Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
090202_Application_20240328
State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non-Discharge General Permit On September 30, 2024,the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore,all applications must be received by the Division of Water Resources by no later than April 3,2024. Please do not leave any question unanswered Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Certificate Of Coverage Number: AWS090202 2. Facility Name: Shady Branch Farms,LLC Deer Track 3. Permittee's Name(same as on the Waste Management Plan): Shady Branch Properties LLC 4. Permittee's Mailing Address: 100 Lake Dr City: Clinton State: NC Zip: 28328 Telephone Number: 910-284-2061 Ext. E-mail: 5. Facility's Physical Address: 5764 Burney Ford Rd City: Clarkton State: NC Zip: 28433 6. County where Facility is located: Bladen 7, Farm Manager's Name(if different from Landowner): 8. Farm Manager's telephone number(include area code): 9. Integrator's Name(if there is not an Integrator,write"None"): Mur2hy-Brown LLC 10. Operator Name(OIC): Greg E. Sullivan Phone No.: 919-273-0928 OIC#: 1011443 11. Lessee's Name(if there is not a Lessee,write"None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine-Wean to Feeder 8,400 Operation Types: Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses-Horses Wean to Feeder Dairy Heifer Laying Chickens Horses-Other Farrow to Finish Milk Cow Pullets Sheep-Sheep Feeder to Finish Dry Cow Turkeys Sheep-Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment Lagoons,Digesters and Waste Storage Ponds(WSP):(Fill/Verify the following information. Make all necessary corrections and provide missing data.) Structure Type Estimated Liner Type Estimated Design Freeboard Structure (Lagoon/Digester/ Date (Clay,Synthetic, Capacity Surface Area "Redline" Name WSP) Built Unknown) (Cubic Feet) (Square Feet) (Inches) 09-202-1 Lagoon 1/l/1990 588,203.00 -79 19.50 Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.1OC(d), either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan(WUP),signed by the owner and a certified technical specialist,containing: a. The method by which waste is applied to the disposal fields(e.g.irrigation,injection,etc.) b. A map of every field used for land application(for example:irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP £ The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2.A site map/schematic 3.Emergency Action Plan 4.Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6.Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist 7.Lagoon/storage pond capacity documentation(design,calculations,etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations,wetland determinations,or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list,please include the additional components with your submittal. (e.g.composting,digesters,solids separators,sludge drying system,waste transfers,etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included,this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than$10,000 or imprisonment of not more than 5 years,or both for a similar offense.) Print the Name of the Permittee/Landowner/Signing Official and Sign below.(If multiple Landowners exist,all landowners should sign. If Landowner is a/�corporation, signature should be by a principal executive officer of the corporation): Name(Print): h '6 fan 66 Uc Title: 416� i - Signature: Date: Name(Print): Title: Signature: Date: Name(Print): Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animal.operations@deq.nc.gov NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh,North Carolina 27699-1636 ' WASTE UTILIZATION PLAN Tuesday,April 12,2016 Producer: Shady Branch Properties,LLC Farm Name : Deer Track Nursery 9-202 100 Lake Dr Clinton,NC 28328 Telephone#: (910)590-3264 Type of Operation : Wean to Feeder Swine Number of Animals : 8400 pigs design capacity Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and avaialable water holding capacities. Normally waste shall not be applied to -land eroding at greater than 5 tons per acre per year. With special pre-cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. .4PR 0f�19 *c41'!1Q rainy Page 1 of 9 _. .. _F .. AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 8400 pigs X .4 tons waste/pigs/year = 3360 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 8400 pigs X .48 Ibs PAN/pigs/year = 4032 PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and suface application. TABLE 1 : ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE&CLASS- CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE N/ACRE N/ACRE USED TIME 1841 1 NORFOLK 2-6% BH 6.5 299 0 3.851 1151.15 MAR-SEP 1841 - 1 :NORFOLK 2-6% SG 1 50 0 3_851 192.5 SEP-MAY 1841 2 RAINS BH 4.5 194.04 0 3.69[ 716.008 MAR-SEP 1841 _ 2 RAINS SG 1 50 0 3.691 184.5 SEP-MAY 1841 3 GOLDSBORO 0-2% SH 6.5 299 0 2.291 684.71 MAR-SEP 1841 3 GOLDSBORO 0-2% _ SG 1 50 0 2.291 114.5 SEP-MAY 1841 4 GOLDSBORO 0-2% BH 6.5 299 0 4.11 1225.9 MAR-SEP 1841 4 GOLDSBORO 0-2% SG 1 50 0 4.1 205 SEP-MAY 1841 5 GOLDSBORO 0-2% BH 6.5 299 0 3.74� 1118.26 MAR-SEP 1841 5 GOLDSBORO 0-2% SG 1 50 0 3.74 187 SEP-MAY 1841 6 EXUM 0-2% BH 6.5 273 0 3.86 1053.78 MAR-SEP 1841 -1• 6 EXUM 0-2% SG 1 50 0 3.86 193 SEP-MAY 1841 7 EXUM 0-2% BH 6.6 273 0 1,731 472.29 MAR-SEP 1841 - 7 EXUM 0-2% SG 1 50 0 1.73 86.5 SEP-MAY 1841 8 EXUM 0-2% BH 6.5 273 0 4.49 1225.77 MAR-OCT 1841 - 8 EXUM 0-2% SG 1 50 0 4.49 224.5 SEP-MAY 1841 9 .EXUM 0-2% BH 6.5 273 0 2.421 660.66 MAR-SEP 1841 - 9 EXUM 0-2% SG 1 50 0 2.421 121 SEP-MAY TOTALS: 9817.03 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 of 9 ' TABLE 2 : ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specifications 2.) There are no Acres Leased Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation * Acreage figures may exceed total acreage in field due to overseeding. **Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in TABLES 1 and 2 above: CROP CODE CROP UNITS LBS NIUNIT BH HYBRID BERMUDAGRASS-HAY TONS 50 BH_ HYBRID BERMUDAGRASS-HAY SG_ SMALL GRAIN OVERSEEDED AC 50 Page 3 of 9 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 30.17 9,817 TOTALS: 30.17 9,817 AMOUNT OF N PRODUCED: 4,032 "**BALANCE -5,785 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres show in each of the preceeding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 638.4 pounds of plant available nitrogen (PAN) per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. See the attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 5.92 months. In no instance should the volume of waste being stored in your structure be within 2.3 feet of the top of the dike. If surface irrigation is the method of land application for this plan, it is the responsiblity of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. APPLICATION APPLICATION TRACT FIELD SOIL TYPE CROP RATE(in/hr) AMT(inches) 1841 — -2 RAINS SG 0.40 *1 +1841 2 RAINS 1 BH 0,40 '1 1841 — --1 NORFOLK 2-6% SG ; 0.50 '1 1841 NORFOLK 2-6% BH 0.50 *1 841 -3,-.a,-5 GOLDSBORO 0-2% i SG 0.50 `1 1841 3,4,5 GOLDSBORO 0-2% BH 0.50 `1 1841 6,-7,-8,-9 EXUM 0-2% SG ? 0.35 `1 _—. -- - - 9841 6,7,8,9 --— 0-2% BH 0.35 '1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Page 4of9 NARRATIVE OF OPERATION Page 5 of 9 PLANS & SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance.) *7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: the outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from anv aerennial stream or river (other that an irrigation ditch or canal. Animal waste Page 6 of 9 other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those owned by the landownwer, 14. Waste shall be applied in a manner not to reach other property and public right - of ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over-spraying. Animal waste may be applied to prior converted croplands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. *16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. *17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. *18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan"which will eliminate the possibility of an illegal discharge, pollution and erosion. *19. Waste handling structures, piping, pumps; reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied as a preemergence with no other applications of animal waste during the crop season. *21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume fpr waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate- determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production amd maintained. Soil and waste analysis records shall be kept for five (5) years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina Department of Agriculture regulations. * Liquid Systems Page 7 of 9 NAME OF FARM: Deer Track Nursery 9-202 OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. I (we) understand that I must own or have acces to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: Shady Branch PropeFties, LLC SIGNATURE: r � Dr '-'I 2 (� P NAME OF MANAGER (if different from owner): please print SIGNATURE: DATE: NAME OF TECHNICAL SPECIALIST: Curtis Barwick AFFILIATION: Barwick Ag Services ADDRESS (AGENCY): 103 Country Club Circle Clinton, NC 28328 (910) 385-1000 SIGNATURE: ram— Ff A DATE: Page 9 of 9 USDA ,-, Id States �re°� Bladen County, North Carolina Farm ' :75 Tract 1841 { 2016 Program Year CLU Acres HEL Crop 1 12.96 NHEL 2 26.85 NHEL 3 7.07 NHEL 4 14.03 NHEL 5 14.98 INHEL INacropiandn Noncro land Page Cropland Total: 60.91 acres Ne 2 o , ■ 4 m 3 l ; _1 Map Created March 30,2016 Base Image Layer flown in 2014 7 "` • J. Common Land Unit Cropland d" ; Non-Cropland E3 t ract Boundary -* Wetland Determination Identifiers dY Restricted Use 40 187.5 375 750 V Limited Restrictions Exempt from Conservation _ Eee., ® Compliance Provisions USDA FSA maps are for