybe approved if
the: Applicant can show that the design provides
rj-ov-ide's e-.q.u'alor�etter-�4�qu.cility
pr9te6'(i6n than the Practices specified in the 'mat . Mit.'91
.3. 0- �y In a case- V�
Y.VQ'ma , add specifiGst&myv -t .-erit�re.I.U,i�,Om.4nts.,O- - case - b'
a qT management 'tiV!ty Wil ri Violate r quality,
case bbsis�., in -order to ensure. that PtQpb.�ed-ab I V4
standards.10
4PW act DeV..6.100,merits: (,(Jibs) ihat m
.Q mayapprove Lbw,*Impc 60t,theguldar'?,e set,
A' .Guidebook -t -C
forth in the" Low Impact Development:: G d�Wokf&Ald�fh Orofin
5.. Proposed -new.developmenturidertaken: by -a local goVernment solely as -8 public.,
W' ' _ .
,road projectsha,111ollow.the recOirbm.6ntt-df DOT BMP Toolbox rather -
1__
12-
B. SUbjtplfta'l Re4uliroments, The submittal requirements. listed below ap'_ply to
only projects
that r6'4QJte n as indicated -in* the applicable Gerieral'CertificatiOag Well.
written, allthorizaf
'd do.cuin ofaft
a($ protects tbatr Isolated -ds: Permit;, -64
e.qulr&Op- 1§014te ;an. Ahy.t required e. on.shall
1Xq,septi to the Wet(Onc[4, guffers:49dStordiw ir-Cdfiniblia dA iffitiq UM at
__#0 an
I. projects "that Are Subjectlo,Arv,bther DW StOrrnwat6r,Pro. rairn'. fftfio�pr`6-cus�
: -1 � ___ I _ 9 project
subject i0another.OWQ,�.tprmwdter program,, such as. the .20.Coastal Counties, HQW;
0M or state -imp . [erriented Phase ll'RPDES, theho the bp-Pli6aritishall submit 8 cooy:Qf
.e:sf& panyimpacsoccur
ra proVal-letterbefor t on, site.13
'
projects-that�e
�b
prolect is
ru
shall
submit:
mit one set of approvetl stormwater management plan details. and calculation"s:
th
V.,
tff.. Projects Not Covered Under items .(i).or.(ii). If the protect is: not subject to. another
0 Q Stotrnwater'prpg dC.6mmunitV's-sto'rmwaterprbgratn.ithen ,itshall
bereview6d and approved '4,thaf Q through the Water Quality Gertificatibn
, EM
Odhoft-atiori process.,
8. Low.Donsity. Forfowdensity project 'the applicant shall s of th
ubmit.�Pwo, copies b
DWQ 4,6W Density SUPDlernent Form with all required ite imsip.
water-QUal , ity Certification No. 3890 40
Water Quality Certification No. 3890
b. High Density. For high density projects; the applicant shall submit two copies of a
DWQ BMP Supplement Form a , rid al . I required, bms'af the: specified scales for each
BMP that is pt6pbsed._13-
iv. Phasing. StormWator management plans mz!i. be phased on a case-by-case basis, with:
the submittal of a final stor M, ter Management plan per: Items (i) -,,(iii) above required for
the: current phase and a managementconceptual stormw I a termaria g .. mpilt plan for the future phase(s)..
0
The.stbrmwatorI5.-lan for each. -must I be approved- by the
*-b'- m
appropriate. entity 16,06re-c6hOrUctimof that-ph-psg is commenced. enqqd. The approved
st6rmwat6r management plan for 4ea . ch, f0t.ure Oba§0 must be-cbristruded and operational
before. any permanent build . lhg ot-other structure associated with that phase is
occupied.
Stormwater MatidgMent Plah Oodificationsi The ,'stQrMWpter management plan may
not; be:modified Wi ith6 t u prior 'written authorization from the entity that approved 1he plan.
I
If theprojectis. within a C er(W bo.M.M.-Unity, then the applicant applicant sha I submit one sbt.of
approved stormwatet mAffageiinopt plahidef6ils:and :.0-81C. s with documentation of
the local :g!Dvefnment'.sdpp'r-ov'al'f'orrecord keeping OrtpOsAsIfffie- project is, subject to
DWQ review, then the applicant shall su;mit two 6f_ttie, a'ppropri6te SupplemOnt
Forms per Item (iii) aboVe-fdr any Ps. thati h4vo:bft�. -r , h. M600 D-WOs review and
approval,
- .1 Mod in 1 C H.0,60
The gtormWalgr requirement for 401 application 5AISICA :0506(b}(5): and'
i
Non erosive discharge rates are required irf. SL.2,008-21 1 §2(b)(1)4 The 10 -year desp storm
lifn 15'A WA Q2H JOb8(f),(2.).'and ..11008(g)
,standard is -codified
3 15A NCAC
-30footveg6tated sftackslare required in SL 2006-246§9(d)„ S 200. 41 1
'02H 1.006(2)(c) arid. ;1007(1)(a)
!-4qpstr,uction.and,maintenance ...Of-tho-,%tQrmat.wer.
_p $Aawyto,satisfy,15A.NCAC 02H^ __r
,Conveys .,.application-,:p,ro.cedure,to,streamline the pqrtitfihoprocess and reduce: any uprieciess4ry
Aupficatroh- iinthe review rofsformw lltpldhs.
_ptermanagePe
,6 "Low density built. up -on, are.0. ffres h6 -d, _6 and SL 2008 211§2(b,)`.
I _s, are $000-, SU 9�(q)
the. itequilre"Meientfior 16Mw density development to -use veg.etat*d conveyances is codified in SL
� e AN
-torm'
--2006 '246'§9J(q),, SL -2008411§2(b}; 1:5A NCAG 02H..1006(2)( and .10_07(1)(a). T he.S . water
-BMPIM'-afiu--a'l'i's.-also-referenced in;l.5A.NCAC'O2B..0,26(4,
5 { an -0277(4)(0.).
5 removal is requiredin SL 2006 "246§9(d), SL 2,W 211 b) 15AMCAC 02H
v -requirements
The 3 /�TN'a -P'rem6 for NSW'
Q�(2.)(P)$ ISA NdAb 02H A0J07 rid"T. al
waters Are . s.etfprt�in;-1.5A.N'CAC.02B�.02,82,'15ANfO.-AC,.012.Q:.,,02."),(!),.'1.5ANCAC.02B
0265(3)(a). and 15A WCAc 02B. 6277(4)..
, - 7
ThEi.Storm,watet'BMP Manual isalso :referenced' inISANCACO28..O.'26.$..(3)(' and..0217R('e).
iQ Therequirement, for D.WQ to ensure thatvati6r-quality standards s 'O:p Otp.
-tarl. 5 rote d before issuing 8
-401.certification -.i.p-codified-in .l5-A.Nc-ACo.2H.,.'O$.06..
The Lb Toolbox isalso referenced lo: 15_A.'N1C.AC 02B ,0277(4)(g),.
12 Th,e1erm "public roadproject" is defined 0:28
'Q26
13 Conveys application procedure to streamline the permitting process_
14 ph :,Velopmon "common 'd 'M
a��ed OL I., is addressed as a �Icoh plan of- 15A NQAG Q214
eve op . ent" in.
15 Procedures for modifying.st6ftwaterpians are set.forth in 15A N-C-AC'02H .1011..
Water quality Certification: No, 3890 11