Loading...
HomeMy WebLinkAbout20160044 Ver 1_Shoreline Stabilization_20160111State of North Carolina DWR Department of Environment and Natural Resources Division of Water Resources Division of Water Resources ISA NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, INC 27699-1617 JAN 1 1 2016 Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Mailing Address: No lb4 _Rrm V)S L n vie_ Terrell . NC. Z96aR'2-) Telephone Number: 419 - 579- 002,5 Fax Number: E-mail Address: 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: htto://www.saw.usace.armv,miI/Portals/59/docs/reRulatory/reRdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: _-SMcich IL an CGL4e_Y- Company Affiliation: l Q✓l me'lar Cu4pvn _bOcy) 4 L 1 �+'JVT ✓n `�, I ✓1C - Mailing Address: MM t2 [fie r �h RCA 1v-ou-�-navy NC Z5(Ilnla Telephone Number: E-mail Address: Person to receive the Certification Approval: Fax Number: 704- 528- .3900 CCZ5 fer clu S II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) ft County: l cAaw bQ Nearest Town: Terre ^.' Subdivision name or site address (include phase/lot number): / or -m vie w l -la r bo u r // J, -o f- T9 Directions to site - please include road names and numbers, landmarks, etc.: ,-om. 1 77 N E;;+ N0.u rh l E� onio MC -15-0\4. Turn left ovito PTreenwood -Rd, 1 o de (in decimal degrees) 35 59 2451 Longitude (decimal degrees)—'?D . T 30,?,Z 9 5. Describe the existing land use or condition of the siteat the I time of this application (residential, undeveloped, etc.): �e 5 , l 8ey--i � a l 6. Property size (acres): 7. Lake/ river/ ocean adjacent to property: /VO' 8. Describe proposed work (include discussion ,1 as to how hardening of shoreline has been avoided, or why it is necessary): r e O AP. CA eC,c +D 1 Q' 9. Will work be conducted from land? ❑ From water? FA 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 0 Owner/Agent's Signature Printed Name Date [15A NCAC 02H .0502(f)] Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Lay) e. R Norma SI Lake Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM FOR DUKE ENERGY USE ONLY Duke File No. Application Fee $ Security Deposit $ Check # Date Recv'd Initials Date of Duke Energy Lake Services, applicant and/or contractor on-site inspections Date Initials Date Final Protection/Avoidance Area Markings Field - Verified Approved to Start Work By * : Date Completion Required Date Passed Closeout Inspection* (Print) Date of Any Approved Extension Initials Initials Date (Sign) Initials Any Stop Work Orders or SMG Violations*? (check one) ❑Yes ❑No (If Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated Initials * Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Orders with application. PART I. - APPLICANT INFORMATION (Please Print) Name � l c _ , G`CJ I_urch J (D Lake Address _- 4 13 ro® e,' I e r -re I I N C_ ZT(oM Telephone c419) 579- OD Z Mailing Address (If different) Contractor Companyf1 Contractor Contact Person cnna�1r ® Telephone (704)_5Z B- -74T� LAKE ^'LOT INFORMATION � /1 Lake / YO etiiR ✓1 CountyGY."1 1 V1( City _7-_ M Ire I � StateAl y Tax Map No SubdivisionNe)rA d 1 P W / bDUr 1"nLot / Section No. 6 Lot Size /,/4 -Acres Are there any Co -Applicants*? (check one) ❑Yes 2 o (If Yes, inchide names, addresses, phone nos., lot nos., lot sizes in PART V - ADDITIONAL INFORMATION) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project and is done to benefit multiple owners / lease holders of project -front properties within a single development. The check for the application filing fee and security deposit should be from the party shown as Applicant and not several checks from the Applicant and Co -Applicants. Do not continue the application until an on-site inspection has been conducted between a Duke Energy Lake Services Representative (DELSR) and the applicant and/or the excavation contractor. NOTE: Initializing this portion of the application by a DELSR in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. LWDate of on-site inspection Initials (Duke Energy) (applicant/contractor) Duke Energy Page 1 of 11 rev 9/19/14 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM PART II. - DESCRIPTION OF PROJECT A. BASIC INFO 1. Type of excavation: (check one) �❑New excavation ❑ Maintenance excavation 2. Purpose of excavation: (check one) lif7 �Boat Access Channel ❑ Water Intake Channel ❑ //Wastewater Discharge Channel ❑ Other (specify): 3. Lake user category: (check one) 134vate ❑Residential Marina ❑Commercial Marina ❑Public ❑Other (specify): 4. Max. Excavation Area Dimensions (ft): Length f7 0 Width O Depth /0 (Note: include additional area dimensions if necessary so response to #5 below equals max. area dimensions in #4) 5. Volume of Excavated Material (TOTAL for the project): 5 Cubic yards 6. Type of material removed (applicant determines byfteld sample ifpractical):��n V'J Cl �J I fT C 1/ 7. Excavation Site area: .&#3 Acre (s) Disposal Site area: (D Acre (s) 8. Total Disturbed Area (including equipment staging area):( �3 Acre (s) 9. Does the project meet the requirements of the applicable General Permit? (check one) Pres ❑No 10. Do you claim title to the disposal area? (check one) VYes ❑No 11. Do you claim title to the equipment staging area? (check one) [fes ❑No 12. Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) Dyes FKo (If Yes, specify): 13. How will the excav d mater' I be entr pped and the erosion co tr lled? (e.& see atfached erosion control plan and disposal area design): IT 14. Type(s) of excavation equipment to be used: !Jc%P A5X oaf,y a L(✓X'D #aC &5 15. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) Dyes XN0 (If yes, explain) 16. Will return water re-enter the reservoir? (Check one) Dyes Po ❑N/A (If Yes, specify point(s) of re-entry and show on Excavation Area Drawing) 17. Is there an existing facility (e.g. pier) that access is being maintained to by conducting the excavation? Dyes 13IV0 (If Yes, specify the existing permit number-. If No, include a scaled drawing of the proposed facility). Permit # 18. Tota] planned duration of thework (htchrde first equipment mobilization, excav tion through final mitigation measures complete): START l l FINISH Z /� (Month) (Year) (Month) (Year) Note: Notify Duke Energy Lake Services at 1-800-443-5193 prior to commencing any excavation work within the project boundary. Duke Energy Page 2 of 11 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx rev 9/19/14 DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM PART II. (Continued) B. PROTECTION / AVOIDANCE AREA DESCRIPTION Complete the following table including all land areas within and immediately adjoining the disturbed area: Protection/Avoidance Areas (check all that apply) Approx. Identification Method (*) Avoid (A) or Mitigate (M) Field ID Work Area Dwg. ID Acreage Ln a. Marshland, swamp, ponds, beneficial aquatic vegetation or other potential wetlands (circle all that apply) V/A b. Buffer Zones (specify width & source of reduirement) -D e W < I l be- don e- c ! .J p )L.ca a+u r, U1 oir;LLCY)--). d "-9 l a�eri iz I Leve led o -W b y b c. Environmental Areas as identified by Duke Energy �/� d. Natural Areas as identified by Duke Energy n/ /A e. Historic properties (specify) ilk L Rare or threatened species (specify) 16A g. Buried gas, water, sewer, communications Duke Energy Page 3 of 11 rev 9/19/14 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx DUDE ENERGY EXCAVATION PERMIT APPLICATION FORM Protection/Avoidance Areas (check all that apply) Approx. Identification Method_M Avoid (A) or Mitigate (M) Field ID Work Area Dwg. ID Acreage it * or electric lines (circle) /1 / / V h. Impact Minimization Zones as identified by Duke Energy / L Other areas requiring specific avoidance, protection or mitigation (specify) * For "Field ID" column, specify entity or person that performed the identification and how it was physically marked (e.g. Duke Energy (John Doe)/Pink and purple -dotted