HomeMy WebLinkAboutNCC200391_NOT Closeout Documents_20240503 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
County: Onslow Project: One Harbor Church River basin: White Oak
Person financially responsible:One Harbor Church-Tom Tappiing,Lead Pastor Project#: ONSLO-2020-025
Address: P.O.Box 1977,Morehead City,NC 28557
1. Project Location: Main Street Extension,Swansboro
Pictures: No
2. Weather and soil conditions: Sunny 80,Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: April 02,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.The E&SC file will be closed.Termination of coverage under the NPDES General
Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee
via a Notice of Termination(NOT). Please contact Jesse.Batz@deq.nc.gov with questions
regarding this report.
Reported by: Jesse Batz/ Others present:
Date of inspection: Apri 01,2024 Time arriving on site: 2:45 PM Time leaving site: 3:15 PM
CC: