Loading...
HomeMy WebLinkAbout20160054 Ver 1_CAMA Application_20160112Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM. TO: FROM SUBJECT: Applicant: Project Location: Proposed Project: PAT MCCRORY Governor 2 0 1 6 0 0 5 4 DONALD R. VAN DER VAART Screwy January 4, 2016 Karen Higgins 401 & Buffer Permitting Unit DWR/Water Quality Permitting BRAXTON DAVIS Direnor JAN 12 2016 Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatsa)-ncdenrpov Fax: 395-3964 (Courier 04-16-33) CAMA Application Review Duke Energy Progress, LLC c% Kenneth Brooks Parcel No. 2510021, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: SIGNED This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE Nothing Compares State ofNmth Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 DIVISION OF (COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Duke Energy Progress, LLC 2. LOCATION OF PROJECT SITE: Project site is located on Caswell Beach Road (Parcel No. 251IA021) in Caswell Beach, Brunswick County. Photo Index- 2006: 8-6170 Q-18 2000: 8-77 P-18 1998: 6-117 P-3 State Plane Coordinates - X: 2286853 Y: 55148 Lat: 33°53'51.92"N Long: 78'03'16.90"W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —12/3/15 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received —10/30/15 Complete - 12/16/15 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan — Caswell Beach Land Classification From LUP - Industrial (B) AEC(s) Involved: OH- OEA (C) Water Dependent: No '(D) Intended Use: Commercial (E) Wastewater Treatment: Existing - Municipal Planned - N/A (F) Type of Structures: Existing — Metal building, microwave tower and concrete foundation Planned - Install new communication tower (G) Estimated Rate of Erosion: 2 ft./yr. Source - LTAASCR 2011 Update 7. HABITAT DESCRIPTION: [AREA] TIP Pn(W T) FTT .T .F.T) OTHER (A) Vegetated Wetlands §404 wetlands (B) Non -Vegetated Wetlands Other — High ground 2,000 sq. ft. (D) Total Area Disturbed: 2,000 sq. ft. (0.05 acres) (E) Primary Nursery Area: n/a (F) Water Classification: SB Open: No 8. PROJECT SUMMARY: The applicant proposes to construct an80 ft. self -supported communication tower with associated concrete and fencing. Page Two 9. PROJECT DESCRIPTION The project site is located on Caswell Beach Road (Parcel No. 2511A021)) in Caswell Beach, NC. The project area is located near the Atlantic Ocean, within the Town of Caswell Beach, in Brunswick County. To find the project site, travel south on US Highway 17 to NC Highway 133 South. Travel approximately 22 miles south on NC -133 to Dosher Cutoff SE/ NC- I33.Turn onto Dosher Cutoff and then turn right at Southport -Supply Rd. SE/ NC -133. Travel approximately 0.8 mile andfurn left onto NC -133. Travel on NC -133 to the Oak Island Island bridge and continue straight to Caswell Beach through the stoplight. Travel approximately 1.5 miles to the subject property which will be on the left. There is a locked:gate at the entrance, contact Mr. Dale Brooks for access (704-868-6302). The lot has a total area of approximately 207 acres, but the project area is directly adjacent to Caswell Beach Road in the Ocean Erodible AEC. The project site area is vegetated primarily with domestic grasses and shrubs. The site is the Caswell Beach pumping station for Duke -Energy Progress, LLC and consists of an Ocean Discharge Pump Structure, the Caswell Beach Power Electrical Switch gear and Control House and the Caswell Beach Substation. According to the applicant, the property has an approximate elevation of 9 feet above mean sea level. The static line is located approximately 335 ft. oceanward of the proposed tower location. The property has a perimeter fence around an existing metal building and meteorological equipment tower (MET) tower with concrete foundation. The long term erosion rate for this portion of Oak Island is 2 feet per year. The 100 -year storm recession line for this area is 300 feet, creating a total Ocean Erodible AEC of 420 feet. The proposed communication tower is within the Ocean Erodible Area of Environmental Concern (AEC). Setbacks in this portion of Caswell beach are measured from a static or fixed. vegetation line, unless the actual first line of stable, natural vegetation is more restrictive. This static vegetation line represents the first line of stable, natural vegetation that existed prior to the large-scale spoil deposition project. The vegetation line used for Oak Island is based on the 1998 vegetation line, as described in NCAC 07H .0305(a)(6). The actual first line of stable, natural vegetation is located oceanward of the surveyed static vegetation line. The waters of the Atlantic Ocean in the vicinity of the project area are classified SB by the North Carolina Division of Water Resources. The area is not designated as a Primary Nursery area by the North Carolina Division of Marine Fisheries. PROPOSED PROJECT: The applicant proposes to construct an 80 ft. self -supported communication tower with associated concrete and fencing near the existing MET tower (see sheets C-1— C-4). The total proposed impervious area is 200 sq. ft. According to the applicant, approximately 2000 sq. ft. of high ground will be disturbed for construction. The application states that the existing communication tower will remain in place to collect data for the next year: 10. ANTICIPATED IMPACTS: The project would result in covering approximately 200 sq. ft. of high ground with impervious surface and disturbing approximately 2,000 sq. ft. of high ground with grading and fill. According to the applicant, the development would result in .0001 % of built -upon area on the entire tract. The proposed development would be located within the Ocean Erodible AEC landward of the applicable development setback. Submitted by: Tara MacPherson Date: December 319 2015 Office: Wilmington Parcel Information from Brunswick County RECEIVED DCM WILMINGTON, NC DEC 1A32Ol5 Brunswick MW Tower Replacement Project Charter 1,1 Project Overview. Replacement of the existing microwave radio system between Brunswick Plant and Caswell Beach Pumping Station. This project will include a new microwave tower to be located near the existing. BN,P Met Tower. A new tower at Caswell Beach will be constructed and the existing tower taken down. The existing tower at the Brunswick Plant will continue to stand for one year after the construction of the new tower. The existing tower has metoralogi.cial equipment located on it that will continue to collect data for the next year. Background. The Caswell Beach Pumping Station consists of an Ocean Discharge Pump Structure, the Caswell Beach Power Electrical Switchgear and Control House and the Caswell Beach Substation. Communication to Caswell Beach consists of a microwave radio unit with equipment mounted on a tower at the pumping station and on a tower at the meteorological equipment tower (MET) station at the site. The receiver at the pumping station is connected to an analog channel bank multiplexor (MUX) from which a four wire circuit extends to the pump cabinets for supervisory control. The existing Microwave Radio System and Transport Equipment is obsolete. Some replacement parts are no longer available, and the prolonged exposure to salt air has resulted in significant corrosion for most of the radio equipment. The radio and tranport system needs to be replaced with the Duke system standard for microwave radio systems with digital MUX boxes. Both towers have been reviewed structurally and are considered overload. 1,1 Project Goals and Objectives. _�FY\��xt.':'S �,a Y�.t.-_ ss...vh ax? K� � c � „..F2_ . �__ •i3?s�..� 4 a...x...7. � : _' : �. �:4.T,.� $ .. E�-%.h",: .. 'S'r"� n. �" _ 6:F. .......u. 1L .. ; AE .�{.;. ..\4: ti�?v\ - ::F.. F,.: o Improve tower o Construct new 80' self support tower at Caswell Beach infastructure © Take down existing towers ® Update radio system o Remove old radios at BNP and Caswell Beach and replace with the current Duke Energy system standard for microwave radio systems © Replace existing dish antennas with the current Duke Energy system standard for microwave radio systems 12/1/2015 Duke Energy Proprietary Page 3 of 6 Brunswick MW Tower Replacement Project Charter 1.2 Project Assumptions -and Constrraiintss — ..;5* Existing MET tower will not be taken down as part of this project Meterlogical equipment will not be moved from the exisiting MET tower as part of this project o Nuclear Engineering Change will be approved by BNP to start construction of new towers Securing FAA/FCC approvals and other juris.dicational and environmental permit Availability of resources to complete project. (Contractor, material and internal.) Burnswick plant outage scheduled for 2/27/2016 — 3/23/2016 0 2.1 In Sdope Design and Installation of a new 360' guy tower near the existing MET tower located at the Brunswick Nuclear Plant Design and Installation of a new 80' self support tower at the Caswell Beach pumping station. Design and Installation of a 9500 MPR radio system at both Caswell Beach and BNP locations Removal of old microwave equipment at both Caswell Beach and BNP locations Install new microwave dish antenna and associated cables and brackets at both Caswell Beach and BNP Configure, connect, trun up and test new microwave radio system Relocated other telecom antennas and associated equipment for the existing MET tower to the new 360' tower at BNP 2.2 Findings Tower Engineering Professionals (TEP) was contracted to perform this work and it resulted in the following: 0 Both Towers are overloaded Caswell Beach is 118.8% overloaded but can be corrected by adding reinforcement U Brunswick MW is 198.8% overloaded and must be replaced G Contributing factors are the move to a solid dish design and a more stringent building codeR. y... }_M u ��.1 12/1/2015 Duke Energy Proprietary oage,4 of 6 Brunswick MW Tower Replacement Project Charter 2.3 Systems 2.4 Alternatives Considered Alternative Considered Ntl:�i Upgrade towers instead of replacing U ^. 11/21/14 s.1 iy . , N f, r���i 2/13/15 Build Stage 5/1/15 MW — BNP to Caswell Beach Pumpin Station 5/4/15 Deploy Stage M10. 6 MW BNP to Prospect Duke Corporate Voice & Data 0 — Network 900 MHz Trunked Radio System Wide Area - Dispatch Radio System .Fs Siren Controller 450 Siren System Voice communications for EP in and EP Repeater IBM around plant f� Paging VHF (Supports Plant) Paging of plant employees Meteorological Hardware (NOT Weather - regulatory requirements RADIO SERVICE) 2.4 Alternatives Considered Alternative Considered Comments Upgrade towers instead of replacing Little documentation is on file regarding the foundations of the towers to make accurate up rade recommendations 11/21/14 Design Stage 3.0 1 Milestone/Gate Schedule RE:CEiV uCM WILMINGTON, A1C; DEC 1 06 2015 12/1/2015 Duke Energy Proprietary Page 5 of 6 Plan Stage 4/11/14 Analyze Stage 11/21/14 Design Stage 2/13/15 Build Stage 5/1/15 Test Stage 5/4/15 Deploy Stage 5/4/15 Close Sta a 12/31/15 RE:CEiV uCM WILMINGTON, A1C; DEC 1 06 2015 12/1/2015 Duke Energy Proprietary Page 5 of 6 1fliFPLIGATIoN -for Fort� hAP 1 (Page 3 of 4} m,DG a}pr C7eveiopment Permit []Yes; ®M1io m (i}' Are thele wetlands on the'sita? []Yes. OW (ii) Are.ihere coastal wetlands.on the site_ ? (iii)df yenta either (t) -or above, has a delinea#ion been cAnducted [1Yes omo . (Aftdchdocutr+erriatrvn,ffaya�7able), n Describe existing vgastewatertreatmerrtfacildies; city o camell': a. ,Describe existing driri>ung uvat2r suppiy-source. Town of Caswell; Beach . p i)'escr>be. ewsbng §tomo water,management-ortreatmQnf systems. - NA a'- d li a_ Utifli the project tae fol commeYciai publlei or private uses IDCpO mmerciai �RubliclGouemmerrt ®. rnatelGommun�ty fon ou ' one, use.; and dal o eratiansaf the:pra�ectwhen Complete b. Gve:a brief descnpfl p rp P Sfl faot'Communieations lower for :Brtanswick tiaclearlcrowave site Resenbe the proposed construction rnethodaiagy Types of construction equiprnomtot a users funng construetion;`the number of eacfi type' e. of equipment.arid v!Ihere or@d 1='crane_td be stored on site ' d. List all tleveiopment act<vrties;you �"ropose ' e. ,4Ye the proposed activities maintenance of an ecisbng peotect, now work, or"both? Gonstruct«on ofinetat ttiv�er .' f. What is tiie approximate fatal disturbed land aYea *u" from,the proposed protect? 2044 .sgft ®S.q• aY [(Acres g. Will the proposed prosect encroach i&n'any puti(o easement, public accessri ay or other area. =jYes : i�Na. 1]NA .fhat,the public has; estabfcshed use of? li. Descries location and type of existing -and proposed discharbes io!nta#ers of the state: , 'none i..Wiil wastewater or s#onnwater be discharged in#o a wetia€rd? (]Yes �Ho ❑#drA if yes; will this discharged wa#erbg ofithe same saUnrty>as.#he recennng water? Oyes' ®NoiVA . j. 1s there -any mi#igatian propesed? . .' '_ Yes o L7Ye nisi CIA . Ff yes,'aftacfi a rnttigation proposal:.. .. GFOlrrrt t ontinUeS CAtI back 4E § IV 1N a. i C. - "�"T:-''s'r^:3a2r •sa'd a0i%,a ` qJt£ O y`4 C 1 2015 !n addifion to this camplpeed appitcation form (MP '1) the folTofa+rng rtetns 6eTow� rf appUaaFile must a su m rn o o _ ;3aokage to be complete items (p% (f% are a�nrays apprcabletcs anymaldr deVelopmantapp6cahon Please carTsult fhe applrcafion rnslrc►ctran bookTef on hoi�z fa properly prepare the regvrred items tie(ai sr b. An aceura#e; dated work pkat {including frlan view and cross sectional drawings) drawn.to scale:.. Please giVe the pmserit status of the proposed:project. "Is,any portion already complete? if p' reviousiy'authbnzed wiork, clea(iy"indica4e on maps plats; drawrngs:fo distinguish. 