tape, Corps of Eng. (John Smith)/ yellow flagging). For "Work Area Dwg ID" column, show the symbol that is used on the drawings to identify the protection/avoidance area. ** List and attach mitigation plans Duke Energy Page 4 of 11 rev 9/19/14 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM C. APPLICANT'S SIGNATURES Comments: Applicant Name (print) 'n 1 c G -f 8 E `� r ( ) Applicant Signature* � L Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Co -Applicant Signature* Lot # 7~ Date 5- /(0 Lot # Date Lot # Date Lot # Date Lot # Date Lot # Date *Per my signature, the information provided in this application is correct to the best of my knowledge. BEFORE YOU MAIL THE APPLICATION TO DUKE ENERGY LAKE SERVICES ENSURE YOU HAVE: • CHECKED THE INFO THOROUGHLY • MET ALL REQUIREMENTS FOR A COMPLETE APPLICATION (see cover letter of application package) • INCLUDED A SINGLE CHECK TO DUKE ENERGY FOR THE APPLICATION FILING FEE AND SECURITY DEPOSIT • INCLUDED ALL AGENCY PERMITS OR COMMENT LETTERS AND RESOLVED ALL ISSUES RAISED • INCLUDED ALL REQUIRED DRAWINGS (INCLUDING PROPOSED FACILITIES), PERMIT # FOR EXISTING FACILITIES, SURVEYS AND PLANS • INCLUDED COPIES OF DEEDS AND AUTHORIZATION LETTERS Duke Energy Page 5 of 11 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx rev 9/19/14 DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM PART III - INFORMATIONAL REQUIREMENTS FOR ALL APPLICANTS (NC & SC) In addition to the completed application form PARTS I & 11, the following items must be provided to Duke Energy Lake Services for all applicants in North and South Carolina: A." A copy of the deed and registered survey plat or other instrument under which the applicant claims title to the affected property (the shoreline adjoining the excavation area, equipment staging area and the disposal area), OR if the applicant is not claiming to be the owner(s) of said property, then forward a copy of the deed and registered survey plat or other instrument under which the owner(s) claim title plus written authorization from the owner(s) to carry out the project on their land. !R An accurate scaled drawing (1"=25' for projects <1000 cubic yards of material removed or 1 "= 100' for larger projects) of the area to be excavated, including all the information required under Application Process - ITEM 5 of the Application Package cover letter (Attachment 1). Cy- An accurate scaled drawing (1"=25' for projects <1000 cubic yards of material removed or 1"= 100' for larger projects) of the proposed design for the disposal area, including all the infonnation required under Application Process - ITEM 6 of the Application Package cover letter (Attachment 1). Also include any erosion control plan or standard reporting form requirements as noted under ITEM 6 of the Application Package cover letter. A map or Duke Energy Directions by Road form showing directions to the excavation area and disposal area. A USGS topographic map with a directional arrow indicating the exact location of the excavation project and Latitudinal and Longitudinal coordinates for the project site.* 1`' VA list of names and addresses of adjoining property owners for both the excavation area and disposal area. G. A copy of all permits and/or letters of correspondence to/from local, state and federal agencies that require notification or issue individual pen -nits. Provide the existing permit number if excavation is being conducted to maintain access to an existing facility (e.g. pier) or provide an accurate scaled drawing of any proposed facility if a facility does not currently exist. Note: A separate application and approval is required for proposed Private Facilities (e.g. pier). I. A check for the application filing fee and security deposit and the signed Excavation Project User's Agreement letter. *USGS maps may be accessed via the Internet at http://gis.enr.state.nc.us/ utilizing the following pathway: Data catalogue/Digital Raster Graphics/specific county. Longitudinal and latitudinal information is available via the Internet at www.mapblast.com, www.mapsonus.com or www.maptech.com. Duke Energy Page 6 of 11 rev 9/19/14 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx DUKE ENERGY EXCAVATION PERMIT APPLICA'T'ION FORM PART IV — AGENCY REVIEWS/APPROVALS REQUIRED A. NORTH CAROLINA APPLICANTS ONLY I. The following agencies and the Catawba Indian Nation Tribal Historic Preservation Office require at least 30 days prior notification for all excavations in North Carolina reservoirs. Notify them by forwarding a completed copy of this application, including the information required under PART III A -F to: U.S. Anmy Corps of Engineers N.C. State Historic Preservation Office Regulatory Field Office N.C. Dept. of Cultural Resources 151 Patton Avenue Division of Archives & History Room 208 c/o Ms. Renee Gledhill -Earley Asheville, North Carolina 28801 4617 Mail Service Center (828) 271-4014 Raleigh, NC 27699-4617 (919)733-4763 Catawba Indian Nation Tribal Historic Preservation Office Dr. Wenonah Haire 1536 Tom Steven Road Rock Hill, SC 29731 (803)328-2427 What to Expect: a) If the excavation can be done under the requirements of the General Permit (GP) or a Nationwide Permit (NWP), you will typically receive a copy of the Corps' tear sheet documenting authorization and providing any additional instructions. If the excavation isn't covered under the GP or a NWP, you'll be required to obtain an individual 404 Dredge and Fill permit from the Corps. b) You will typically receive a letter from the NC SHPO documenting their concurrence with your application, requiring additional information or recommending modifications. You must address each comment in your final application. c) You must receive written documentation from the Corps that your application either meets the requirements of the GP or a NWP or that the proper 404 Dredge and Fill permit has been received before Duke Energy can process your application. d) If you do not receive any documentation from the NCWRC within 30 days of their receipt of your application, you may proceed with the application process, recognizing however that if their comments come in later in the application process, you will also be required to address them. (See exception for Commercial/Conveyance/FERC review applications below). e) If you do not receive any documentation from the NC SHPO within 30 days of their receipt of your application, you must provide that agency with a follow-up letter requesting the agency comment on your proposal within 15 days from the date of the letter. If you do not receive any response as a result of this second letter, you may proceed with the application process, recognizing however that if their comments come in later in the application process, you will also be required to address them. Note: This second 15 -day letter requirement also applies to the agency reviews in PART IV.A. 1-4 when the application is for a Commercial Facility, Conveyance or other application requiring FERC review. 2. In addition to the three entities in PART IV.A.1 above; if the proposed excavation is located in the counties listed below, the applicant must also provide at least 30 days prior notification to the following agency by forwarding a copy of the completed Excavation Permit Application Form (including the infonmation required under PART III A -F) to: (For Alexander; Catawba, Cleveland, Gaston, Iredell, Lincoln or Mecklenburg Counties) N.C. Dept. of Environment & Natural Resources Division of Water Resources 610 East Center Avenue; Suite 301 Mooresville, North Carolina 28115 (704)663-1699 (704) 663-6040 (fax) (For Burke, Caldwell, McDowell or Transylvania Counties) N.C. Dept. of Environment & Natural Resources Interchange Building 59 Woodson Place Asheville, North Carolina 28801 (704)251-6208 What to Expect: a) You will typically receive a letter providing Division of Water Resources concurrence, which may require additional infonnation or recommend modifications. You must address each comment in your final application to Duke. Duke Energy Page 7 of 11 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx rev 9/19/14 b. DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM b) You must receive written documentation from the NCDENR that 401 Water Quality requirements are met before Duke Energy can process your application. 