FSA Program administration only. This map does not represent a legal survey or reflect actual ownership;rather it depicts the information provided directly from the producer andfor the NAIP imagery. The producer accepts the data'as Wand assumes all risks associated with its use. The USDA Farm Service Agency assumes no responsibility for actual or consequential damage incurred as a result of any user's reliance on this data outside FSA Programs. Wetland identifiers do not represent the size,shape,or specific determination of the area. Refer to your original determination(CPA-026 and attached maps)for exact boundaries and determinations or contact NRCS. SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BMP's to Minimize Odor Site-specific Practices Farmstead Swine production (✓)Vegetative or wooded buffers: (✓)Recommended best management practices; (✓)Good judgment and common sense Animal body Dirty manure (}Dry floors surfaces covered animals Floor surfaces Wet manure-covered (✓)Slotted floors; floors (V)Waterers located over slotted floors; (✓)Feeders at high end of solid floors; (✓)Scrape manure buildup from floors; ( )Underfloor ventilation for drying Manure collection Urine (V)Frequent manure removal by flush,pit pits recharge or scrape Partial microbial ( )Underfloor ventilation decomposition Ventilation Volatile gases (✓)Fan maintenance; exhaust fans Dust (V)Efficient air movement Indoor surfaces Dust (✓)Washdown between groups of animals ( )Feed additives; ( )Feeder covers; ( )Feed delivery downspout extenders to feeder covers Flush Tanks Agitation of recycled ( )Flush tank covers lagoon liquid while tanks ( )Extend fill lines to near bottom of tanks are filling with anti-siphon vents Flush alleys Agitation during waste ( )Underfloor flush with underfloor water conveyance ventilation Pit recharge Agitation of recycled ()Extend recharge lines to near bottom of points lagoon liquid while pits pits with anti-siphon vents are filling Lift stations Agitation during sump ()Sump tank covers tank filling and drawdown Outside drain Agitation during waste ( )Box Covers collection or water conveyance junction boxes End of drain Agitation during waste ( )Extend discharge point of pipes pipes at lagoon water underneath lagoon liquid level Lagoon surfaces Volatile gas emissions (V)Proper lagoon liquid capacity Biological mixing (v)Correct lagoon startup procedures Agitation ( )Minimum surface area-to-volume ratio (✓)Minimum agitation when pumping ( )Mechanical aeration ( )Proven biological additives Irrigation sprinkler High pressure agitation (V)Irrigate on dry days with little or no wind nozzles Wind draft (✓)Minimum recommended operation pressure (✓)Pump intake near lagoon liquid surface ( )Pump from second-stage lagoon AMOC--November 11, 1996 12 M00202061575 �.- Storage tank or Partial microbial ( )Bottom or midlevel loading basin surface decomposition Mixing while ( )Tank covers filling Agitation when emptying( )Basin surface mats of solids ( )Proven biological additives or oxidants Settling basin Partial microbial decom- -( )Extend drainpipe outlets underneath liquid surface position Mixing while filling level Agitation when emptying ( )Remove settled solids regularly Manure,slurry or Agitation when spreading ( )Soil injection of Slurry/sludges sludge spreader Volatile gas emissions ( )Wash residual manure from spreader after use outlets ( )Proven biological additives or oxidants Dead animals Carcass decomposition ( )Proper disposition of carcasses Dead animal Carcass-decomposition ( )Complete covering of carcasses in burial pits disposal pits ( )Proper location/construction of disposal pits Incinerators Incomplete combustion ( )Secondary stack burners Standing water improper drainage (✓)Farm access road maintenance around facilities Microbial decomposition of away from facilities organic matter Manure tracked Poorly maintained access (✓)Farm access road maintenance onto public roads roads from farm access Additional Information: Available From: Swine Manure Management 0200 Rule/BMP Packet NCSU-County Extension Center Swine Production Farm Potential Odor Sources and Remedies,EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure Management:Pit Recharge--Lagoon Treatment:EBAE 128-88NCSU-BAE Swine Production Facility Manure Management:Underfloor Fluse-Lagoon Treatment 129-88NCSU-BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE103-83NCSU-BAE Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings;PIH-33 NCSU-Swine Extension Environmental Assurance Program: NPPC Manual NC Pork Producers Assoc Options for Managing Odor;a report from the Swine Odor Task Force NCSU Agri Communication Nuisance Concerns in Animal Manure Management: Odors and Flies;PR0101, Florida Cooperative Extension 1995 Conference Proceedings The issues checked ( ) pertain to this operation. The landowner/ integrator agrees to use sound judgment in applying odor control