6etwean.work coriipleted 'and proposed ; c A §rte or tocabon map that is suf6aengty detailed to guide ageitcy.pwsonnel unfamdiar_wzthh the area to the sYie . d. A'copy of th'e deed (with siateapp4rction only) or other instrument undec vahh"sch the applicant"claims title to;the affected propestses e. The appropriate application fee Check or money order made"payable to DEPlR. €. A list of the names and complete addresses of this adlacentmaterfront (riparian) landowners and?sgned"return receipts as proof that such: oirmers have received a copy of the application;and plats.ky ceriifred, marl. -Such landowners must ba advised that they have;3Q days {n. winch to submit comments on t#re pzropused projeci"ta the pivision of GoastaiiVlahagernent. `Name Town of Easwelt Beach Phone No - Address 13tT0 CaselF Beach ltd Caswell Beach, NC2�465 _ _ Name "Guy R Deacarluecr " - 'Phone`No Address,55fl5"Orchard Hril.Dr Raleigfi; NC 276.13 , Name Qcaangrseis HCA Friona Na 4ddress PO Box 335 Oak tslar�d� t1lC!213465 -; - __ g,A list of previous state or federal permits issued for work ori i{te project Tract. include permrt numbers perrinittee, artdzssuIng dales. NEPA, SHPOandTH .0 Notreceived . ":Duke Energy Progress LLG h" Signed consuiiant or`agen%aesthonzation form, r€appheab{e, i Wetland detineatlont necessary !Asignsd",4EC hazard notice forpro)ects in oceariiiont"and inletareas. (AAusfbesrgned bMopeefy owner) k A statement of compliance with tt ieAC. Errvzranrnental PolrcyAbt (N C G S.:193A 1 1 Bj if necessary- {f the project invokes'expeijoore ragrnental ofpub{fa funds or use of public lands attach a sfaternenYdocumeniing compliance wiiti the Nortfi Carolina EnviP�ticy Act... `. t�a�&aatac�e��a� �er��dt;��a�r ops l unclersiariditiat any permit Issued in response to #hiS appitcaticn will allow.only the development deson6ed m the application, The"pro)ect.wrll ISe"sub)eGto^the corrcli'trons and resiiiciioris contained Tri the•permit 1 `certify That 1. aim, to=grant, and tlo in favi grant permission ta�representafives'af stale and fedal al review agencies to enter an the aforerrienfioned lands nod `with eyaluking' irriortnahon' related la this perm -It appjlcation grid fotloW-clp Mori to - :' of the project I furthar per`fil 'thatthe inforruation provldeclIn this appllcation�is;irut}iful to Ah `my IQiowledgs. " Date 71-18-2iJ15 Ptlnf Name "_Dale Brooks_ Signature Please intlieate apgleatronttachmerrts periarfing to'your proposed pro)ecf,. ®QCM IViP 2 Excavafion.arid Filldrifortilafiori DOOM MP=B* Udgesand Cdlverts ®DCM IVIP-3 Upland Davelopment; _ pDCM. MP 4 Strucfittres itnfi riiiMon' - ' DCIM 11V l �.IVi l NG u �; {',I .b 2015 ....52-8Olin':- 20S- 1.883 4ii'+C'6 AS11:i L"_P'•,iii.nic.c'­lsl_'.'r"s. �€ba;A n a �J', 5F',,-ril r, all .. Form Oct RIP U L NP: L.' (C.Qz�ttmctiout and/aw a Attanh 'ihjs form<to Join€ Applica#ton toe CAMA "Majcir Perrhit, Form`.bbM 0 1. da sure to:eoniplefe" al! outer sections o#the Joint ApphcaUon that e(ateto;thls proposed project ..Please include supplemenfaf information: " %E�d��1� DE�EC a Type antl number of buildings, facild�es, "unds or shuctures '. b Numger of'lots orparcelS..,.:. ,proposed is c i3esdy (give`the number of resdetrtra! unds anrt:the unds "per d Sae of area to be graded, filled qr disttcrbed Encfding roads; - were) dh6hes, etc 20047' f#" e !f the proposV d prolec€`wil! dlsturtr more than one acre of land the f LJst the ma#elrals (such as Cnati, paver'stone, asphalt, or concrete) - L3wisfon of land Resources mustrecetve'an erosrot and tube usedfior impervous.surFaces sedimentation control plan at least 30 days befgre land-disturt�rng Concrete activity begins . ft)' "If applicable izas a sedimentatron and;erosEott centro! plan been subrnitted to the: P vlsian ofUn-d Resources? oyes ' EI ®iUA f7lf.yes; lisfith&A" .submdted g Give tL.he percentage of the tragtwithm the' coastal shoreline ASC to..: h: Proleots thaf require a CAMA-tVlalor DeyelapnienfiPermit may also be covered by impervious and7orbuilt-upon surtaces; such as .- ':, . reju�re a Stormwater Gert�fcat(an pavement building rooftops, orae be used for vehicular driveways :" or jsarking (i) ;Has a Q development plait been. submided-to the 4lvision.0 " _.: ate 1 �rArevi ewr __. . Give the percentage ofthe entire; tract to tie eouered by irtlpt {utous. ' - (iij it yes, list the date:submdted and/or butt upon"surfaces such:as pavement,,buiI'd n9 rooftops, or ta'be usbd for vehiaylar dmreways"or parking . ,:. D47€?1 1 Descnbe proposed method of sevrage disposal.:; ; Ic. Have the faerldiesi descnbed t r ttem (�) received state or focal Town of Caswell :. approval?. ' if'jes, attaet approp¢iate documerdafion. I OesenbLL e kocat on and ;type of proposed discharges fo watem of the' : m s aes the proposetl project inch d`e"an innovative stormwater state (e g , surface runoff sanitary wastewa#er, industnal/ ' ` design? commercial eftiuent °wash down" and residential discharges): [lyes 0 df yes arta n. cti apporopriate docymentafio REC l D ' l W11MiNGT0 . .rpvbq�--d. X2Pii�J2e`V.., /�9y y. YtiS'"`^�b$9ta ..xx 12/2"6 I LTJ 1 FI 11 NO 11 Mr)T9=C. 1. This plan was prepared without the benefit of a report of title. 2. This plan does not represent an ALTA/ACSM Land Title survey. 3. The basis of the bearings and coordinates. for this plan is the North Carolina State Plane Coordinate System, North American Datum (NCSPCS/NAD 83) based on differential GPS observations performed on January 8, 2015 and tied to the National CORS system via the OPUS utility and expressed in US Survey Feet. 4. Vertical information shown, based on the North American Vertical Datum of 1988 (NAVD '88) in US Survey Feet. 5. Property lines are drawn from monumentation found at property corners and information found in Deed Book 308, Page 988, & Deed Book 348, Page 497 of the Brunswick County Register of Deeds records. 6. All distances are ground unless otherwise noted. 7. This property is located in flood zone "AE", areas determined to be inside 1% chance of annual flood. (FEMA Community Panel # 3720208500J, effective June 02, 2006). 8. Property Information: Duke Energy Progress INC. Caswell Beach Road Caswell Beach, NC 28465 II 1A CERTIFICATE II LATITUDE: N 33° 53'51.440" (NAD ' 27) LONGITUDE: W 78° 03'19.862" (NAD ' 27) LATITUDE: N 33° 53'52.067" (NAD'83) LONGITUDE: W 78° 03'18.830" (NAD'83) GROUND ELEV. (AMSL): 113± (NAVD '88) SffE SURVEY SCALE: 1" = 200' LEGEND CURVE It PROPERTY LINE v ® m ADJOINERS PROPERTY LINE CHORD (NOT SURVEYED) CQh EXISTING UTILITY POLE ®T EXISTING TELCO PEDESTAL 0° IRF Yz" IRON REBAR (FOUND) O° IRS )z" IRON REBAR (SET) O IPF 1" IRON PIPE (FOUND) 6 GUY GUY (ANCHOR) - ®ECM EXISTING CONCRETE S78'21'28"E MONUMENT L7(TIE) PROPERTY CORNER ° O (CALCULATED) �7- EDGE OF PAVEMENT ---OHW--- OVERHEAD WIRE ---R/W--- RIGHT-OF-WAY X - CHAIN LINK FENCE �^ EXISTING TREE LINE I n EXISTING UTILITY EASEMENT N 64'15'07"W 154.05' MAGNETIC DECLINATI 09'08' CURVE TABLE CURVE It LENGTH RADIUS DELTA CHORD BEARING C1 415.22' 1560.40' 015'14'47" 414.00' N71'09'01"W CONVERGENCE ANGLE +0'32'43.05" DUKE ENERGY PROGRESS INC LINE TABLE PARCEL 251IA021 0 DB 3411 PC 478 of DB 308 PC 988 v EXISTING POND SEE INSET A .CENTERLINE PROPOSED TOWER-' N 55,158.40 c 'E 2 286,739.67 EXISTING TOWERNAD Ba - .mak; ER i X V .EXISTING FENCE - -> �-¢sa.•i�, }� �$��� �� ly�PROPOSED FENCE` INSET A A OF DEED, RLAP,'\ 31422 PG 702 & DB 30 N THE TOWN OF CASWELL ice ' PARCEL 251 NAO5 PC I I N/F STATE OF NORTH CAROLINA 0 CASWELL BEACH COAST GUARD STATION PARCEL 251GAOOI DB 918 PG 279 / 9 DB 1422 BUILDING �\\ TYP. ✓� a S7871'4p"E v o W\� N78•5 �.. NF 120"ry . • • TOWN OF CASWELL BEACZ PARCEL 25fIAO2105 _ _ CAS�eL� UEFA _ R/W _ 935.04 DB2952 =C 1197 X60 p (je ROAD k1c W) 0VCSR 1100 R/W _ J R/W _ IRF SOUTH 11'44'40" WEST A DISTANCE OF 0.95 FT. FROM DEED CORNER N/F LINE TABLE LINE # BEARING DISTANCE L1 N13'27'07"W 82.19' L2 N08'40'01"W 16.93' L3 N77'58'12"W 67.16' L4 St 1'44'40"W -75.57' L5 S11'44'40"W 15.00' L6(TIE) S78'21'28"E 9.17' L7(TIE) S78'15'20"E 55.00' L8(TIE) S78 -15'20"E 110.00' I I N/F STATE OF NORTH CAROLINA 0 CASWELL BEACH COAST GUARD STATION PARCEL 251GAOOI DB 918 PG 279 / 9 DB 1422 BUILDING �\\ TYP. ✓� a S7871'4p"E v o W\� N78•5 �.. NF 120"ry . • • TOWN OF CASWELL BEACZ PARCEL 25fIAO2105 _ _ CAS�eL� UEFA _ R/W _ 935.04 DB2952 =C 1197 X60 p (je ROAD k1c W) 0VCSR 1100 R/W _ J R/W _ IRF SOUTH 11'44'40" WEST A DISTANCE OF 0.95 FT. FROM DEED CORNER N/F PREPARED' FOR: dei E. DUK E N ERGY. 410 S. WILMINGTON STREET RALEIGH, NC 27601 (919) 546-4545 PROJECT INFORMATION: I CASWELL BEACH INC -1014 I CASWELL BEACH ROAD I CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PREPARED BY. { TOWER ENGINEERING PROFESSIONALS q 326 TRYON ROAD RALEIGH, NC 27603-5263 (919) 661-6351 NC LICENSE NO. C-1194 SURVEYOR CERTIFICATE "I, CLIFFORD C. BYRD, CERTIFY THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION, (DEED DESCRIPTION RECORDED IN BOOK 1422 AT PAGE 702; THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED AS BROKEN LINES, DRAWN FROM INFORMATION FOUND IN BOOK AND PAGE AS REFERENCED HEREIN; THAT RATIO OF PRECISION OR POSITIONAL ACCURACY IS 1: 10,000 OR GREATER; THAT THIS MAP MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA (21 NCAC 56. 1600.)". THIS 6TH DAY OF FEBRUARY, 2015. SEAL NORTH CAROLINA PLS # L-3782 CLIFFORD C. BYRD CARO'//��� • Q. SEAL 9P'-„ • L-3782 g' i y �. ��C? 'SU04 4 S rn 20.15 RF SHEET TITLE: N L5 270.92' N ' I 17875'20"W RF RRFL8 MME SURVEY L 7 IRF 0 200 400 -- DATE: 2/G/2015 REVISION: C SCALE IN FEET SHEET #: I OF I TEP #: 31862 DUKE ENERGY PROGRESS INC PARCEL 25IIA02101 DB 3411 PC 478 L3 1140.83' RF PREPARED' FOR: dei E. DUK E N ERGY. 410 S. WILMINGTON STREET RALEIGH, NC 27601 (919) 546-4545 PROJECT INFORMATION: I CASWELL BEACH INC -1014 I CASWELL BEACH ROAD I CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PREPARED BY. { TOWER ENGINEERING PROFESSIONALS q 326 TRYON ROAD RALEIGH, NC 27603-5263 (919) 661-6351 NC LICENSE NO. C-1194 SURVEYOR CERTIFICATE "I, CLIFFORD C. BYRD, CERTIFY THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION, (DEED DESCRIPTION RECORDED IN BOOK 1422 AT PAGE 702; THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED AS BROKEN LINES, DRAWN FROM INFORMATION FOUND IN BOOK AND PAGE AS REFERENCED HEREIN; THAT RATIO OF PRECISION OR POSITIONAL ACCURACY IS 1: 10,000 OR GREATER; THAT THIS MAP MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA (21 NCAC 56. 1600.)". THIS 6TH DAY OF FEBRUARY, 2015. SEAL NORTH CAROLINA PLS # L-3782 CLIFFORD C. BYRD CARO'//��� • Q. SEAL 9P'-„ • L-3782 g' i y �. ��C? 'SU04 4 S rn 20.15 RF SHEET TITLE: N L5 270.92' N ' I 17875'20"W RF RRFL8 MME SURVEY L 7 IRF 0 200 400 -- DATE: 2/G/2015 REVISION: C SCALE IN FEET SHEET #: I OF I TEP #: 31862 T-- zzamm SITE NAME: CASWELL BEACH NC -1014 PROJECT DESCRIPTION: PROPOSED WIRELESS TELECOMMUNICATIONS FACILITY TOWER TYPE: 80' SELF-SUPPORT SITE ADDRESS: CASWELL BEACH RD CASWELL BEACH, WC 28465 (BRUNSWICK COUNTY) JURISDICTION: BRUNSWICK COUNTY DISTURBED AREA: N/A PRESENT. TELECOMMUNICATIONS OCCUPANCY TYPE: FACILITY CURRENT ZONING: C -BC PIN 251 IA021 DUKE ENE SITE NAME. CASWELL BEACH MC -1014 CASWELL BEACH RD' BEACH, NC 28465 1 PLANS PREPARED BY. R. All 0111 ME IN E TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661-6351 www.teogroup.net N.C. LICENSE# C-1 794 PROJECT WFORMATM 5 10-19-15 CONSTRUCTION. 4 07-1 G- 15 CONSTRUCTION LATITUDE N 3 53' 52.067" LONGITUDE W78*03'18.829" GROUND ELEV. (AMSC) 9'± 3 06-10-15 CON5TRUCTION 2 105-11-15 00% I 10-I6-15 PRELIMINARY 0 02-05-15 PRELIMINARYCASWELL REV DATE ISSUED FOR: TOWER COORDINATES DRAWN BY. JTC ECKED BY: JAS ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN SITE PROJECT MANAGER: INC.ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES NAME: DUKE ENERGY PROGRESS AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHING IN THESE ADDRESS:, 200 LUCENT LANE PLANS Is TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THE CITY, STATE, ZIP: CARY, NC.27518 LATEST EDITIONS OF THE FOLLOWING: CONTACT: WILL ROBERTS, P.E. 1. NORTH CAROLINA BUILDING CODE 4. 2012 NCEC PHONE: (919) 546-2679 (2012 EDITION) (NEC 2011 &ADDENDUM) 2. NORTH CAROLINA CODE COUNCIL 5. LOCAL BUILDING CODE SITE APPLICANT: 3. ANSIMA-222-G-2-2009 6. CITY[COUNTY ORDINANCES NAME: DUKE ENERGY PROGRESS INC. ADDRESS: 200 LUCENT LANE CODE COMPUANCE CITY, STATE, ZIP: CARY, NC 27518 CONTACT: WILL ROBERTS, P.E. PHONE: (919) 546-2679 SURVEYOR: NAME: TOWER ENGINEERING PROFESSIONALS ADDRESS: 326 TRYON ROAD CITY, STATE, ZIP: RALEIGH, NC 27603 CONTACT: CLIFFORD C. BYRD, P.L.S. PHONE- (919) 661-6351 CIVIL ENGINEER: NAME: TOWER ENGINEERING PROFESSIONALS ADDRESS: 326 TRYON ROAD CITY STATE, ZIP: RALEIGH, NC 27603 CONTACT: KIMBERLY S. MARTIN, P.E. PHONE: (919) 661-6351 ELECTRICAL ENGINEER: NAME: TOWER ENGINEERING PROFESSIONALS ADDRESS: 326 TRYON ROAD UTILITIES: CITY, STATE, ZIP: RALEIGH, NC 27603 POWER COMPANY: DUKE ENERGY MARKS. QUAKENBUSH, P.E. PHONE: (919) 661-6351 CONTACT: BOB MARCKESE I PHONE: (910) 457-3318 METER # NEAR SITE: UNKNOWN - PROPERTY OWNER: NAME: DUKE ENERGY PROGRESS INC. TELEPHONE COMPANY: AT&T ADDRESS: 200 LUCENT LANE CONTACT: CUSTOMER SERVICE CITY, STATE, ZIP: CARY, NC 27518 PHONE: (88 757-6500 0 (91� CONTACT: WILL ROBERTS, P.E. PHONE # NEAR SITE: 278-5644 I PHONE: (910) 457-3318 PEDESTAL# NEAR SITE: UNKNOWN SHEET DESCRIPTION REV SEAL: 00 1 og , octo6erl9, 2015 rA, -0 M TI TITLE SHEET 6 Ni GENERAL NOTES -4 cl SITE PLAN 5, C2, COMPOUND DETAIL 3 C3 TOWER ELEVATION 3 C4 FENCE DETAILS 4 Ell ELECTR[CAL NOTES 3 E2 GROUNDING PLAN AND NOTES 3 E3 GROUNDING DETAILS 1 3 E4 GROUNDING DETAILS U- 3 1 SEAL: IF, -t- ol lzz Octo5arl9, 2015 LOCAMN MAP N FROM RALEIGH, NG: TAKE I -40E TOWARD LELAND. FOLLOW FOR -117 MILES. TAKE EXIT 416A TOWARD TOPSAIL ISLAND. FOLLOW ROAD FOR -8 MILES. TAKE EXIT 14 FOR US -17S. FOLLOW ROAD FOR -6 MILES. TAKE EXIT FOR NC -133S TOWARD SOUTHPORT. TURN LEFT ONTO VILLAGE KUAU NE. FOLLOW ROAD FOR -23 MILES. DESTINATION WILL BE ON THE LEFT, F'%d'4,;J 1A10 i r SHEET NUMBER: REVISION: T .1 TEP #: 31862 Lj t! 1, ®RIVING D � �RE C �Tl 0 N s CONTACT NFORMATION MEX OF SHEETS 1, ALL REFERENCES MADE TO OWNER IN THESE DOCUMENTS SHALL BE CONSIDERED DUKE ENERGY OR IT'S DESIGNATED REPRESENTATIVE. 2. ALL WORK PRESENTED ON THESE DRAWINGS MUST BE COMPLETED BY THE CONTRACTOR UNLESS NOTED OTHERWISE, THE CONTRACTOR MUST HAVE CONSIDERABLE EXPERIENCE IN PERFORMANCE OF WORK SIMILAR TO THAT DESCRIBED HEREIN. BY ACCEPTANCE OF THIS ASSIGNMENT, THE CONTRACTOR IS ATTESTING THAT HE DOES HAVE SUFFICIENT EXPERIENCE AND ABILITY, THAT HE IS KNOWLEDGEABLE OF THE WORK TO BE PERFORMED AND THAT HE IS PROPERLY LICENSED AND PROPERLY REGISTERED TO DO THIS WORK IN THE STATE OF NORTH CAROLINA. 3. THE STRUCTURE SHALL BE DESIGNED IN ACCORDANCE WITH ANSI/TIA-222—G-2-2009. THIS CONFORMS TO THE REQUIREMENTS OF THE NORTH CAROLINA BUILDING CODE, 2012 EDITION. 4. WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE NORTH CAROLINA BUILDING CODE, 2012 EDITION. 5. UNLESS SHOWN OR NOTED OTHERWISE ON THE CONTRACT DRAWINGS, OR IN THE SPECIFICATIONS, THE FOLLOWING NOTES SHALL APPLY TO THE MATERIALS LISTED HEREIN, AND TO THE PROCEDURES TO BE USED ON THIS PROJECT. 6. ALL HARDWARE ASSEMBLY MANUFACTURER'S INSTRUCTIONS SHALL BE FOLLOWED EXACTLY AND SHALL SUPERSEDE ANY CONFLICTING NOTES ENCLOSED HEREIN. 