3. In addition to the above requirements, if the proposed excavation is located in Mecklenburg County, the following agency must be provided with a copy of the completed Excavation Pen -nit Application Form (including the information required under PART III A -F): Mecklenburg County Land Use and Environmental Services Agency 700 North Tryon Street Charlotte, North Carolina 28202 (704)336-5500 What to Expect: a) You will typically receive a letter from the county documenting their concurrence with your application, requiring additional information or recommending modifications. You must address each comment in your final application. b) If you do not receive any documentation from the county within 30 days of their receipt of your application, you may proceed with the application process, recognizing however that if their comments come in later in the application process, you will also be required to address them. (See exception for Commercial/Conveyance/FERC review applications below). 4. In addition to the above requirements, if the proposed excavation is part of a Commercial Facilities Application, Conveyance Application, or will require FERC review, the applicant must provide at least 30 days prior written notification to the following additional agencies by forwarding the completed Excavation Penn—it Application Fonn, including the information required under PART III A -F: N.C. Wildlife Resources Commission U.S. Fish & Wildlife Service c/o Mr. Chris Goudreau c/o Mr. Mark Cantrell 645 Fish Hatchery Rd. 160 Zillicoa Street Marion, NC 28752 Asheville, NC 28801 828-652-4360 Ext. 223 (828) 258-3939 Ext. 227 (For lakes Wylie, Mtn. Island, Norman, Lookout, Hickory) (For lakes Rhodhiss and James) N.C. Dept. of Environment & Natural Resources N.C. Dept. of Environment & Natural Resources Division of Environmental Health Division of Environmental Health Public Water Supply Section Public Water Supply Section c/o Mr. Britt Setzer c/o Mr. Harold Saylor 610 East Center Street; Suite 301 59 Woodfin Place Mooresville, NC 28115 Asheville, NC 28801 N.C. Dept. of Environment & Natural Resources Division of Parks and Recreation 12700 Rayleaf Church Road Raleigh, NC 27614 (919) 733-4181 What to Expect: a) You will typically receive a letter from each agency documenting their concurrence with your application, requiring additional information or recommending modifications. You must address each agency comment in your final application. b)If you do not receive any documentation from an agency within 30 days of their receipt of your application, you must provide that agency with a follow-up letter requesting the agency comment on your proposal within 15 days from the date of the letter. If you do not receive any response as a result of this second letter, you may proceed with the application process, recognizing however that if their comments come in later in the application process, you will also be required to address them. Note: This second 15 -day letter requirement also applies to the agency reviews in PART IV.A. 14 when the application is for a Conmmercial Facility, Conveyance or other application requiring FERC review. Duke Energy Page 8 of 11 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx rev 9/19/14 DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM PART IV — AGENCY REVIEWS/APPROVALS REQUIRED B. SOUTH CAROLINA APPLICANTS ONLY 1. Consultation or review is required by the S.C. State Historic Preservation Office (SC SHPO) and the S.C. Institute of Archaeology and Anthropology (SCIAA) for all excavations in South Carolina. The applicant must submit a copy of the completed South Carolina Department of Archives and History State Historic Preservation Office Project Review Form (attached) to: S.C. State Historic Preservation Office S.C. Institute of Archaeology & Anthropology Department of Archives and History c/o Mr. Jim Spirek c/o Ms. Caroline Wilson 1321 Pendleton Street 8301 Park Lane Road Columbia, SC 29208 Columbia, SC 29223-4905 What to Expect: a) You will typically receive a letter from the resource agencies documenting the agency's concurrence with your application, requiring additional information or recommending modifications. You must address each agency's comment in your final application. b) If you do not receive any documentation from the resource agencies within 30 days of their receipt of your application, you must provide that agency with a follow-up letter requesting the agency comment on your proposal within 15 days from the date of the letter. If you do not receive any response as a result of this second letter, you may proceed with the application process, recognizing however that if their comments come in later in the application review process, you will also be required to address them. c) For the SCIAA agency the applicant must wait 30 days after receiving the signed postal returned receipt. If a response from SCIAA has not been received by this time you may proceed with the application process, recognizing however that if their comments come in later in the application review process, you will also be required to address them. 2. (For Lake Keowee only) Consultation or review is required by the Eastern Band of Cherokee Indians (EBCI) for all excavations on Lake Keowee. The applicant must submit a copy of the completed Tribal Historic Preservation Officer (THPO) Consultation Information Form (attached) to: Eastern Band of Cherokee Indians c/o Tyler Howe PO Box 455 Cherokee, NC 28719 What to Expect: a) You will typically receive a letter from the EBCI documenting the tribe's concurrence with your application, requiring additional information or recommending modifications. You must address each comment from the tribe in your final application. b) If you do not receive any documentation from the EBCI within 30 days upon their receipt of your application, you must provide the tribe with a follow-up letter requesting the tribe's comment on your proposal within 15 days from the date of the letter. If you do not receive any response as a result of this second letter, you may proceed with the application process, recognizing however that if their comments come in later in the application review process, you will also be required to address them. 3. (For Catawba - Wateree lakes only) Consultation or review is required by the Catawba Indian Nation Tribal Historic Preservation Office for all excavations on the Catawba —Wateree Lakes in South Carolina. The applicant must submit a request for comments to the Catawba Indian Nation Tribal Historic Preservation Office at: Catawba Indian Nation Tribal Historic Preservation Office Dr. Wenonah Haire 1536 Tom Stevens Road Rock Hill, SC 29731 (803)328-2427 What to Expect: Duke Energy Page 9 of 11 rev 9/19/14 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx DUDE ENERGY EXCAVATION PERMIT APPLICATION FORM a) You will typically receive a letter from the Catawba Indian Nation Tribal Historic Preservation Office documenting the tribe's concurrence with your application, requiring additional information or recommending modifications. You must address each comment from the tribe in your final application. b) If you do not receive any documentation from the Catawba Indian Nation tribal Preservation Office within 30 days upon their receipt of your application, you must provide a follow-up letter requesting comments on your proposal within 15 days from the date of the letter. If you do not receive any response as a result of