measures as practical. I certify the aforementioned odor control Best Management Practices have bee ,eviewed with me. (Landowner ignature) 13 M00202061676 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids (✓)Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. ( ) Remove bridging of accumulated solids at discharge Lagoons and Pits Crusted Solids (✓)Maintain lagoons,settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30%of surface. Excessive Decaying vegetation (✓)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage () Design,operate and maintain feed systems(e.g.. bunkers and troughs)to minimize the accumulation of decaying wastage. () Clean up spillage on a routine basis(e.g.7-10 day Interval during summer; 15-30 day interval during winter). Feed Storage Accumulation of feed () Reduce moisture accumulation within and around residues immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment(e.g.,covered bin for brewer's grain and similar high moisture grain products). () Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e.inspect for and remove or break up accumulated solids as needed). MIC--November 11, 1996 10 M0020200 573 Dry Manure Handling Accumulations of animal ()Remove spillage on a routine basis(e.g.7-10 day Systems wastes interval during summer; 15-30 days interval during winter)where manure is loaded for land application or disposal. ()Provide for adequate drainage around manure stockpiles ()Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. The issues checked ( ) pertain to this operation. The landowner/integrator agrees to use sound judgment in applying insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. (Landowner Signature) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC-- November 11, 1996 >� M00202061574 EMERGENCY ACTION PLAN PHONE NUMBERS �... DIVISION OF WATER QUALITY(DWQ) 910 433-3300 EMERGENCY MANAGEMENT SERVICES (EMS) (910)862-6760 SOIL AND WATER CONSERVATION DISTRICT(SWCD) (910)862-3179 NATURAL RESOURCES CONSERVATION SERVICE (MRCS) 910 862-3179 COOPERATIVE EXTENSION SERVICE (CES) (910)862-4591 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation,this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow-possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste-application field-actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s)that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred. ��II11e��� --YY��22 +5+�����r:r-• C. Leakage from the waste pipes and sprinklers-action include: a) Stop recycle pump. b) Stop irrigation pump. APR Q 3 2019 c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. Wow.4uailty D. Leakage from flush systems,houses, solid separators-action include: A Oparations Sectbn a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b) If holes are caused by burrowing animals,trap or remove animals and fill holes and compact with a clay type soil. c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 1 12/12/2007 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger(either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, after hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, and telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been undertaken and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice/technical assistance phone number. 4. If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: Murphy Brown. LLC b. Contractors Address: P.O. Box 856 Warsaw NC 28398 c . Contractors Phone: 910 293-3434 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: Kraig Westerbeek b. Phone: 910 293 - 5330 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 2 12/12/2007 Version=November 2,-2018 Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. I Primary Secondary Routine Mortality a0 Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S,106-403). The bottom of the burial pit should be at least one foot above the seasonal high I ater table.Attach burial location map and plan. Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .I 200. © Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. A composting system approved and permitted by the NC Department of Agriculture&Con- sume Services Veterinary Division (attach copy of permit). If compost is distributed off-farm, additional requirements must be met and a permit is required from NC DEQ. In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture&Consumer Services(G.S. 106-549.70). aAny method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm-specific mortality man- agem nt methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports variety of emergency mortality disposal options; contact the Division for guidance. • A atastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State V terinarian. • BL rial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • M�ss burial sites are subject to additional permit conditions (refer to facility's animal wF ste management system permit). • In -he event of imminent threat of a disease emergency,the State Veterinarian may enact ad Itional temporary procedures or measures for disposal according to G.S. 106-399.4. Signature of Farm Owner/Manager Date Signature of Technical Specialist Date Grower: L.L.C. - UEER I RAUK 15esignedy: KBW Address: 412 LAYFETTE ST. Checked By: DSE CLINTON, NC 28328 Date: 12/22/08 County: BLADEN Sheet 1 of 7 ANAEROBIC WASTE LAGOON DESIGN FARM INFORMATION Farm Pogulation: Nursery: __.._..