7, IT IS'THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE STRUCTURE AND IT'S COMPONENT PARTS DURING ERECTION AND/OR FIELD MODIFICATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO, THE ADDITION OF TEMPORARY BRACING, GUYS OR TIE DOWNS THAT MAY BE NECESSARY. SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR AFTER THE COMPLETION OF THE PROJECT. B. ALL DIMENSIONS, ELEVATIONS, AND EXISTING CONDITIONS SHOWN ON THE DRAWINGS SHALL BE. FIELD VERIFIED BY THE CONTRACTOR PRIOR TO BEGINNING ANY MATERIALS ORDERING, FABRICATION OR CONSTRUCTION WORK ON THIS PROJECT. CONTRACTOR SHALL NOT SCALE CONTRACT DRAWINGS IN LIEU OF FIELD VERIFICATION. ANY DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND THE OWNER'S ENGINEER. THE DISCREPANCIES MUST BE RESOLVED BEFORE THE CONTRACTOR IS TO PROCEED WITH THE WORK. THE CONTRACT DOCUMENTS DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES. OBSERVATION VISITS TO THE SITE. BY THE OWNER AND/OR THE ENGINEER SHALL NOT INCLUDE INSPECTION OF THE PROTECTIVE MEASURES OR THE PROCEDURES. 9. ALL MATERIALS AND EQUIPMENT FURNISHED SHALL BE NEW AND OF GOOD QUALITY, FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANY AND ALL SUBSTITUTIONS MUST BE PROPERLY APPROVED AND AUTHORIZED IN WRITING BY THE OWNER AND ENGINEER PRIOR TO INSTALLATION. THE CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF THE MATERIALS AND EQUIPMENT BEING SUBSTITUTED. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR INSURING THAT THIS PROJECT AND RELATED WORK- COMPLIES WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL SAFETY CODES AND REGULATIONS GOVERNING THIS WORK. RENTAL CHARGES, SAFETY, PROTECTION AND MAINTENANCE OF RENTED EQUIPMENT SHALL BE THE . CONTRACTOR'S RESPONSIBILITY. . 11. ACCESS TO THE PROPOSED WORK SITE MAY BE RESTRICTED. THE CONTRACTOR SHALL COORDINATE INTENDED CONSTRUCTION ACTIVITY, INCLUDING WORK SCHEDULE AND MATERIALS ACCESS, WITH THE CARRIER PROJECT MANAGER. 12. BILL OF MATERIALS AND. PART NUMBERS LISTED ON CONSTRUCTION DRAWINGS ARE INTENDED TO AID CONTRACTOR/OWNER. CONTRACTOR/OWNER SHALL VERIFY PARTS AND QUANTITIES WITH MANUFACTURER PRIOR TO BIDDING AND/OR ORDERING MATERIALS. 13. ALL PERMITS THAT MUST BE OBTAINED ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR WILL BE RESPONSIBLE FOR ABIDING BY ALL CONDITIONS AND REQUIREMENTS OF THE PERMITS. 14. 24 HOURS PRIOR TO THE BEGINNING OF ANY CONSTRUCTION, THE CONTRACTOR MUST NOTIFY THE APPLICABLE JURISDICTIONAL (STATE, COUNTY OR CITY) ENGINEER. 15. EXCAVATION AND BACKFILL SHALL BE IN ACCORDANCE WITH MNT—NGGC-0024 AND OE&RC-0037. 16. THE CONTRACTOR IS REQUIRED TO MAINTAIN ALL PIPES, DITCHES, AND OTHER DRAINAGE STRUCTURES FREE FROM OBSTRUCTION UNTIL WORK IS ACCEPTED .BY THE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED BY FAILURE TO MAINTAIN DRAINAGE STRUCTURE IN OPERABLE CONDITION. 17. THE OWNER SHALL HAVE A SET OF APPROVED PLANS AVAILABLE AT THE SITE AT ALL TIMES WHILE WORK IS BEING PERFORMED. A DESIGNATED RESPONSIBLE EMPLOYEE SHALL BE AVAILABLE FOR CONTACT BY GOVERNING AGENCY INSPECTORS. 18. ANY BUILDINGSONTHIS SITE ARE INTENDED TO SHELTER EQUIPMENT WHICH WILL ONLY BE PERIODICALLY MAINTAINED AND ARE NOT INTENDED FOR HUMAN OCCUPANCY. 19. TEMPORARY FACILITIES FOR PROTECTION OF TOOLS AND EQUIPMENT SHALL CONFORM TO LOCAL REGULATIONS AND SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 20. THE CONTRACTOR AND ITS SUBCONTRACTORS SHALL CARRY LIABILITY INSURANCE IN THE AMOUNTS AND FORM IN ACCORDANCE WITH CARRIER SPECIFICATIONS. CERTIFICATES DEMONSTRATING PROOF OF COVERAGE SHALL BE PROVIDED TO CARRIER PRIOR TO THE START OF THE WORK ON THE PROJECT. 21, THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITY SERVICES TO VERIFY LOCATIONS OF EXISTING UTILITIES AND REQUIREMENTS FOR NEW UTILITY CONNECTIONS PRIOR TO EXCAVATING. 22. THE CONTRACTOR SHALL MAIN•TAIN.THE JOB CLEAR OF TRASH AND DEBRIS. ALL WASTE MATERIALS SHALL BE REMOVED FROM THE SITE PRIOR TO SUBSTANTIAL COMPLETION AND PRIOR TO FINAL ACCEPTANCE. THE CONTRACTOR SHALL FURNISH ONE 55 GALLON BARREL, AND TRASH BAGS, AND SHALL REMOVE TRASH, DEBRIS, ETC., ON A DAILY BASIS. 23. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL CONDITIONS PRIOR TO SUBMITTING HIS PROPOSAL. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THESE DRAWINGS WITH THOSE AT THE SITE. ANY VARIATION WHICH REQUIRES PHYSICAL CHANGE SHALL BE BROUGHT TO THE ATTENTION OF THE DUKE ENERGY PROJECT ENGINEER FOR FACILITIES/CONSTRUCTION. 24, THE CONTRACTOR SHALL GUARANTEE THE WORK PERFORMED ON THE PROJECT BY THE CONTRACTOR AND ANY OR .ALL OF THE SUBCONTRACTORS WHO PERFORMED WORK FOR THE CONTRACTOR ON THIS PROJECT. THE GUARANTEE SHALL BE FOR A FULL YEAR FOLLOWING ISSUANCE OF THE FINAL PAYMENT OF RETAINAGE. ALL MATERIALS AND WORKMANSHIP SHALL BE. WARRANTED FOR ONE YEAR FROM ACCEPTANCE DATE. 25. TOWER SHALL BE CONSTRUCTED OF GALVANIZED STEEL OR PAINTED PER APPLICABLE STANDARDS OF THE FAA OR OTHER APPLICABLE FEDERAL OR STATE AGENCY. 21 lb PLANS PREPARED FOR: 4C5DUKE ENERGY® 299 FIRST AVENUE NORTH ST. PETERSBURG, FL 33701 Office: - (727) 820-5396 PROJECT INFORMATION: CASWELL BEACH MC -1®14 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PLANS PREPARED BY: TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919)'661.6351 www.tepgroup.net SEAL: N.C. LI N611 # C-1794 4 07-13-15 CONSTRUCTION 3 OG -19-15 CONSTRUCTION 2 05-11-15 90% 1 04-22-15 PRELIMINARY REV ' DATE ISSUED FOR: DRAWN BY. JTC LCHECKED BY: JA5 SHEET TITLE: GENERAL, NOTES SHEET NUMBER: REVISION: 4 © H TEP #: 31862 v- r t Co.> EXIST. UTILITY POLE EXIST. TELCO PEDESTAL APPROXIMATE LOCATION OF II I ADJACENT PARCEL BOUNDARY EXIST. CONTOUR LINE EDGE OF PAVEMENT --- OHW--- OVERHEAD WIRE ---R/W--- I X — i L_ EXISTING TREE LINE PROGRESS INC L — J i OCEAING EE1NS - I I HOMEOWNERS ASSO INC L__ -11 i PARCEL 25 f HDOO f 0 f 17-7-1 DB 9 90 f PC 0370 L--Jj BOUNDARY L__j 1 I L --i I L_ L 1N/F' _ _ _ DUDE ENERGY PROGRESS INC PARCEL 25fIA02f DB 3499 PC 478. DB 308 PG 988 i i EXISTING UTILITY EASEMENT i I EXISTING POND EXISTING GRAVEL ACCESS DRIVE TOWER EXISTING -EXISTING XFMR— APPROXIMATE LOCATION ` - R W OF EXISTING PAVEMENT OB 1422 PG 702 & NIP THE TOWN OF CASWELL BEACH PARCEL 251NA050 DB f422 PC 702 SM® PROPOSED 80' SELF-SUPPORT TOWER. SEE SHEET C-3 FOR ELEVATION. _ - APPROXIMATE LOCATION OF \ � _ N o - -- R/yy--- STATIC VEGETATION LINE - _ PRIOPOSED STING OEXPANSION.I WTH SEE EXISTING LIGHT POLE (TYP)_R/� SHEET C-2 FOR DETAILS. EXISTING BUILDING (TYP) NOTES: 1. THE BASIS OF THE MERIDIANS AND COORDINATES FOR THIS PLAT IS THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM 1983 (NCSPCS NAD 83), BASED ON DIFFERENTIAL GPS OBSERVATIONS PERFORMED ON JANUARY 8, 2015. M/F STATE OF WORTH CAROLINA CASWELL BEACH COAST GUARD STATION PARCEL 25fCA00f DB 916 PG 279 2. VERTICAL INFORMATION SHOWN, BASED IN THE NORTH AMERICAN VERTICAL DATUM OF NAVD 1988 IN FEET. 3. ALL DISTANCES ARE GROUNDED UNLESS OTHERWISE NOTED. 4. THE TOWER IS LOCATED IN ZONE "AE", AREAS WHERE THE BASE FLOOD ELEVATION IS DETERMINED TO BE 14' ACCORDING TO FEMA COMMUNITY PANEL ##372028500J, DATED JUNE 2, 2006. MTE BEAN SCALE: 1" =200' LEGEND EXIST. PROPERTY LINE Co.> EXIST. UTILITY POLE EXIST. TELCO PEDESTAL O PROPERTY CORNER .---200 --- EXIST. CONTOUR LINE EDGE OF PAVEMENT --- OHW--- OVERHEAD WIRE ---R/W--- RIGHT-OF-WAY X — CHAIN LINK FENCE EXISTING TREE LINE iN/F DECARLUCCI GUY R ETUJI JEAtNtNIE C PARCEL 251JA00104 DB 3058 PC 0003 0 )N/F DUKE ENERGY PROGRESS INC APPROXIMATE PARCEL 26YIA02101 LOCATION OF X'. DB 341f PG 478 ADJACENT PARCEL BOUNDARY -TAT-�- - — � CASE NIE TOWN CASWELL o IsP s Ic R/WD is(Z 9100) BOF EACH - PARCEL 25IIA02105 DB 2952 PC ff97 �-_ 0 200 400 SCALE IN FEET PLANS PREPARED FOR: DUKE EEo 299 FIRST AVENUE NORTH ST. PETERSBURG, FL 33701 Office: (727).820-5396 PROJECT INFORMATION: CASWELL BEACH NC -1014 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PLANS PREPARED BY: TOWER ENGINEERING PR®FES61ONUS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE; (919) 661-6351 www.tepgroup.net N.C. LI,kEN$E # C-1794 SEAL: Octo6er19, 2015 5 10-19-15 CONSTRUCTION 4 07-16-15 CONSTRUCTION 3 06-19-15 CONSTRUCTION 2 05-11-15 90%a REV DATE ISSUED FOR: I DRAWN BY: RCL I CHECKED BY: JA5 I SHEET TITLE: SFE PLAN SHEET NUMBER: REVISION: C©1 6 . TEP #: 31862 EXISTING TELCO PEDESTAL X EXISTING FENCE X SECTION TO BE REMOVED X � EXISTING DUKE k SELF—SUPPORT TOWER WITH ST. PETERSBURG, FL 33701 CONCRETE PAD'. X X � CASWELL BEACH X X CASWELL BEACH ROAD CASWELL BEACH, NC 28465 EXISTINGPROPOSED 80' FENCED SELF—SUPPORT i TOWER. SEE SHEET C-3 FOR ELEVATIC TOMER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661-6351 www,tepgroup.net N.C. E # C-1794 SEAL: 4 00pQp� ©08B�ao a Ro 600 � d si �8 p[PpJ� 06 p3 34 ��8�QF2p0fl�4 June 19, 2015 06-1 9-15 CON5TRUCTION 2 05-1 1-15 90% 1 04-22-15 PRELIMINARY E3 0 02-04-15 PRELIMINARY REV DATE ISSUED FOR: DRAWN BY: JTC CHECKEDBY: JA5 SHEET TITLE: �� COMPOUND DETA�L 2� REVISION: C-2 TEP #: 318G2 EXISTING TELCO PEDESTAL X EXISTING FENCE X SECTION TO BE REMOVED X � EXISTING DUKE k SELF—SUPPORT TOWER WITH ST. PETERSBURG, FL 33701 CONCRETE PAD'. X X � CASWELL BEACH X X CASWELL BEACH ROAD CASWELL BEACH, NC 28465 EXISTINGPROPOSED 80' FENCED SELF—SUPPORT COMPOUND TOWER. SEE SHEET C-3 FOR ELEVATIC PROPOSED FENCE EXTENSION. SEE Sf C-4 FOR DETAILS. PROPOSED S-6" WIDE MANGATE. SEE SHEET C-4 FOR DETAILS. 5`-3"f 1 ` .„t 1 � x EXISTING GRAVEL LOT EXISTING EDGE OF GRAVEL EXISTING ^� BUILDING � k (TYP) X x 4” OF #57 STONE INSIDE PROPOSED FENCE EXTENSION 0 4 8 SCALE IN FEET PLANS PREPARED FOR: DUKE EYo 299 FIRST AVENUE NORTH ST. PETERSBURG, FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: CASWELL BEACH NC -1014 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PLANS PREPARED BY: 1� p_ TOMER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661-6351 www,tepgroup.net N.C. E # C-1794 SEAL: 4 00pQp� ©08B�ao a Ro 600 � d si �8 p[PpJ� 06 p3 34 ��8�QF2p0fl�4 June 19, 2015 06-1 9-15 CON5TRUCTION 2 05-1 1-15 90% 1 04-22-15 PRELIMINARY E3 0 02-04-15 PRELIMINARY REV DATE ISSUED FOR: DRAWN BY: JTC CHECKEDBY: JA5 SHEET TITLE: �� COMPOUND DETA�L SHEET NUMBER: REVISION: C-2 TEP #: 318G2 90'-0"t T/LIGHTNING ROD - 4) 80!-O"± T/TOWER q/MW DISH 50'-G"± q/FUTURE MW DISH �AdViTEIIVNA I C MOUNTING LEGS @l ANI HEIGHT (AZUMITH) (Id 80'-O"f C LIGE 80'-0"t A (30') RFS 50'-0"t A (30') 6,0 RF! *FUTURE LOADING (DASHED) OTE. TOWER SHALL BE CONSTRUCTED OF G OR PAINTED PER APPLICABLE STAND OR OTHER APPLICABLE FEDERAL OF m s ,W D o 0'-O"± (REF.) y T/CONCRETE rn z -'O z z w r mGm'5-�i�, m m m D o - "1 w rn z -'O z z w r mGm'5-�i�, m > cfl co z 0 c z -a a) 0 O w m D 4� - K co m m ; < rn P �v y �0 'o A ==i I( a cn cn cn is ®� z C C) Cz ��Z C7 I) -nm -i N O v coooY -1 mm a: n US - -u P -0p rn z to D G 0 0 O C W 6�A z { > c o < Z W b N � � m r z O � wu z z w r mGm'5-�i�, m > cfl co z 0 c 44= rnn� q�,N d� CD <3-> ��to w m D 4� Z O 0 8 16 SCALE IN FEET o z z w m n cn q�,N d� ��to m D coND .Z7 - N Z O m 'rl m y o, IamF 0M y �,- 'o 0o n 0 m Ti I( a ;{ - < -n m> ®� z A Cz ��Z C7 I) -nm -i N O v coooY (N CN O W � C)0 110 °' -4 to NOTE: FENCING MATERIAL AND •INSTALLATION SHALL BE IN ACCORDANCE WITH BNP SPECIFICATION 064-001. STRETCHER BARS FULL HEIGHT NOT LESS THAN 3/g" x 34" MIN. CROSS SECTION ON ALL GATES AND POSTS 3" SCH40 PIPE CORNER & GATE POST 2'-0" FOR ALL POST IN ROCK MIN. -3'-6" FOR ALL POSTS IN SOIL OR 6" BELOW FROST LINE–WHICHEVER IS GREATER ! I I I I I •I L._J GALV/ 3 STRANDS OF 12 GA. BARBED WIRE WITH 4 POINT BARBS 3'-0" O.C. 10' 0" O.C. MAX. 5'-0" O.C. MIN. 1Y2" BRACE SCH40 PIPE ►.l TYMAL FENCE EL EVATDN. SCALE: N.T.S. 6.. 112" 17 2" SCH 40 GATE POST CHAIN LINK FABRIC VCHAIN 1'-0" 6" 1918' GATE 6" BRACING LINK FABRIC (GATE ` vvv AND FENCE TO MATCH) 45' vvv vyv� �v v 1Y2' SCH40 BRACE v AT FENCE & GATE �vv�v� TOP RAIL PIPE USED ON CORNERS M�Wl � �v�v` �yy� � ueiuAN DATES DETA�L &WHERE FENCE IS 3 v�W_ �v vvv vvvv �`x LINE POST 10 O.C. MAX. i 1'_0" EXTEND BARRIER &STONE v� SPANS OR LESS ���� y j TENSION BAR y 1'-0" BEYOND FENCE ON ZA INSTALL W/ SLOT2" I ALL 4 SIDES MR MR y ��G �• 4" NO. 57 FINISH GRADE - � p _ffm-III-III-III- -III I=I —11 I- –III—I jl I I—III—III— III -III -III- I—I I I—I I III=III= II—III—III— I II—III—III— GEOTEXTILE? I 1 FABRIC I I •° I. 11°.I� DRILLED.PIER 00 I' `fie' –I 24 S F d FILL MATEA'= 0. SI., �r CONCRETE :C.,O,N.CRETE DEPTH VARIES 6. y3;0i I +,' � � y v, -Y8" BRACE RODS co Z y �vv yy � �v 2Y" SCH40 PIPE �C� y v y x� 'u x> INTERMEDIATE POST �' � y y � � v I � �v_�� r.: r � Rye: � � _111 � �� xx->C ��� �y�� . .�� v- TYMAL FENCE EL EVATDN. SCALE: N.T.S. 6.. 112" 17 GATE STOP i KEEPER DETA�L GATE DETENT DETA�L SCALE: N.T.S. SCALE: N.T.S. F E CEI BARBED W i l? E ARM D E _I a PLANS PREPARED FOR: 4 DUKE ENERGY® 299 FIRST AVENUE NORTH ST. PETERSBURG, FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: CASWELL BEACI–I NC -101 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) 11 PLANS PREPARED BY: 9 TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (91.9) 661-6351 www.tepgroup.net N.C. LICENSE -1794 s�ooaeoa�° dune 19, 2015 3 OG -19-15 CONSTRUCTION 2 05-11-15 90% 1 04-22-15 PRELIMINARY 0 02-04-15 PREUMINARY REV DATE ISSUED FOR: DRAWN BY: JTC CHECKED BY: JAS SHEET TITLE: FENCE ®ETAALS SHEET NUMBERREVISION: C-4 3 TEP #: 31862 2" SCH 40 GATE POST CHAIN LINK FABRIC VCHAIN 1'-0" 6" 1918' GATE 6" BRACING LINK FABRIC (GATE ` AND FENCE TO MATCH) 45' HINGE a LATCH ' 3–STRAND BARBED WIRE AT FENCE & GATE TOP RAIL � ueiuAN DATES DETA�L CHAIN LINK FENCE FABRIC SCALE: N.T.S. LINE POST 10 O.C. MAX. i 1'_0" EXTEND BARRIER &STONE FINISHED GRADE METAL GATE DETENT 1'-0" BEYOND FENCE ON ZA INSTALL W/ SLOT2" I ALL 4 SIDES PARALLEL TO FENCE VARIES 4" NO. 57 FINISH GRADE GRADATION _ffm-III-III-III- -III I=I —11 I- –III—I jl I I—III—III— III -III -III- I—I I I—I I III=III= II—III—III— I II—III—III— GEOTEXTILE? I 1 FABRIC I I •° I. 11°.I� DRILLED.PIER 00 I' `fie' –I 24 S F d FILL MATEA'= 0. SI., CONCRETE CONCRETE :C.,O,N.CRETE DEPTH VARIES 6. y3;0i I +,' � � 10" 1 fes— itiC C ;.. 4 ?,r ;} .r q 10" r GATE STOP i KEEPER DETA�L GATE DETENT DETA�L SCALE: N.T.S. SCALE: N.T.S. F E CEI BARBED W i l? E ARM D E _I a PLANS PREPARED FOR: 4 DUKE ENERGY® 299 FIRST AVENUE NORTH ST. PETERSBURG, FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: CASWELL BEACI–I NC -101 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) 11 PLANS PREPARED BY: 9 TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (91.9) 661-6351 www.tepgroup.net N.C. LICENSE -1794 s�ooaeoa�° dune 19, 2015 3 OG -19-15 CONSTRUCTION 2 05-11-15 90% 1 04-22-15 PRELIMINARY 0 02-04-15 PREUMINARY REV DATE ISSUED FOR: DRAWN BY: JTC CHECKED BY: JAS SHEET TITLE: FENCE ®ETAALS SHEET NUMBERREVISION: C-4 3 TEP #: 31862 ELECTRICAL NOTES: SCOPE: 1. SHALL INCLUDE ALL LABOR, MATERIALS AND APPLIANCES REQUIRED FOR THE FURNISHING, INSTALLING AND TESTING, COMPLETE AND READY FOR OPERATION OF ALL WORK SHOWN ON THE DRAWING AS SPECIFIED HEREIN: 1, ELECTRIC SERVICE 4. MISCELLANEOUS MATERIALS 2. CONDUIT AND RACEWAY 5. TELEPHONE CONDUITS 3, CONDUCTORS 6. LIGHTNING ARRESTING SYSTEM CODES 1. THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE LAWS AND CODES. THESE INCLUDE BUT ARE NOT LIMITED TO THE LATEST EDITIONS OF: A. THE NATIONAL ELECTRICAL SAFETY CODE D. LOCAL AND STATE AMENDMENTS B. THE NATIONAL ELECTRIC CODE — NFPA-70 E. REGULATIONS OF THE SERVING UTILITY .COMPANY C. THE INTERNATIONAL ELECTRIC CODE — IEC F. NCEC 2. ALL PERMITS REQUIRED SHALL BE OBTAINED BY THE CONTRACTOR. 