this second letter, you may proceed with the application process, recognizing however that if their comments come in later in the application review process, you will also be required to address them. 4. If the excavation meets the requirements of the applicable General Pen -nit (GP 87-14-001) and will remove from 50 to 150 cubic yards, in addition to the entities listed above in PART IV.B.1 and 2, the S.C. Department of Natural Resources (SCDNR) must be provided with a copy of the completed Excavation Pen -nit Application Fonn, including the information required under PART III A -H for at least 30 days consultation: S.C. Dept. of Natural Resources c/o Mr. Mark Hall 206 Laurel Valley Road Sunset, SC 29685 (864)878-9071 What to Expect: a) You will typically receive a letter from the SCDNR documenting the agency's concurrence with your application, requiring additional infonnation or recommending modifications. You must address each agency comment in your final application. b) If you do not receive any documentation from the SCDNR within 30 days of their receipt of your application, you may proceed with the application process, recognizing however that if their comments come in later in the application process, you will also be required to address them. 5. In addition to the entities listed above in PART IV. B. I and 2, the following agencies must be provided with a copy of the completed Duke Energy Excavation Pen -nit Application Fonn, including the infonnation required under PART III A -H, for all excavations not covered under the applicable General Pen -nits on South Carolina reservoirs: (For Lake Keowee) (Foy Catawba-Wateree lakes) S.C. Dept. of Natural Resources S.C. Dept. of Natural Resources c/o Mr. Mark Hall c/o Greg Mixon 206 Laurel Valley Road Rembert C. Dennis Building Sunset, SC 29685 2600 Bull Street (864) 878-9071 PO Box 167 Columbia, SC 29602 (803)896-7767 S.C. Dept of Health &Environmental Control Water Quality Standards & Wetland Section c/o Mr. Chuck Hightower 2600 Bull Street Columbia, SC 29201 (803)898-0369 What to Expect: a) You will typically receive a letter from each entity documenting concurrence with your application, requiring additional infonnation or recommending modifications. You must address each comment in your final application. b) If you do not receive any documentation from an entity within 30 days of their receipt of your application, you must provide that entity with a follow-up letter requesting comment on your proposal within 15 days from the date of the letter. If you do not receive any response as a result of this second letter, you may proceed with the application process, recognizing however that if their comments come in later in the application process, you will also be required to address them. Duke Energy Page 10 of 11 rev 9/19/14 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM 6. In addition to the consultation requirements specified for the agencies listed in Part IV. B. l and 2, the following agencies must be provided with a copy of the completed Duke Energy Excavation Pen -nit Application Fonn, including the information required under PART III A -H, for any excavation that is part of a Commercial Facilities Application, Conveyance Application or will require FERC review on South Carolina reservoirs: U.S. Anny Corps of Engineers Regulatory Functions Branch c/o Mr. Colton Bowles 1835 Assembly Street Room 86513-1 Columbia, SC 29201 (803)253-2400 US Fish and Wildlife Service c/o Ms.Amanda Hill 176 Croghan Spur Road, Suite 200 Charleston, SC 29407 (843) 727-4704 ext. 12 S.C. Dept. of Parks, Recreation & Tourism c/o Mr. Tony Bebber Edgar A. Brown Bldg. 1205 Pendleton Street Suite 110 Columbia, SC 29201 (803) 734-0189 S.C. Dept. of Health & Environmental Control Water Quality Standards & Wetlands Section c/o Mr. Chuck Hightower 2600 Bull Street Columbia, SC 29201 (803)898-0369 S.C. Dept. of Natural Resources c/o Greg Mixon Rembert C. Dennis Building PO Box 167 Columbia, SC 29202 (803)896-7767 What to Expect: a) You will typically receive a letter from each entity documenting concurrence with your application, requiring additional information or recommending modifications. You must address each comment in your final application. b) If you do not receive any documentation from an entity within 30 days of their receipt of your application, you must provide a follow-up letter requesting comments on your proposal within 15 days from the date of the letter. If you do not receive any response as a result of this second letter, you may proceed with the application process, recognizing however that if their comments come in later in the application process, you will also be required to address them. PART V - ADDITIONAL INFORMATION (Reference previous parts as applicable. If more pages are needed, add a suffix to last page (e.g. 12a, 12b, 12c, etc.) Duke Energy Page 11 of 11 Excavation Program e:\#daren\@duke permit\c-w excavation application 11.3.10.docx rev 9/19/14 DUKE ,f, ";P EERY EXCAVATION PROJECT USER'S AGREEMENT LETTER (Please fill in the blanks. Please Print) Date TO: Duke Energy c/o Lake Services - EC12Q P. O. Box 1006 Charlotte, NC 28201-1006 RE: Excavatio For (Subdivision and Lot #'s or Other Project Name) ir- h (Lake/County/City) N C)jr1MCt1 / (If], +0 %Aj fir, (Duke File No.) Lake Services Duke Energy 526 South Church Street Charlotte, NC 28202 Mailing Address: EC 12Q / PO Box 1006 Charlotte, MC 28201-1006 (Applicant's full name) � l c-. ar ® 64orch hereby agrees to comply with all recommendations, requirements and/or conditions of Duke Energy Lake Services, General Permit(s) (if applicable) and other federal, state and local agency requirements pertaining to the application to excavate for the purpose of a boas t:I p acc es s In addition, I/we have read and agree to comply with Duke's current Shoreline Management Guidelines (SMG), much of which is repeated hearin, and understand that written authorization must be obtained from Duke Energy Lake Services prior to beginning any activity within the FERC project boundary or on Duke Energy land. The excavation will be completed as described in the approved application and within eighteen (18) months from the date of written approval by Lake Services, unless specifically noted otherwise in the application or unless I/we obtain approval for a single, time extension (maximum of one year) in writing from Duke Energy Lake Services. 1/we understand that if the SMG or other applicable rules change during any extension period, I/we will be expected to comply with the new requirements to the maximum extent practicable. I/we also recognize that failure to complete the excavation within this build- out period will require the filing of a new application within the then -current SMG and that the new application must include any applicable fees and security deposits. www.duke-energy.com I/we attest to be the owner(s) or lease holder(s) of the land immediately adjoining the project boundary or Duke -owned peripheral strip where the excavation activity is to take place, or if not the owner or lease holder, I/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the proposal within the project boundary adjacent to their land. I/we attest to be the owner(s) or lease holder(s) of the land that will be used for equipment staging and disposal of excavated material or if not the owner or lease holder, I/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the work on their land. I/we understand that all excavation work must be done directly in front of my/our property and within the third of the cove nearest my/our property or within any middle third of the cove that Duke Energy owns, or I/we have written authorization from the owner(s) or lease holder(s) to carry out the proposal within the project boundary adjacent to/on their land. I/we also understand that access channels must run perpendicular to the shoreline while within the third of the cove area that is nearest my/our property. I/we understand that for proposed excavations , I/we must notify the appropriate local, state and federal agencies in advance of the activity by sending them a completed copy of Duke's Excavation Permit Application Form and other required information. I/we understand that written authorization and/or other permits may be required by some of these agencies and such required authorizations must be obtained before I/we submit the final application to Duke Energy Lake Services. I/we understand that except for maintenance excavations, any excavation exceeding 2000 cubic yards of material removed or any excavation or shoreline stabilization work needed to support an application that requires Federal Energy Regulatory Commission (FERC) review does itself require specific review and approval by the FERC before Duke Energy can issue any approvals. 1/we agree that unless specifically approved otherwise in the application, explosives will not be used as part of this excavation activity. I/we understand that every reasonable effort must be made to minimize any adverse impact on fish, wildlife and other natural resources. 1/we understand that applicants in South Carolina proposing excavations that are not covered under the General Permit, or are greater than 150 cubic yards, must receive prior written authorization from the South Carolina Department of Health and Environmental Control (SCDHEC) or the US Army Corps of Engineers (as applicable) before submitting the completed application to Lake Services. Duke Energy Page 2 Rev: 9/15/06 EXCAVATION APPLICATION Effective Date: 11/15/95 GpaVLAKEMGNIT/Package Information /NC C -W Dredge/Escagre9.15.06.doc 1/we agree that excavation activities in North Carolina and South Carolina will not occur during the months of March, April, May and June because of the potential impacts to fish spawning areas. I/we understand that trees and vegetation growing within or adjoining the lake play an important role in its overall environmental condition, and the ecological benefit the vegetation has on fish and wildlife habitat directly supports a sound and healthy lake environment. I/we also understand that unauthorized removal of shoreline vegetation (e.g. button bushes, willows, cattails, etc.) and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests, forfeiture of security deposits and require re-establishment of vegetation at my/our expense, particularly if the disturbance is found to be in violation of state or local ordinances or impacts FERC project buffers. I/we agree that all excavated material will be placed in upland areas, landward of the project boundary, and confined to prevent erosion and sedimentation back into the lake or nearby streams. I/we agree to adequately stabilize all excavated material and all disturbed shoreline to prevent erosion and runoff into the lake. I/we understand that the double handling of excavated material will not be allowed; therefore, all excavated material must be placed above the project boundary in one handling. .1/we have designed the hydraulic excavation process (if any will be used) so that return water re-enters the lake in the same general vicinity and cove as the excavation, to the maximum extent practicable. .1/we agree that the proposed excavation will not be for the purpose of creating additional shoreline, will not alter the project boundary or the full pond contour, and will not impact threatened or endangered species, historic properties, or environmentally -important areas, unless special public entity provisions were made in the application. I/we recognize that it is my/our responsibility to clearly locate in the field and label on my/our work area drawings any areas that require specific protection or avoidance during this excavation work. Examples of these protection/avoidance areas include but are not limited to, any Environmental Areas, Natural Areas or Impact Minimization Zones as identified by Duke; jurisdictional wetlands; historic properties; rare or threatened species; and buried gas, water, sewer, electric or communications lines. I/we agree to provide my/our contractor with a copy of these work area drawings showing these areas to stress the necessary protection measures. I/we agree that if any archaeological resources (e.g. pottery shards, Indian artifacts, etc.) are discovered during the excavation, work shall be halted immediately. I/we will then notify Duke Energy Lake Services and the State Historic Preservation Office to Duke Energy Page 3 Rev: 9/15/06 EXCAVATION APPLICATION Effective Date: 11/15/93 GpaVLAKEMGMT/Package Infortnation/NC C -W Dredge/Excage9.15.06.doc determine what measures, if any, I/we must pursue to protect or salvage the archaeological resources. I/we agree that any excavation from within the project boundary will not exceed the volume as outlined in the application and will remove and disturb only what is absolutely necessary to achieve the project's stated purpose. I/we agree to be fully responsible for the permitted lake use and I/we understand that this responsibility is considered to transfer automatically along with ownership and leases of the adjoining tract. I/we understand that Lake Services representatives may issue Stop Work Directives for any violations of the SMG and that other consequences may result from such violations, including but not limited to suspension or cancellation of approved permits, increases in fees, modification or removal of non -complying structures and restoration of disturbed areas at my/our own expense or loss of any consideration for future lake use permits. I/we agree to immediately comply with any Stop Work Directives, to fully cooperate with Duke Energy Lake Services and other agencies as necessary and to perform the necessary remedial actions within the specified time frame. I/we agree to develop any required mitigation plans and to complete any required mitigation activities at my/our own expense within the specified time frames. I/we recognize that the excavation work is not considered complete and deposits will not be refunded until the mitigation requirements (if any) have been satisfactorily fulfilled. I/we agree to notify Lake Services by phone when the excavation is initiated and to ensure that during the excavation period, the weather-proof "Duke Energy Approved Lake Use Activity" sign (to be provided by Duke Energy) remains posted at the job site and visible from the water's edge. 1/we agree to notify Lake Services in writing when the excavation is completed (including any required mitigation measures) and that the excavation was completed per the approved application, so a close-out inspection can be performed. I/we have included a check for the applicable filing fee and security deposit, and copies of all other necessary permits. I/we recognize that security deposits will not be refunded if any violations of the SMG or this user's agreement occur. I/we understand that there will be no change in hydro project operations as a result of the excavation and/or utilization of the excavated area. I/we agree to maintain the work area in a safe condition and to fully indemnify and save Duke Energy harmless from any and all claims, liability, loss or damage that may arise from this excavation project. Duke Energy Page 4 Rev: 9/15/06 EXCAVATION APPLICATION Effective Date: 11/15/98 Gpal/LAKEMGMT/Package Information/NC C -W Dredge/Excagre9.15.06.doc 1/we understand that this user's agreement does not, in any way, constitute the transfer of any rights in real property and that my/our use and enjoyment of FERC project lands and waters shall not hinder the general public's lawful use and enjoyment of the same. Sincerely, "R16\CLV_d 5 +0 , Applicant's Name (Print) Lot # Applicant's Signature *Co -Applicant's Name (Print) *Co -Applicant's Name (Print) *Co -Applicant's Name (Print) *Co -Applicant's Name (Print) Lot # *Co -Applicant's Signature Lot # *Co -Applicant's Signature Lot # *Co -Applicant's Signature Lot # *Co -Applicant's Signature * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project and is done to benefit multiple owners / lease holders of project -front properties within a single development. The check for the application filing fee and security deposit should be from the party shown as Applicant and not several checks from the Applicant and Co - Applicants. By signing this agreement, Co -Applicants are in fact recognizing and agreeing to the same conditions as is the party signing as Applicant. Duke Energy Page 5 EXCAVATION APPLICATION GpaPLAKEMGMT/Package Infornnation/NC C -W Dredge/Excagre9.15.06.doc Rev: 9/15/06 Effective Date: 11/15/93 CATAYDA COUNTY 12-86-89 8257 $TATf aaRTN - $:L87. 