__.__.__..._.._. 8400 Hd. Wean to Finish: -------------•-- 0 Finishing: ------------------ 0 Farrow to weanling: ......_..-.-.-------- 0 Farrow to feeder: ----•--------------- 0 Farrow to finish: -------••---- --_-- 0 Boars: ----•----------------- 0 Storage Period: ------------------- 180 Days 100 Yr.!24 Hr Storm Event ----------------••-- 7.5 In. "Heavy Rain"Factor 7.5 In. Rainfall in Excess of Evaporation ------------------- 7.0 In. Additional Water Usage: - --- -- -- 0 Additional Drainage Area: ------------------- 0 LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (YIN)------------ Y Does Operator Want Emergency Spillway? (Y/N)------------ N Was This Design Built Prior to Sept. 1996? (YIN)------------ N Is Drain Tile Req'd to Lower SHWT? (YIN)------------ N Seasonal High Water Table Elev: -------------------- 0,00 Freeboard: ------------------- 1.0 Ft. Emergency Spillway Flow Depth 4-9-Ft. Side Slopes: _..__...................._. 3 :1 (H:V) 0.0 0.0 Top of Dike Elevation: --•------------ Depth 97.00 Ft. Finished Bottom Elevation: _.•._.•-__...-.• 11.00 Ft. 86.00 Ft. Start Pump Elevation: ---------•------ 28.32 In. 94.64 Ft. Stop Pump Elevation: ------ - - 60 In. 92.00 Ft. LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES %_REQ.'D.. Storm Stor= 97948 (Cu.Ft.) 98,257 (Cu.Ft.) 100.32% Temporary= 146778 (Cu.Ft.) 174,303 (Cu.Ft.) 118.75% Permanent= 315000 (Cu.Ft.) 3_75,643 (Cu.Ft.) 100.20% Total Volume^ 559,726 (Cu.Ft.) 588,203 (Cu.Ft.) 105.09% 112 Treatment Volume= 157,500 (Cu.Ft.) 112 Treatment Volume Elevation = 89.25 Ft. 93.00 In. 90 Temporary Storage Volume Elevation = 93.23 Ft. 45.26 In. Min. Required Liner Thickness ----------•---------• 1.6 Ft. Lagoon Surface Area: (Inside TOD) ----------------- 78,358 S.F. -v Murphy-Brown,LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293-3434 Grower: JCT, E.L.C. - DEER TR77K Designed By: KBW Address: 412 LAYFETTE ST. Checked By: DSE CLINTON, NC 28328 Date: 12/22/08 County: BLADEN Sheet 2 of 7 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: [=Cu. Ft. LAGOON STAGE-AREA VOLUMES Contour Elevation (FT.) Area 'SF) Incr. Vol. (Cu. FT] Cumul. Vol. (Cu. FT) 86.00 44,048 0 87.00 46,782 45,415 45,415 88.00 49,596 48,189 93,604 89.00 52,486 51,041 144,645 90.00 55,452 53,969 198,614 91.00 58,495 56,974 255,588 92.00 61,615 60,055 315,643 93.00 64,810 63,213 378,855 94.00 68,083 66,447 445,302 d 95.00 71,431 69,757 515,059 , 96.00 74,857 73,144 588,203 " 97.00 78,358 76,608 664,810 These volumes were calculated using the vertical avers a end area method. �- TOTAL REQD VOL 559,726 CF CUMULATIVE VOL. ZONE VOL. 105.09% END PUMP = = = = 92.00 �FT 315,643 CF TR'MT 315,643 100.20% START PUMP = = ; 94.64 FT 489,946 CF TEMP 174,303 118.75% MAX STORAGE = 96.00 FT 1 588,203 CF STORMI 98,257 100.32% Murphy-Brown,LLC Engineering P.O.Box 856 Warsaw, NC 28398 (910)293-3434 Grower: JCT, L.L.C. -DEER TRACK Designed By: KBW Address: 412 LAYFETTE ST. Checked By: DSE CLINTON, NC 28328 Date: 12/22/08 County: BLADEN Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: Anima Type Capacity cu. t.rl = Total Nursery 8,400 30 1.00 _ 252.000 Wean to Finish 0 115 1.00 0 Finishing 0 135 1.00 0 Farrow to weanling 0 433 0.67 - 0 Farrow to feeder 0 522 0.67 0 Farrow to finish 0 1,417 1.00 0 Boars 0 400 0.50 0 Total Required Treatment Volume(cu.ft.)= 252,000 Sludge Storage Volume: Animal Type Capacity }._ ALW (cu.ft./Ib) Totalll Nursery 8,400 30 0.25 63,000 Wean to Finish 0 115 0.25 _0 Finishing 0 135 0.25 0 Farrow to weanling 0 433 0.17 0 Farrow to feeder 0 522 0.17 0 Farrow to finish 0 1,417 0.25 0 Boars 0 400 0.1 55 0 Total Required Sludge Storage Volume(cu. ft.)= 63,000 Temigorary Storajae Volume: Manure Production: Anima Type pacity" - Sto. Period Jday) =`i"otal Nursery _ _� 8,400 - 180 0.30 453,600 Wean to Finish 0 180 1,17 0 Finishing T 0 180 - 1.40 0 Farrow to weanling 0 _ 180 4.30 0 Farrow to feeder - 0 _ 180 4.50 0 Farrow to finish 0 180 13.50 0 Boars _D. _.. 180 4.00 _ 0 - _ w Total Manure Production(gals.)= �- � 453,600 Total Manure Production(cu.ft.)= 60,642 Excess Fresh Water: Animal Type Capacity' Sto. Period d.lday}=Total Nursery 8,400 184 0.20�- 302,400 Wean to Finish 0 180 _0,77 0 Finishing � 01 180 0.90� ...-_.._.,.,.,.,,�,.._0 Farrow to weanling 0 180 2.90 0 Farrow to feeder 0 180 3.50 0 Farrow to finish 0 180 9.50 0 ,Boars 0 180 2,70 0 Total Fresh Water Excess (gals.)= 302,400 Total Fresh Water Excess (cu.ft)= 40,428 Murphy-Brown, LLC Engineering P.O. Box 656, Warsaw NO 28398 (910) 293-3434 Grower: JCT, L.L.C. -DEER TRACK Designed By: KBW i Address: 412 LAYFETTE ST. Checked By: DSE ! CLINTON, NC 28328 Date: 12/22/08 County: BLADEN Sheet 4 of 7 Y r i Temporary Storage Volume: (Cont.", Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area +Additional Drainage Area)` Rainfall/ 12in./ft Vol.= (78358 sq.ft. + 0 sq.ft.) * 7 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 45,709 Storm Storage: Vol.=(Lagoon Surf, Area +Addt'I Drainage Area) *100Y024W. Storm(in)/12in./ft. Vol.= (78358 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft, j Total Required Volume for 1OOY0241-1r. Storm Event(cu.ft)= 48,974 "Heavy Rain" Storage: Vol.=(Lagoon Surf.Area +Addt'I Drainage Area)*"Heavy Rain" Factor(in)112!n./ft. Vol.= (78358 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft. Total Required Volume for"Heavy Rain"(cu.ft.)= 48,974 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 0 Total Required Storm Storage (100Yr. /241-1r. Storm + 'Heavy Rain')= 97,948 (CU.FT) Total Required Temporary Storage (Manure Prod. + Excess Fr. Water+ Rainfall Excess+Additional Water Storage)= 146,778 (CU.FT) Total Required Permanent Storage (Treatment +Sludge)= 315,000 (CU.FT) I TOTAL REQUIRED VOLUME= 559726 (CU.FT.) Murphy.-Brown. LLC Engineering z P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: JCT, L.L.C. -DEER TRACK Designed By: KBW Address: 412 LAYFETTE ST• Checked By: DSE CLINTON, NC 28328 Date: 12/22/08 County: BLADEN Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation ---------------- 97.00 FT. Emergency Spillway Crest Elevation ------------_..... Not Al Applicable Top of 100Yr,/24Hr. Storm Storage ------------------- 96.00 FT. Top of"Heavy Rain"Storage ---------—-------l• 95.33 FT. Start Pump Elevation ------------------- 94.64 FT. End Pump Elevation ------------------ 92.00 FT. Top of Sludge Storage ------------------ 87.36 FT, Seasonal High Watertable Elev. •.............------ 0.00 Finished Bottom Elevation ------------------- 86.00 FT. Inside Top Length --------.•---------- Not Applicable N Inside Top Width ----------------••••- Not Applicable } Side Slopes --•-•----••---------- 3:1 H:V Lagoon Surface Area ----------------- 78,358 SF Min. Liner Thickness (if required) -----------I......... 1.6 FT, Freeboard Depth -- ------------- 1.00 FT. Temporary Storage Period --- ----- - ---- 180 Days TOTAL DESIGN VOLUME= 588203 (CU.FT.) Zone Depths: Treatment/Sludge Storage Zone Depth - - 6.0 FT, Temporary Storage Zone Depth ----------- 2.6 FT. Freeboard /Storm Storage Zone Depth --------••-•• 2.4 FT. Total Lagoon Depth - -------- 11 0 FT. Nfurphy-Brown. LLC Engineering P.O. Box 856. Warsaw NC 28398 (910) 293-3434 Y F OPERATION & MAINTFNANCR PLAN m lam'Ia Ocon liquid management should be a year-round priority, important to manage levels so that you do not have problems y' 1t is especially wet Periods, during extended rainy and Maximum storage capacity should be available in the lagoon receiving crop is dormant (such as wintertime for bermuda ra attended rainy spells such as the thunderstormfor pen0ds when the that m the first signs of plant growth in the later win a sm a when there are season in the summertime, a farm waste maraa�ement plan should be done whenever the 'i'hls means receive 1 ereply sp n , irrigation according to lagoon liquid, This will make storage space available in the lagoon enough t0 Pertods. n the late summer/early fall the lagoon should be u marker (see Figure 2-1) to allow for winter storage, Eve effort g °r future wet maim'atn the lagoon close t° the minimum liquid level as long e roped down to the l to ow udlixadon plan will a110we it. as the weather and ewaste Waiting until the lagoon has reached its maximum storage capacity i�gate does not leave room for storing excess water during Overflow from the lagoon for any reason except a 2s-yam, za.ho�before starting to scare law and sub' extended wet periods Jaot tv penalty action. storm ;e a violation of The routine maintenance of a lagoon involves the following! Maintenance of a Fescue or commo vegetative cover for the dam, n bermudagrass are the most common vegetative covers, The vegetation should be fertilized each maintain a vigorous stand, The amount of fertilizer year, apif plied to based on a $oils test, but in the event that it is not practical to obtain A soils test each year, the lagoon embankment and sump ied should be Should be fertilized with S pounds per acre of 10-10.14,dorg ��s equivalent, Brush and trees , the Gmbankm*nt must be cvntrolied, This may be done by mowing, spraying, grazing, chopping, or a combination of these practices, This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth, NOTE., If vegetation is controlled by spraying, the herbicide must not be allowed the lagoon water, Such chemicals could harm the bacteria in the lagoon that to enter the waste, g at are treating