3. AFTER COMPLETION AND FINAL INSPECTION OF THE WORK, THE OWNER SHALL BE FURNISHED A CERTIFICATE OF COMPLETION AND APPROVAL. TESTING 1. UPON COMPLETION OF THE INSTALLATION, OPERATE AND ADJUST ALL EQUIPMENT AND SYSTEMS TO MEET SPECIFIED PERFORMANCE REQUIREMENTS. ALL TESTING 'SHALL BE DONE BY QUALIFIED PERSONNEL. GUARANTEE 1. IN ADDITION TO THE GUARANTEE OF THE EQUIPMENT BY THE MANUFACTURER, EACH PIECE OF EQUIPMENT SPECIFIED HEREIN SHALL ALSO BE GUARANTEED FOR DEFECTS OF MATERIAL OR WORKMANSHIP OCCURRING DURING A PERIOD OF ONE (1) YEAR FROM FINAL ACCEPTANCE OF THE WORK BY THE OWNER. WITHOUT EXPENSE TO THE OWNER. ALL WARRANTEE CERTIFICATES & GUARANTEES FURNISHED BY THE MANUFACTURERS SHALL BE TURNED OVER TO THE OWNER. CO-ORDINATION: 1, CONTRACTOR SHALL COORDINATE ALL WORK WITH THE POWER AND TELEPHONE COMPANIES AND SHALL COMPLY WITH ALL SERVICE REQUIREMENTS OF EACH UTILITY COMPANY, EXAMINATION OF SITE 1. PRIOR TO BEGINNING WORK, THE CONTRACTOR SHALL VISIT THE SITE OF THE JOB AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS AFFECTING THE PROPOSED ELECTRICAL INSTALLATION AND SHALL MAKE PROVISIONS AS TO THE COST THEREOF. FAILURE TO COMPLY WITH THE INTENT OF THIS PARAGRAPH WILL IN NO WAY RELIEVE THE CONTRACTOR OF PERFORMING ALL WORK NECESSARY FOR A COMPLETE AND WORKING SYSTEM OR SYSTEMS. CUTTING, PATCHING ARID EXCAVATION: - 1, COORDINATION OF ALL SLEEVES, CHASES, ETC., WILL BE REQUIRED PRIOR TO THE CONSTRUCTION OF ANY PORTION OF THE WORK, ALL CUTTING AND PATCHING OF WALLS, PARTITIONS, FLOORS, AND CHASES IN CONCRETE, WOOD, STEEL OR MASONRY SHALL BE DONE AS PROVIDED ON THE DRAWINGS. 2. ALL NECESSARY EXCAVATIONS AND BACKFILLING INCIDENTAL TO THE WORK UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWING SHALL BE PROVIDED BY THIS CONTRACTOR, 3. SEAL ALL PENETRATION THROUGH WALL AND FLOORS WITH APPROVED GROUT, EXTERIOR CONDUIT: 1, ALL EXPOSED CONDUIT SHALL BE NEATLY INSTALLED AND RUN PARALLEL OR PERPENDICULAR TO STRUCTURAL ELEMENTS. SUPPORTS AND MOUNTING HARDWARE SHALL BE HOT DIPPED GALVANIZED STEEL. RACEWAYS 1. ALL CONDUCTORS SHALL BE INSTALLED IN CONDUIT. ALL CONDUIT SHALL BE RIGID STEEL, EMT OR SCH40 PVC AS INDICATED ON THE. DRAWINGS. 2. WHERE INSTALLED ON EXTERIORS AND EXPOSED TO DAMAGE, ALL CONDUIT SHALL BE RIGID STEEL, ALUMINUM CONDUIT SHALL NOT BE ALLOWED. 3. CONCEALED CONDUIT IN WALLS OR INTERIOR SPACES ABOVE GRADE MAY BE EMT. 4, UNDERGROUND CONDUITS SHALL BE RIGID STEEL OR SCHEDULE 40 PVC AS INDICATED ON THE DRAWINGS. 5. ALL CONDUIT RUNS SHALL USE APPROVED COUPLINGS AND CONNECTORS, PROVIDE INSULATED BUSHING FOR ALL CONDUIT TERMINATIONS. ALL CONDUIT RUNS IN A WET LOCATION SHALL HAVE WATERPROOF FITTINGS. 6. PROVIDE SUPPORTS FOR ALL CONDUITS IN ACCORDANCE WITH NEC REQUIREMENTS. ALL CONDUITS SHALL BE SIZED AS REQUIRED BY NEC. 7, BURIAL DEPTH OF ALL CONDUITS SHALL BE AS REQUIRED BY CODE FOR EACH SPECIFIC CONDUIT TYPE AND APPLICATION. 8. CONDUIT ROUTES ARE SCHEMATIC. CONTRACTOR SHALL FIELD VERIFY BEFORE BID. COORDINATE ROUTE WITH WIRELESS CARRIER AND BUILDING OWNER, EQUIPMENT: ALL DISCONNECT SWITCHES SHALL BE SERVICE ENTRANCE RATED, HEAVY DUTY TYPE. 2. NEW CIRCUIT BREAKERS SHALL BE RATED TO WITHSTAND THE MAXIMUM AVAILABLE FAULT CURRENT AS DETERMINED BY THE .LOCAL UTILITY. CONTRACTOR SHALL VERIFY MAXIMUM AVAILABLE FAULT CURRENT, AND ' COORDINATE INSTALLATION WITH THE LOCAL UTILITY BEFORE STARTING WORK. 3. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL/LISTED BY UL OR A' NORTH CAROLINA APPROVED THIRD PARTY TESTING AGENCY. CONDUCTORS 1, FURNISH AND INSTALL CONDUCTORS CALLED FOR IN THE DRAWINGS. ALL CONDUCTORS SHALL HAVE TYPE THWN (MIN) (75' C) INSULATION, RATED FOR 600 VOLTS. 2. ALL CONDUCTORS SHALL BE COPPER, THE USE OF ALUMINUM CONDUCTORS SHALL NOT BE ALLOWED. ALL CONDUCTORS SHALL BE UL LISTED AND SHALL BE PROVIDED AND INSTALLED AS FOLLOWS: A. MINIMUM WIRE SIZE SHALL BE #12 AWG. B. ALL CONDUCTORS SIZE #8 AND LARGER SHALL BE STRANDED. CONDUCTORS SIZED #10 AND SMALLER MAY BE SOLID OR STRANDED. C. CONNECTION FOR#10 AWG AND SMALLER SHALL BE BY TWISTING TIGHT AND INSTALLING INSULATED PRESSURE OR WIRE• NUT CONNECTIONS. D. CONNECTION FOR #8 AWG AND LARGER SHALL BE BY USE OF STEEL CRIMP—ON SLEEVES WITH NYLON INSULATOR. 3. ALL CONDUCTORS SHALL BE COLOR CODED IN ACCORDANCE WITH NEC STANDARDS. 4. THE RACEWAY SYSTEM SHALL BE COMPLETE BEFORE INSTALLING CONDUCTORS PENETRATIONS:. 1, CONTRACTOR SHALL COMPLY WITH UL PENETRATION DETAILS FOR PENETRATIONS OF ALL RATED WALLS, ROOF, ETC. GROUNDING 1. ALL ELECTRICAL NEUTRALS, RACEWAYS AND NON—CURRENT CARRYING PARTS OF ELECTRICAL EQUIPMENT AND ASSOCIATED ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH NEC ARTICLE 250. THIS SHALL INCLUDE NEUTRAL CONDUCTORS, CONDUITS, SUPPORTS, CABINETS, BOXES, GROUND BUSSES, ETC. THE NEUTRAL CONDUCTOR FOR EACH SYSTEM SHALL BE GROUNDED BY ONE POINT ONLY. 2. PROVIDE GROUND CONDUCTOR IN ALL RACEWAYS. 3. PROVIDE BONDING AND GROUND TO MEET NFPA 780 — LIGHTNING PROTECTION AS A MINIMUM. 4. PROVIDE GROUNDING SYSTEM AS INDICATED ON THE DRAWINGS, AS REQUIRED BY THE NATIONAL ELECTRIC CODE AND RADIO EQUIPMENT MANUFACTURER. PLANS PREPARED FOR: 4 jEm) DUKE 9 ERY® 299 FIRST AVENUE NORTH ST, PETERSBURG, FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: �4C-1J"i=4 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PLANS PREPARED BY: TOMER ENGINEERING PROFESSIOM66 326 TRYON ROAD RALEIGH, NC 27603 OFFICE; (919) 661-6351 www.tepgroup.net N.C. LICENSE # C-1794 SEAL: 9une 19, 2015 f" ABB EVIAMNS AND LEGEND A — AMPERE PVC — SCH40 RIGID NON—METALLIC CONDUIT AFG — ABOVE FINISHED GRADE RGS — RIGID GALVANIZED STEEL CONDUIT ATS — AUTOMATIC TRANSFER SWITCH SW — SWITCH AWG — AMERICAN WIRE GAUGE TGB — TOWER GROUND BAR BCW — BARE COPPER WIRE UL — UNDERWRITERS LABORATORIES BFG — BELOW FINISHED GRADE V — VOLTAGE BKR — BREAKER W — WATTS C — CONDUIT XFMR — TRANSFORMER CKT — CIRCUIT XMTR — TRANSMITTER 1 '` DISC — DISCONNECT .j" EGR — EXTERNAL GROUND RING EMT — ELECTRIC METALLIC TUBING FSC — FLEXIBLE STEEL CONDUIT GEN — GENERATOR ----E---- UNDERGROUND ELECTRICAL CONDUIT GPS — GLOBAL POSITIONING SYSTEM GRD — GROUND ----T---- UNDERGROUND TELEPHONE CONDUIT IGB — ISOLATED GROUND BAR 8 KILOWATT—HOUR METER IGR — INTERIOR GROUND RING (HALO) UNDERGROUND BONDING AND KW — KILOWATTS --------- GROUNDING CONDUCTOR. NEC — NATIONAL ELECTRIC CODE O GROUND ROD PCS — PERSONAL COMMUNICATION SYSTEM PH — PHASE D CADWELD PNL — PANEL ® GROUND ROD WITH INSPECTION WELL PNLBD — PANELBOARD PLANS PREPARED FOR: 4 jEm) DUKE 9 ERY® 299 FIRST AVENUE NORTH ST, PETERSBURG, FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: �4C-1J"i=4 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PLANS PREPARED BY: TOMER ENGINEERING PROFESSIOM66 326 TRYON ROAD RALEIGH, NC 27603 OFFICE; (919) 661-6351 www.tepgroup.net N.C. LICENSE # C-1794 SEAL: 9une 19, 2015 f" 3 OG -19-15 CONSTRUCTION 2 05-11-15 900/0 1 04-22-15 PRELIMINARY 0 02-04-15 PRELIMINARY REV DATE ISSUED FOR: DRAWN BY: JTC CHECKED BY: JAS SHEET TITLE: c!