0 0 V' RealEstate ExxciseeTax BooK 2239PAGE 3207 FILED RU i I1 ", 0KIE RNI OEC 6 PIS 1 19 (iECIS ' "' DEEDS CATAW0,1% W., N.C. Filed December 6, 2000 at 1:19 P -M. and recorded in Book 2239 Page 327. Recording Time, Book and Page Tax Lot No.: out of Parcel Identifier No.P/O 4628-01-08-2779 Verified by County on the day of . 19 by ✓ Mail after recording to Grantee This instrument was prepared by Crescent Communities ry c ine.tu.yauer) Brief Description For The Index: i32445 LOT(S) 103 PI-IASE E No )1TF(V1EWARBQUR SUBDIVISION N� NORTH CAROLINA'y, £CIAVWARRANTY DEED THIS DEED made this fourte�ent day-I1Vovember, 2000, by and between -n GRANTOR v GRANTEE CRESCENT COMMUNITIES N.C.. INC., I RICKY S. STORCFI and wife, a North Carolina corporation -TAMARA A. STORCH RO. Box 1003 2591 CLINTON STREET Charlotte. North Carolina 28201.1003 ATTICA. NEW YORK 14011 The designation Grantor and Grantee as used herein shall include said parties, their heirs. successors and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in Mt. Creek Township, Catawba County, North Carolina and more particularly described as follows: BEING all of Lot(s) 103 phase 2 (the "Lot") of NorthView flarbour Subdivision (the "Subdivision") as shown on the maps thereof recorded in Map Book 51 at pages 164 and 165 in the Office of the Register of Deeds for Catawba County, and any amendments or supplements thereto (the "Map"). and all and singular, the rights, memberships. hereditaments and appurtenances to said Lot belonging or in any way incident or appertaining. including but not limited to all improvements of any nature located on the said Lot and all easements and rights-of-way appurtenant thereto. and being a portion of the property conveyed to Crescent Communities N.C., Inc. by deed from Carolina Centers, LLC, and Crescent Resources, Inc.. recorded in Book 2157 at Page 1060 in the Office of the Register of Deeds for Catawba County. LlW al J BOOK 2 M ME 3 2 $ This conveyance is made subject to (and is conveyed together with, as the case may be) the following easements, reservations, covenants, conditions and restrictions which shall run with the land and be binding upon Grantee and Grantee's heirs, successors and assigns. Nothing heroin shall be held to impose any restriction on any land of Grantor not hereby conveyed: 1. All easements, reservations, covenants, conditions and restrictions of record, including but not limited to those easements, reservations, covenants, conditions and restrictions contained in that document entitled "Declaration of Covenants. Conditions and Restrictions — NorthView Harbour', recorded in Book 2178 at Page 1868 in the Office of the Register of Deeds for Catawba County, as may be supplemented and/or amended from time to time (as so supplemented and amended. the "Declaration"). 2. By accepting this deed Grantee signifies his understanding that Duke Power Company has certain privileges and easements affecting the property hereby conveyed which include the right. privilege and easement of hacking, ponding, raising, flooding or diverting the waters of Lake Norman and its tributaries upon and over said property. as more specifically described in instruments recorded in the office of the Register of Deeds for Catawba County. 3. By its acceptance and recordation of this deed, Grantee acknowledges for itself and its successors and assigns as follows: Duke Power Company controls access to, use of and water levels in Lake Norman. Grantor makes no oral, express or implied representation or commitment as to the continued existence, purity, depth or levels of water in Lake Norman. or the continued use of any dock, pier. boatslip or similar dock facility, and Grantor shall have no liability with respect to these matters. Grantee must receive permission from Duke Power Companv (or a,successor manager of Lake Norman under authority from the federal Energy Rcgulalo►yV Commission) prior to placing or constructing a Fxratslip. or an, related�ptcr. st c Oji or other improvement within or ,�¢La;? upon, or conducting any activity alt ring)he iopograp y of, the hydroelectric project surrounding and encompassing t1teaters'ni�akelrman. Grantor makes no oral. express or implied representatRA or commit cnC as to the likelihood of Grantee obtaining such permission. i. 4. Sewer. ,voter, electric. gas. telepho cahle,,teiei•ision and other easements shown on the recorded plat of ther�+ert,y as othrwi a world be disclosed by a current, accurate physical survey of th ,i+ropco ,„ r 4p SP Y 5. By accepting"tEjts deed("rranleBcknowledgcs for itself and its successors and assigns that Grantor. the' _ rty. owners association established under the Declaration, and/or the developer, and/or c' n governmental or quasi -governmental agencies, has or may have the right to construct, install, excavate. dig. build. maintain, operate, remove and reinstall septic lines. pipes. and related equipment and apparatus in and upon the road right-of-way located adjacent to the boundary line of the Lot conveyed herein. Upon request of Grantor. Grantee for itself, its heirs, successors and/or assigns, hereby agrees to execute any enroachmeni agreement required by the North Carolina Department of Transportation (N.C.D.O.T) prior to N.C.D.O.T.'s acceptance of the streets for maintenance. TO IiAVF. AND TO HOLD the aforesaid Lot and all privileges and appurtenances thereto belonging to lire Grantee, Grantee's heirs, successors and assigns in fee simple. And said Grantor covenants with said Grantee that Grantor has done nothing to impair such title as Grantor received, and that Grantor will warrant and defend said title to the same against the lawful claims of all persons claiming by, under or through Grantor, except that this conveyance is made subject to the casements• reservations, covenants. conditions and restrictions set out above, or of record, and to the taxes for the current year which Grantor hereby agrees to pay. iN WITNESS WHEREOF. Grantor has caused this instrument to be signed in Grantor's corporate name by Grantor's duly authorized officers and Grantor's seal to be hereunto affixed by authority of Grantor's Board of Directors, the day and year first above written. n4tW.ol Lla: CH ow 2239puE 329 ATTEST: CRESCENT COMMUNITIES N.C., IING.41"1111 h! 11 f I ,'I, e North �" tion `' Assi Z ITS: Vi It 94 [CORPORATE SEAL],, STATE OF NORTH CAROLINA � �''�1•rrnnrr"" COUNTY OF MECKLENBURG 1, Debbie J. Bauer, a Notary Public for the State of North Carolina and said County. hereby certify that James L. Page personally came before me this day and acknowledged that he/she is Assistant Secretary of CRESCENT COMMUNITIES N.C.. INC., a North Carolina corporation, and that by authority duly given and as the act of said corporation, the foregoing instrument was signed in its name by its Vice - President. sealed with its corporate seal and attested by him/her as its Assistant Secretary. WITNESS my hand and official seal, this thfourteent day o ember, 2000. otary Pub1 My Commission Expires: July 15, 2001 [NOTARY SEAL] STATE OF NORTH G CATAWBA COUNTY The foregoing certificate Carolina is certified to be RUTH MACKIE. REGISTER OF DEEDS aw 4�`a Notary Public of Mecklenburg County. North 6th day of December ,2000. 