Maintenance inspections of the entire lagoon should be made during the initial f 1li the lagoon and at least monthly and after ma'or a ng °f checked should 'include, as a minimum, the ollowin rainfall and storm events, Items to be Waste Inlet Pies, Recycling Pipes, and Over�ow pipes--•look for; 1- separation of joints 2, cracks or breaks 3. accumulation of salts or minerals 4, overall condition of pipes ' 1ra1 oon surfaee---look for: undesirable vegetative rowth 2• floating or lodged debris Embankment---look for: 1• settlement, cracking, or u a• side slope scabilit �J g" holes 3• w y---slumps or bulges et or damp areas on the back slope 4• erosion due to lack of vegetation or as a result of wave acti 5. rodent damage on Larger lagoons may be subject to liner damage due to wave acti winds, These waveS can erode the lagoon sidewalls, thereb weakening used by strong A good stand of vegetation will reduce the potential dame a c�u wave action causes serious damage to a lagoon sidewal y eakening the lagoon dam, used to reduce the wave impacts, I, baffles s dthe lagoon aaction, ma n, If Any of these features could lead to erosion and y any of these features, you should call an appropriate ex n familiar with i weakening of the dam,construction of waste lagoons. pe If your lagoon has of a waste discharge. H You may need to provide a t,a design and technical ex owever, a Po fix if there is a throat undertakingAny digging into ae lagoon ndamlwitthnh °�yld be rev awed by the v'fth potentially serious consequences and should ptlpe ent is a serious recommended by an appropriate technical expert, conducted unless p rt, Transfer Pumps---check for proper operation of: I I recycling pumps 2. irrigation pumps Check for 1eLij* , loose fittings, and overall pump operation. An unusual noise, or a large amount of vibration, may indicate that the pump is in need replacement. unusually loud or grinding or repair or DOTS; Pum in s stems should be ins gg � inspected and operated frequently enough so that you are not comp can surprised" by equipment failure, You shoo system maintenance at a time when your lagoon is at its low level, This will u safety time should major repairs be required, Hav should perform our pumping to think about switching, repairing , or borrowin ing a nearly full lagoon is notthe tiime Your neighbor's lagoon is full also, You should cons der maintainins. g an if inventoryOOofsfull, Parts or pumps, pare Surface water diversion features are designed to c drainage waters (such as rainfall runoff, roof drainage,gutterf surface lets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures, t The only water that should be coming from your lagoon is thawhich comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly, You should inspect your diversion system for the following: 1• adequate vegetation 2. diversion eapgGity 3. ridge berm height Identified roblerns should be corrected promptl� It is advisable to ins ty during or immediately following a heavy rain. If It as determine proper solutions, c'Onsult with appropriate experts. sistance is naeCad your You should record the level of the lagoon just prior to when rain is relic record the level again 4 to 6 hours after the rain (assumes there is no um t�, a n Tthen ive you an idea of how much your lagoon level will rise with a certain r You must also be recordin our P $) his will lannin i $ Y rainfall for this to work), a�nfall amount g irrigation applications and storage, If your lagoon rises excessivelhouloduhenlp in eve an inflow problem from a surface water diversion or there m y y a lagoon from the surrounding land. May be seepage into the Lagoon Operation Startup; 1• Immediately after construction establish a complete sod cover on bare surfaces to avoid erosion, soil 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes, 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom filling or another means of slowing the incoming a lagoon avoid d ergs initial of the lining, 4, When Possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather), 5� It is recommended that a new lagoon be seeded with sludge from a health working swine lagoon in the amount of 0.25 Y liquid volume. This seeding should occour at leasntwo weeeks prioroto the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH, If the PH falls below 7.0, add agricultural lime at the rate of I pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid PH is between 7,5 and 8,0, 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity, Consultation with a technical s if these conditions occur for prolonged periods, especially donna the warm season, Loading,, The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will Emotion. Flush systems that wash waste into the lagoon several times daily are optimum for treatment, pit recharge systems, in which one or more buildings are drained and recharged each day, also work well, • Praotiae water =conservation`mini