=CTICFU,1. _TES SHEET NUMBER: REVISION: E. -I TEP #: 31862 G,OIN�DItZcJ Nk Tl A 1. GROUNDING ELECTRODES SHALL BE CONNECTED IN A RING USING #2 AWG BARE TINNED COPPER WIRE. THE TOP OF THE GROUND RODS AND THE RING CONDUCTOR SHALL BE 2 FEET BELOW FINISHED GRADE. GROUNDING ELECTRODES SHALL BE DRIVEN ON 10'-0" CENTERS. (MIN. 15'-0" MAX) 2. BONDING OF THE GROUNDED CONDUCTOR (NEUTRAL) AND THE GROUNDING CONDUCTOR SHALL BE AT THE SERVICE DISCONNECTING MEANS/ BONDING JUMPER SHALL BE INSTALLED INSTALLED PER N.E.C. ARTICLE 250:30. 3. CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER WHEN THE GROUNDING SYSTEM IS COMPLETE. THE CONSTRUCTION MANAGER SHALL INSPECT THE GROUNDING SYSTEM PRIOR TO BACKFILLING. EXISTING TELCO PEDESTAL X X X X X X X- X -----X --a oo 0 I , -- I i o0ooe X � io0 .; a I I oo I .•; I -• I o x I o 3 000 I \ 00 I I o 0 I X00 � I I I \1 00o I I I 1 0o I I I oo I I \ I oo I I � � x I ` - --- X. X X -X DRAWING NOTES: O PROPOSED TOWER GROUND RING 2O INSPECTION WELL AT CONNECTION TO PROPOSED GROUND RING 3O %/ x 10' COPPER GROUND ROD (TYP) O TOWER BONDING TO FENCE (TYP OF' 2) MIX, "fil2 IltGM(tlt✓INI,oi121[Gel 11 O TOWER BONDING TO TOWER GROUND RING (TYP OF 3) OGATE BONDING TO TOWER GROUND RING O7 EXISTING COMPUND GROUND RING. CONTRACTOR TO VERIFY LOCATION. ®1 X 0 4 8 SCALE IN FEET SCALE: N.T.S. FENCE POST. T 'rNcL GATE POST GROUNDING D1=WL PLANS PREPARED FOR: DUKE. ENERGY. 299 FIRST AVENUE NORTH . ST. PETERSBURG, FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) p PLANS PREPARED BY: 9 TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661-6351 www.tepgroup.net I N.C. LICENSE # C-1794 I SEAL: June 19, 2015 3 OG -19-15 CONSTRUCTION 2 05-1 1-15 CADWELD 1 04-22-15 GATE FLEX JUMPER CONNECTION. GATE v W/ CADWELD TYPE VS. ---j ISSUED FOR: v I CHECKED BY: JA5 #2 AWG TINNED SOLID u v v v CADWELD ✓v/ \v Al,� CONNECTION TO EXTERIOR GROUND _ �i �i �i THEN COLD T 'rNcL GATE POST GROUNDING D1=WL PLANS PREPARED FOR: DUKE. ENERGY. 299 FIRST AVENUE NORTH . ST. PETERSBURG, FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) p PLANS PREPARED BY: 9 TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661-6351 www.tepgroup.net I N.C. LICENSE # C-1794 I SEAL: June 19, 2015 3 OG -19-15 CONSTRUCTION 2 05-1 1-15 90% 1 04-22-15 GATE FLEX JUMPER 0 02-04-15 Z W/ CADWELD TYPE VS. ---j ISSUED FOR: DRAWN BY: JTC I CHECKED BY: JA5 #2 AWG TINNED SOLID M COPPER WIRE. CADWELD TO EXTERIOR GROUND �i RING. �- - '------� OUTER GROUNG RING. #2 AWG TINNED SOLID a ; kj',f 'f i`==.?'y'4 rt I!.it COPPER WIRE. tt,t 10' x GROUND ROD.—/ T 'rNcL GATE POST GROUNDING D1=WL PLANS PREPARED FOR: DUKE. ENERGY. 299 FIRST AVENUE NORTH . ST. PETERSBURG, FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) p PLANS PREPARED BY: 9 TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661-6351 www.tepgroup.net I N.C. LICENSE # C-1794 I SEAL: June 19, 2015 3 OG -19-15 CONSTRUCTION 2 05-1 1-15 90% 1 04-22-15 PRELIMINARY 0 02-04-15 PRELIMINARY REV DATE ISSUED FOR: DRAWN BY: JTC I CHECKED BY: JA5 SHEET TITLE: wmS m E rl G009121110G glia SHEET NUMBER: E-2 REVISION: 3 TEP #: 318G2 PLANS PREPARED FOR: MALE SCREW COVER W/ TEFLON LUBRICANT DUKE f.. ,... ENERGYo B 299 FIRST AVENUE NORTH PVC COLLAR ST, PETERSBURG, FL 33701 #2 SOLID, BARE, Office: (727) 820-5396 TINNED COPPER PROJECT INFORMATION: GROUND WIRE (TYP) FINISHED GRADE GROUND RING CASWELL BEACH NOTE: MINIMUM SPACING OF 12" :, GROUND ROD ��/�/�j/ � \ x �\�\,X,' ; ` ����®�� BETWEEN ALL CADWELDSCASLL = NC CASWELWLE BEACH, 8D465 CADWELD (TYP) \� _ #2 SOLID, BARE, (BRUNSWICK COUNTY) 'd TINNED COPPER GROUNDING CONDUCTOR PLANS PREPARED BY: ®� ���� EXOTHERMIC WELD THERMOWELD ®Al OR APPROVED EQUIVALENT �4� DIRECTLY TO TOP OF GROUND ROD (2 PLACES) a... 8" x 42" PVC SLOTTED GROUND WIRE WELL BY HARGAR (P/N: 360P42)�� CADWELD 27" SLOT CUT SMOOTH FOR TOWER ENGINEERING PROFESSIONALS GROUND ROD %s" x 10' COPPER CLAD GROUND RING. EXTEND NOTCH 326 TRYON ROAD STEEL GROUND ROD 2" ABOVE CONDUCTOR. RALEIGH, NC 27603 SIDE VIEW OFFICE: (919) 661-6351 www.tepgroup.net CADWELD GROUNDING DETAIL GROUND ROD WITH INSPECTION WELL N.C. LICENSE# C-1 794 SCALE: N.T.S. SCALE: N.T.S. WALL MOUNTING BRACKET, 30' X 11x1" H,H,C.S. BOLT, NEWTON INSTRUMENT CO. NEWTON INSTRUMENT CO. (CAT.# A-6056) p� (CAT.# 3012-1) ���aaa Eg' .bAF C%'iY a O •... INSULATORS, NEWTON INSTRUMENT CO. FINISHED GRADE e `gyp . ,� ;� i x ' (CAT.# 3061-4) Ia y� CADWELD 9une 19,2 015 3 06-19-15 CON5TRUCTION ®. 0 0 I� Z 0 0 to 2 05 -II -15 90% 0 0 0 0 0 1 04-22-15 PREUMINARY LOCKWASHER, 0 0 0 0 02-04-15 PRELIMINARY NEWTON INSTRUMENT CO. (CAT.# 3015-8) 0 0 . 0 0 ® GROUND RING ® 0 1 #2 AWG BCW (TINNED) DRAWN BY: JTCCHECKED BY: JAS 0 COPPER GROUND ROD SHEET TITLE:. COPPER GROUND BAR Y4%4"x20" MIN. ( 0 x 10'-0" LONG) GROUNDING NEWTON INSTRUMENT CO. CAT,# B-6142, NOTE: HOLE CENTERS TO MATCH NEMA DOUBLE LUG CONFIGURATION GROUND BAR SHALL BE SIZED TO ACCOMODATE DETAILS 8 ALL GROUNDING CONNECTIONS REQUIRED -PLUS i° . s`s' PROVIDE 50%SPARE CAPACITY. SHEET NUMBER: REVISION: STANDAR® GROUND BAR DETAIL COPPER -CLAD STEEL GROUND RODE 3 SCALE: N.T.S. SCALE: N.T.S. ®3 TEP #: 31862 OTE" PLANS PREPARED FOR: " THE CONTRACTOR SHALL UTILIZE AN INTERMEDIATE ;I;N 1i ; tsi ;i=�R GROUND BAR FOR ANTENNA RAD CENTERS OVER 200'. ENERGY® Y_• _.,..} 299 FIRST AVENUE NORTH ST. PETERSBURG, FL 33701 WIRES FROM GROUND KITS Y4"x4"x15" COPPER (NUMBER CORRESPONDS Office: (727) 820-5396 GROUND BAR BONDED WITH NUMBER OF COAXIAL PROJECT INFORMATION: TO TOWER CABLES). CONNECT GROUND WIRES TO WIRES FROM GROUND KITS CASWELL BEACH GROUND BAR WITH 2—HOLE (NUMBER CORRESPONDS WITH LUGS. ALL SURFACES TO BE WITH NUMBER OF COAXIAL CABLES) 0 0 o COATED WITH KOPR—SHIELD. . SWELL L BEACH ROAD CAWELL BEACH, NC 28465 O o 0 0 �, CONNECT GROUND WIRES TO (BRUNSWICK COUNTY) 0 0 0 0 0 0 0 3 GROUND BAR WITH 2—HOLE 0 0 0 0 '' 0 0 o ULUGS., ALL SURFACES TO BE PLANS PREPARED BY - 0 00 COATED WITH KOPR—SHIELD. 0 0"iiz.0 e #2 AWG TO GROUND #2 AWG BARE TINNED 0 0 0 0 0 0 0 0 0 I1 BAR WITH CADWELD SOLID COPPER GROUND 0 0 0 0 0 0 0 0 0 WIRE CADWELDEDTO � GROUND RING (TYP OF 2). END VIEW Y4"x4"x15" COPPER GROUND BAR BONDED TO TOWER. TMER ENGINEERING PROFESSIONALS 326 TRYON ROAD LOWER GROUNDBAR UPPER/ 8NTERMEMATC GROUND BAR RALEIGH, NC 27603 OFFICE: (919) 661-6351 SCALE: N.T.S. SCALE: N.T.S. WWW.t@Pgf0UP.112t N.C. LICENSE # C-1794. STAINLESS SEAL: o - STEEL BOLT STAINLESS E STEEL NUT STAINLESS STEELa BELLEVILLE WASHER GROUND LEADS �a TO NEW EQUIPMENT8.12-AL e iivv a crs , GROUND BAR LOCATED INSIDE TELCO CABINET o dune 19, 2015 STAINLESS STEEL BUUSPER BAR O 0 0 3 06-19-15 FLAT WASHER CONSTRUCTION 2 05 -II -15 90% CONNECT GROUND WIRES TO I. 04-22-15 PRELIMINARY GROUND BAR WITH 2—HOLE O 02-04-I5 PRELIMINARY LUGS. ALL SURFACES TO BE COATED WITH KOPR-SHIELD. REV DATE ISSUED FOR: NOTES. GROUND LEAD TO DRAWN BY: JTC CHECKED BY: JAS INSPECTION WELL AT 1. ALL HARDWARE SHALL BE 18-8 STAINLESS STEEL, INCLUDING THE BELLEVILLE tj EQUIPME{Vr:GR0UND=., nµ.F SHEET TITLE: WASHERS. COAT ALL SURFACES WITH KOPR—SHIELD BEFORE MATING. RING 2. FOR GROUND BOND TO STEEL ONLY; INSERT A DRAGON TOOTH WASHER BETWEEN G oROUNUNG THE LUG AND STEEL. COAT ALL SURFACES WITH KOPR—SHIELD. ®ETMLS fl SHEET NUMBER: REVISION: LUG DETML ML GROUND BAR N TELCO C MNET 3 SCALE: N.T.S. SCALE: N.T.S. -4 TEP #: 31862