1140W.0t ua: CM .a 3279-0689 FILED CdOM8 CGU* on Mar 02, 2015 at 02:27:00 pm BtclSe Tai $2340.W (AT) nw. v03205 00UNA MCRS SMCER, Rte of Owe Ek 03279 P90689-0691 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $ 2.340.00 Parcel Identifier No. Verified by County on the _ day of 20_ By: Mail/Box to: The Jonas Law Firm, PLLC, 2279 North N.C. 16 Highway, Denver, NC 28037 / -/ FW. ErrAQ This instrument was prepared by: The Jonas Law Firm, PLLC , 2279 North N.C. 16 Highway, Denver, NC 28037 Brief description for the Index: THIS DEED made this 26th day of February , 2015 by and between Michael L. Hamby and wife, Richard E. Storch, Jr. and wife, Cheryl L. Hamby Esther R. Storch 3654 Brooks Lane 900 Chesterfield Dr. Terrell, NC 28682 Napoleon, OH 43545 Enter in appropriate block for each Grantor and Grantee: name, mailing address, and, if appropriate, character of entity, e.g corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. �-^.�, WITNESSETH, that the Grantor, fora valuable consideration paid by the C3 n"e.ithereceiptofwhichisherebyacknowledged,hasand by these presents does grant, bargain, sell and convey unto the Grnnteiti fee sMple, uw t certain lot or parcel of land situated in the City of Mountain Creek ^s Tow�i, iS, atawba County, North Carolina and more particularly described as follows: f a✓'' �'S, ;4' '',Y y, 4 See Exhibit A attached hereto and incorporated herein by reference'# The property hereinabove described was acquired bytontor by instrument recorded in Book 2523 page 573 All or a portion of the property herein conveyed X includes or _ does not include the primary residence of a Grantor. A map showing the above described property is recorded in Plat Book 16 page 12 NC Bar Association Form No. 3 ® 1976, Revised ® 1/12010 Printed by Agneemenl with the NC Har Associmion 3279-0690 Richard Storch, Jr. Esther Storch 3654 Brooks Lane Terrell, NC 28682 Exhibit A All that certain parcel of land situated in Catawba County, North Carolina and more particularly described as follows: TRACT ONE: Being all of Lot No. 75 in Section 30 of Crescent Land and Timber Corp. Subdivision as shown on map recorded in Map Book 16, at Page 12 in the Office of the Register of Deeds of Catawba County. TRACT TWO: Beginning at a #4 rebar, the common corner of Lots 75 and 76 in Section 30 of Crescent Land and Timber Corp., Lots as shown on map recorded in Map Book 16, at Page 12 in the Office of the Register of Deeds of Catawba County; thence a new line, South 42°18'48" East 2.81 feet to a #4 rebar; thence with edge of Lake Norman, South 52°40'27" West 105.75 feet; thence South 19°25'10" West 41.49 feet; thence South 86°49'05" West 41.66 feet to a #3 rebar, the common corner of Lots 73 and 75 of the Crescent Land and Timber Subdivision, Section 30 as shown on Map recorded in Map Book 16, at Page 12 in the Office of the Register of Deeds of Catawba County; thence North 18°26'00" East 69.56 feet; thence North 49'52'00" East 150.78 feet to the point of BEGINNING, containing 0.102 Acres, more or less. TITLE REFERENCE: Book 2523, Page 573 Catawba County Registry. " "N' f ti 3279-0691 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. �� And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in of e simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: Valid and enforceable restrictions, right-of-ways and easements that appear in the record chain of title. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year Arfirst above wrin SEAL (Entity Name) PnnttType Name: 1, ichae L. Hamb By: l SEAL Print/Type Name & Title: Print/fyp ame: e 1 L. By: (SEAL) Print/Type Name & Title: PrinVl'ype Name: By: PrinVType Name & Title: PrinuType State of North Carolina - County or City of Lincoln 1, the undersigned Notary Public of the County of Gkyr ofijtvtcoin and State aforesaid, certify that Michael L. Hamby and wife. Cheryl L Hambv.�,TAt 7''. personally appeared before methisdayand acknowledged the due execution of the foregoing it"'W m for the p ;4therein expressed. Witness my hand and Notarial stamp or seal this 26th day of Feblvary RC1 z My Commission Expires: March 27.2016p U ev ;: Claudia E. Talbot Notary Public (Affix Seal) '',/l� _ �a,; Notary's Printed or Typed Name State of -County or City of"" I 1111 '" I, the undersigned Notary Public of the County or City of and State aforesaid, certify that personally came before me this day and acknowledged that _he is the of , a North Carolina or corporation/limited liability company/general partnership/limited partnership (strike through the inapplicable), and that by authority duly given and as the act of such entity, _he signed the foregoing ins! ent it its name on its behalf as its act and deed. Witness my hand and Notarial stamp or seal, this _ day of � 4r .. ',­'. 40_ My Commission Expires: rwi Notary Public (Affix Seal) Notary's Printed or Typed Name State of - County or City oft \ ` * :'1/ f, the undersigned Notary Public of the 60`r-ityor City of V and State aforesaid, certify that Witness my hand and Notarial stamp or s6t':wthis a- day`Afj� , 20_. My Commission Expires: Notary Public (Affix Seal) Notary's Printed or Typed Name NC Bar Association Form No. 3 0 1976, Revised® 11112010 Printed by Agreement with the NC Bar Association .n.CAKO - N.tUeunc couNrr • L.:w o<+ober T5 Iao,apo 44 91 •IMTM Gum.. / FrC{�D � 1K11 �`IA�i LIN(PLN ,. _ ,_ .. - AL.BexT M•LVERLY _Z3 ill LOT 93 'hu o d r ll�• 0., ACREI. m- I PIN w n� '1Il 546 002 W 5I .7;0 > - mN . I. PIN NORM PN LPK� NAY„ (�NRD C AT A w ISA C�Je1 JJ7/< q� �•�� v a Sa Am LOT 94 0.67 ACRE w ` IN X- A=31: 3-7.44 a .i 'o yc.95, Fs ' LOT ACR95 �0. 74 E � J. /- \ e v 'A 9 gpp�G� 3 y 400y ,y0, '• i ST 'h v ry04D •33�.ii • 0 � gOgp S3?F4�9. 75, �'gRcyM • �0• DR7�F CONT. ON DWG. W. C. F. 30-8 SCALE: 1- 7 2 ---- 30 . /(: 4,00<Cp \ •�S 8"S 0 �O< POOLE 0 g9 9�i F9 LOT B9 E 0 69 ACR Ip N Q BEARINGS AND DISTANCES FOR LOTS ON CONTOUR ELEVATION 760 LOT 97 I. N78942'E-50.2+1 LOT 86 46. S62s47W-25.50 LOT 77 82. N66°24'E-41.76' LOT 72 107. N49s18'W-60.13' 2. N139222'E-57.91' 47. N84207'W-43.08' B3. NB5,206'E-80.00 IOB. N52s15'W-131.75 3. S612 3'E -57.-i5' 48.'72227 W-35.02' 'W 84. 553s 35'E-18.17' LOT 71 LOT 96 4. S52258'E-33.54' 49. 549e 5 -43.H 7r ¢ 50. SBI -48 W-32.93 85. $60s34'E-24.52' Bfi. SO o46 E-31.62 , 87. 541-53 W-21.93 109. N48256'W-IlO.lfi IIO. N45s45W-55.00' 5. 572s06'E-115.01' S. S66253E-32.32' LOT 85 51. S26221'W-43.57' 88. 519257 W-100.0 69. 530432'W-71.81 III. N3B?41'W-56.07' 112. N59901'W-67.14' LOT 95 7 N23257W-39.95' 52. 526s42'W-35.00 53. 536200'W-20.40 90, S3s38'%!0.62' 91. 539207 W- 27.35' FROM LOT 71 TO LOT 69 11 N71239E-8.30 54. S26242'W-59.25 LOT 76 113. N59201'W-9.02' S. N52sIB'E-21.19' 10. N71235E-20.00 LOT 84 55. 530s 30'E -85.Ifi 92. S6226'W-25.00' 93, S68256'W-27.73' 114. N16 -20',W:116.51' N54s5W63.71' 11. N86211'�i52 5' 12.'54250 E-20.80' S6, 573240E-39.05' SI6296'E-13.60 gq, S30210'W-30.81 115. 116. N80209'W-9.87' 13. N6248'E-25.31' S7. 58. 554246W-16.01 95. 556248'W-25.71' %. S31259'W -30.60' LOT 69 14. '7230 W-44.01' \� 59. S23255W-50.00 97 S47240'W-65.94' 117. N80209'W-25.11 \\ LOT 94 15. N0240'E-67.22' 60. 523255,'W'-37.34,' 61. S59255,W-48.24, LOT 75 IIB. 589207'W- 85.84 76.07 119. N73245W-76.07' 16. NI2236 E-151.93' 62. 521226 E-22.58 LOT 82 98. S49252'W-150.76' 56' p %. SIB26W-69. Dq LOT -1 63. N821226'E-22.55 �oq1; 17. N24201'E-162.38' 63. NBBs20'E-157.20' LOT 73 LOT 88 3 ,1 IB. N66206'E-52.61' 64. S33247'W- 5.00' 100. S4122BE-65.00 - 0.71 ACRE 19. 569213'E-26.29 65.590239E-4O.0O' 101. 513259�E-80.11' 66 S20°O6'E-42 72' 102. SI7s22 W-35.56' LOT 87 0. 75 ACRE S /N4 y3Sf� 0. ggT B6 ACRf � 0 0" es 4 ACRf AII; ^1 J 30 ACRES W 2:8; ` ^�� 1 A- 2 Z APIN 47'W R=NS e 64 7 18.00' RN12B.54, R"57G' A lC 46 I L y 02 A,g6.6�0 CV F •e? a 'mss 6' aaa S3 a� 9pPF r J\v- 20.S57el5E-23.86, 'P c 703. S472004-90.00`21. S26255'E-85.1267. S59 33'E-46.32' 72. 