spillage from leaking waterers b okan piPes and washdown t Proper maintenance and water conservation, se and through • Minimize feed wastage and spillage by keeping e feeders a ' will reduce the amount of solids entenng the lagoon dJusted, This managements Maintain lagoon liquid level between the the full temporary storage level, Permanent storage level and Place visible markers or stakes on the lagoon bank to show minimum Iiquid level and the maximum liquid lever (Figure 2e start irrigating at the earliest possible date in the s ri g n nutrient requirements and soil moisture so that temporary will be maximized for the summer thunderstorm season,P ng based on imgate in the late summer/early fall to provide maxi storage Storage for the winter, imusimilarly, um lagoon • The lagoon liquid level should never be closer than I foot to the low, Point of the dam or embankment, st • Do not pump the lagoon liquid level lower that the level unless you are removing sludge, Permanent storage • Locate float pump intakes approximately IS inches underneath the li ui surface and as faraway from the drainpipe inlets as possible. q d • Prevent additions of bedding materials, long e molded feed, plastic syringes, or other foreign materials into the lagoon,-stemmed forage or vegetation, • Frequently remove solids from catch basins at end of confinement houses wherever they are installed, ses or Maintain strict vegetation, rodent, and varmint control near lagoon edges, Do not allow trees or large bushes to grow on lagoon dam or embankment, Remove sludge from the lagoon either when the sludge storage ca acit p full or before it fills SO percent of the permanent storage volume. y s • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a Pollutant discharge, Sludge Removal: Rats of lagoon, sludge buildup can be reduced by, • proper lagoon sizing • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin • minimizing feed wastage and spillage, or Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and require more land to properly use the nutrients. Removal techniques,. • Shire a custom applicator, • Mix the sludge and lagoon liquid with a chopper-agitator pump through large-bore sprinkler irrigation seo impeller and soil incorporate, nearby cropland, • Dewater the upper ppe part of lagoon by irrigation onto nearby cropland or and proad;o to cropland gor fora eland p into liquid sludge a g , and soil incorporate, PPlicator; haul rporate, • Dewater the upper part of lagoon by irrigation onto nearby cropland or .^ an forageland; dredge sludge from lagoon with dragline or sludge barge; berm area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate, Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water, The sludge will conn different nutrient and metal values from the liquid, The application of the sludge o fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement, Waste application rates will be discussed in detail in Chapter 3, When removing sludge, you must also pay attention to the liner to prevent damage, Close attention by the pumper or drag-line operator will ensure that the lagoon liner remains intact, If you see soil material or the synthetic liner material being disturbed stop the activity immediately and not resume until you are sure that the sludge can be should removed without liner injury, If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be a lied to 1 and metal levels, as indicated by a soil tost, and incorporated to land he the chance of s erosion. Note that if the sludge is applied to fields with very high soil-test phosphores, it should be applied only at rates equal to the crop remove] of phosphorus, As with other wastes, always haVe your lagoon sludge analyzed for its nutnent value, The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used tO observe the wind direction and other conditions which could increase the concern of neighbors, POSSibie Causes Of Lagoon Failure La oon failures result in the unplanned discharge of wastewater ofailures include 1 ter from the Assumin a through the bottom or sides, overto in a structure, Types dam, n structure proper design and construction, the owner has theg'resnd breach of the 8 tractors safety, Items which may lead to lagoon failures inel '��b;Iity far Modification of the lagoon structure- ode: to the dam without proper design and constructlon, Cons an example is the placement of a pipe lagoon design before placing any pipes in dams,) ult an expert in • Lagoon liquid levels---high levels are a safety risk, • Failure to Inspect and maintain the dam, • Excess surface water flowing into the lagoon, Liner integrity--.protect from inlet i rempvZi, or rupture from lowerins lagoon�iqund'le rl be during sludge dwa er table, NOTE: If lagoon water is allowed to overtop the dam, the moving of lwastewater and Possiblerm in the once this damage starts, it can quickly dam failure, q kl cause a 11arge discharge