514141 -30.42' LOT BO 104. 573216 W-59.39' I PI 123.520"03'W-45.84' 105. N74237'W-54.23' 1.01 , ) 68 N79 s41'E-35.90 106. N41248'W-86.68 „A- •l LOT 92 69. N46221'E-80.05''} f/ 24. N58230'E-27.73 70. N71143 E-70.25' 25 N79215'E-35.13' 71. N83220'E-49.22' 1;' 26. N72250 E-50.99' LOT 79 '�1 o w LOT 77 •il, I 2l S55250E-32.65 72. N72258'E-41.48' ' o� 0.77 AC 11 f 28.585-03E-21.32' 73. N41257E-51.92' X60 z. _ RE Q \I' LOT 91 74. N76202'E-47.43' 29. S52214'E-55.23' 75. N57s3 E-30.00 yi4• •�11. 30. N66° -00E-129.55 76. N11 -o 1 E-29.00' P ob' 77, N82"49 E-21.11 i% J zzr, 3 31. S89 -29'E -32.31' LOT 90 LOT 78 Q` j �� P%0j3 / ••� 32. S76213'E-80.90' Te. N84s29'E-15.52' O �� S4 •: 84' 33. S282 I'E-37.73' 79. N7O222'E-140.01' �. OLOT 7 ^ 2 34 EC 34. S22250'E-72.04 80. N60205'E-60.82 �; •6'3 AC8 °m 77b�k4e N 35. SI210'W-94.70' el. N72209'E-87.74' j of �J SANE << LOT 89 36. 55213'x-130.33 37. 58246 W-51.68 /jy W�/e Jg4,p �0.6T T6 0 LOT 88 /'� 22/ �W r4CRE 38. S0256'E-51.00 ///� e 'p 39. SI9207'W-65.77 //%/'`p`V 4.0y. yOj / I 40.SI0223'W-72,86' /I,l 0 OT T - CP 2s BEF LOT 87 / ��0 . j4 4; S9 49' 41.S45204'W-55.45' Rf ^• •a / P/ry / 42. S52244'W-46.58' 43. SI5222 W-49.77' %/ 1 ,�4' 0' "�I LOT �1 45. 574222Vt-215.75' :y '9623/ W_18�.39 P I. AOReg 1. /,. �• � 4 0� L P7p _ / I)f' v L %�. 9T ACRf 80 gro 5 4` �.- w m \ z •I i% /�` �'. �p " mw :�o'}I.Iryp / �6 ���d��, //Ah• h,y0°�JA =..t9 7.. P\��IIN N0 .4PIN R`70. 0' 0 � ✓ _ 9 50.01`P h1 N Js 6, 241 411 S47 ! p 2.5"' : 201.00' q 2E ! Ng7e' r4 !A 0.67 ACRE a e /a" .S $ 3?s4, \ \/p4'p �J�,` / �N 38.85 4_3g r9L49P<aJiaNp`•�-/? rr5s-_6L_ 8A�R.0.R.M�O- _"-\1569Oi�_ p/_9Pppp2(y !1N \7i6r �\�\\_a_�0•��68fO3�) 40 ACRT 7-1 0T 9157 E304CRf3 ;7 0 11 06ACR i f 2ro NORMAN 67 I NOTE : ALL STREET CORNER RADII ARE 20 FEET. PROPERTY LINE DISTANCES ARE COMPUTED TO POINT OF INTERSECTION AT STREET CORNERS, DUKE POWER COMPANY TO CRESCENT LAND B TIMBER CORP. DEED BOOK 947, PAGE 632. MAY I, 1969. BUILDING SETBACK LINES ARE 30 FT. FROM ROAD RIGHT OF WAY LIMIT, 50 FT. FROM CONTOUR ELEV. 760 U. SrG. S. SEA LEVEL DATUM AND IS FT. FROM CRESCENT LAND S TIMBER CORP. LAKE NORMAN MAP OF RECREATION LOTS SECTION 30 LOTS 69, 71-73, 75-80, 82, 8, 84-97 MOUNTAIN CREEK TOWNSHIP CATAWBA COUNTY, N. C. SCALE: I" = 100' AUGUST 18, 1975 MISC. BOOK NO. 298 DWG. No. C. F. 30-C 0 100 200 300 400 SCALE IN FEET 7o P, 16-/2 P H earth 40 -ft wide with %required slopes Dredge to 10 -ft at full pond 70 -ft long with required slopes Rick Storch 3654 Brooks Lane Terrell, NC 28682 .1,t CD m a4 q r: I 7G cis DUES ENERGY DIRECTIONS BY ROAD FORM Lake Use Permit Applicants and Contractors: Ease of locating the proposed project site canhavea big impact on permitting processing time. Please complete this form and return it along with your completed application to: DUDE ENERGY C/O LAKE SERVICES — EC 12 Q PO BOX 1006 CHARLOTTE, NC 28201-1106 1-800-443-4193 or Option 5 Applicant's Name: :B I C , � S%rCh Street Address (at lake): L�(D 54 3cnn K5 Lone, Lake Name: Afo ry n axi Subdivision Name: ! V a r'' �b V I eyV �ar hnU✓' Property Section: 2hase It Lot #: 175 City: 7P_ rye I I County: (a 7LCtyy ba State: NG Zip: 296) gZi Telephone: 41q- 5-7 ,15 Directions (from major road or highway): 1-17 JVorf-h, yurn /CO- m IVC- I 5 W `Turn l e Ff- on fD Gr-eer, woad 7�d , 7ioa d -�urn,5 r' h+ -an d becomes Gov- on 5+ I� -P 0-WAO Le I-ar7d 7,Dr;ve� b.a-� pn W 4ery ieW ,. Ie fy ova to 6rpo�s &ne . Descry tive Structures on Property (i.e. brick garage, white fence, mobile home, etc.) ul Dne- S vis te, l e-ve � h0nie, on1�-�-- *Note: Please use the back of this form if desired to draw us a map to the site. USGS science for a changing world 81'00' T30" .20OOmN 3941 3940 3939 3938 U.S. DEPARTMENT OF THE INTERIOR U. S. GEOLOGICAL SURVEY 501 "OnmE i '02 '03 57'30" '04 The National Map US To p o '05 506 All, Se" -- - ------- �- ly 1-'d50—� o�jrrills �ord,' L -J "W " J, Pit - lilt A, It T ------ - ---- T. ' r 2!� 900-1 *"64 ti , 2. "T) , A&I 4 vv 1< amri TEAM_PLANT I 1 ��GO1 'y RD Boo 4 if )h` 7--i ft m C V�l;fit -7 liti hill. r - 7U: AAR�HAll t,?�77- 7i iER DR- A "A v'�- 'A\ b' , 41i 850 -REID 'T c/Z451 i '-9 f J. .3,v t Terrell T, 8501 A; J1 -S� Lake-��- \z' List of Names of Adjoining Property Owners Excavation Neighbors James E. Crompton, III 3636 Brooks Lane Terrell, NC 28682 Ralph T. Hays, Jr. 3757 Waterview Lane Terrell, NC 28682 Disposal Neighbors Harold Edwin and Cherie C. Stutts 8585 E NC 150 Hwy Terrell, NC 28682 L4 M 2 POOH v ROOFrFIED MCN U FIELD YE16Y Yfl6Y AM d JO m NMODD OELD �-a 10� _ q � OV Z „Z y 31 LBM Nlll ql CpPoLIE it i "5 L Ir0 maw � �rc lJ ELEVATION = _�• SCALE: 3/16•=1'-0"J;F epn LOCATION PLAN �.,. SCALE' 1'=50' TTT ALL PROPERM PROJECIgN LINES ARE ESTUNUTD a OWXEN 5 RESPONSIBLE FOR 1/S RNE COME. 20' OEEPRWECiIOX LHETOTHER OUCWPLY MIH ALL pNEN POWER AND COUNM1 REGULATIONS. OWNER 5 iO L i USE SURVEYOR TO PROPERLY tO(AOE PIER M ,{ B MEET COKE ENERGY AND CWXtt REGULATIONS. p = f O• tl a UAT-T. 11 H.M.. s6 W 4311 RICK 510RCH 'as �� _ . ®PPXE TO NOLM 3654 BROOKS LN. �\ 2r OR X0 CATAWBA COUNTY, NC RY�f\y . "'A ■ ROLE BRM MCR `ry �J\ Oaa \\ W PUO'YEWIUL SRU1 O sl9' 27 alw I R 2K SXIA R TRE DS 9' \ \ S8V PI 3MI0 SiNR 51MNLR5 •Q a a2 W .. �� EE■Fj' n mo' ewo ewRo RISE NO DREARR RNAN BY O �'bk K" A X10 I/2' DAILY,BMfi E iREN ND1M Np IF55 9" RTRT STAIR DETAIL �a�r+e SCALE: 3/8"-1'-0" . . . � p O p i _ l0 19-II' y W._O. N 10'-0' lo'-o _ _ ID'-o' ID'-a• 7 NEW DOCK Y NEW PIER = 2 N o a YNx$� aWy �,•_D• LAYOUT PLAN SCALE: 3/16"=I'-O" J -W V SEE OE3NL S-2 l WWs SFCIICN TMI Bars 10 / \ / rr/ J. I RIE/ '(2) m w._RRe 1/2No r wLv. eoLrs I I z e 1 \ SEE OETUL� 3 CH. y' Z / SOUIRF B0.1Cf N LCE JL° � � wa B' G TYPICAL ELEVATION z 0 SCALE: 3/8"=1'-0" 5 7 �No S-2 9 h3RL aR c o ry.rh aowLlE B. R� m �° 6hUE .O eS 9 A' } M, RN. q SECTION THOUGH PIER slE REs Y b 1/2" rxv S-2 eals SCALE: 3/8°— 1— 1 =0 b 2 5-2 SEE DEENL NJIE: SIRNCIIMES CROSWIpS IE141X LoW.ER - MW 6" RLL/ B[ HJiCNFO SECTION THOUGH SLIP - W R 2.10. M voi cai SC, LE: 1/2"= 1 —0 m' -B- B -1/z' wv. eoLrs lo'-o'c 3 2C..MH ax FIL5C[ M YRLS C l{° / 1[1N PR WIOPK 1/3•G V, 66'-0' DECK FRAMING PLAN g SCALE: 1/4"=1'-0" W B" VIES W/ 1/2-ruv. ears c6osswn w O C 3X]XS' 4Ri[ 1/4' 116[R W/ GILrs g Y V:• Exv, cwnr.E ears B' na W/ a S 1/3' GYv BOL B' RLL n� e - HANDRAIL DETAIL S-2 SCALE: 3 4. 1 -0 .,....... yy y� La_ yw y tC tlV{' '. �u a uJ BOARD WALK FRAMING PLAN 'p51 "a`ER OMAIN TO FINGER CONNECTION U c yVj i 5 SCALE: 3/8"=1'-0" S-2 $GALE: 1/4"= 1'-0" 3%p'/Is 4 FINGER CORNER ;y ryKla- ,= S.2 3. - SCALE: 3/4*- l' -O' ' ` °'b�"' PI EMB" PoSl BEIMOIR�6 INNSFUNEDDIE SUPJCRT ES LOWERED BY WNUFACNRER CABLE GWWS F6T41ED PER WMIF.LCTLR[ SPEC EqR: STRUCTURES MM CRESELEADS LERGp LpIBER THIN 6' 1 1/ THE S NTCIfD 11/2' OR EK I. PE 21f10' MM 3-1/2' pNV. BAfi OF S3`pT STDNGERESERS B RWNO AT PILES (POP; NTE: STIRS YU PUIECPY WY NEED TO IX VfAECD IN ME PEFO uq . NEED IhVSTEEIR OE[RNC SCREN IR FASTER E TO EASINC. TO AT SEE IXIX fPIDMG NN! 13 ROOF BRACING DETAIL ��SCALE: 1X= 1 =0X c 0 - NOTE: BETCD P41S SETTLED NOT DOME IN _ gKM CCMACI x1M ACO PRESSUFE TREATED LULHR, AgE1ZX:M PY1S WIIM 1 BOXPOOR SOON AS ICE ND WATER SHEID. FOREVER TAPES. FAWBD AND WATER TROOPS LHM WATERED. BVNEA WARRED EARN ns PAPER OR BEEF ARE NOT IECIY(xCW. WR CALVUUEE PINES IFF NET RECCYrtMED. CONIRACLpf -UST INSTALL PANS PER WMFACRRE MIS NED RECGMEWD4N5. FROSTBITTEN TNryM1P1 RB IXTTW OP THE PINS IFF IDT RECCYEEI[fD. PI BTt POST CIMxOT PASS BETWEEN WHEN FORCE 5 IPPNED — DECTWG 1 3112' qR FW 2-N]. I BE 2T12' S19. BE/ I/2- GLV BUL3 2-1D. 1 FI 21 S9, W/ 1/2' GUV. BOLR — 10 DECK DETAIL S-3 SCALE: 3 4 = 1'-0" (— SECTION THRU DECK DETAIL SCALE: 3 4 = 1 —0 P1 6M6ENYiI G KlMK11Wlf C4% I/2- GLLV. &Y15 CBL 2X8' &JD HAPPIER MMB TE HEATED ORDERED X ET EMIxmINBUndxi DUE AND sxSHALL PRESSURE AIR PNESTOR E ALLRULE SMALL MA xREARDINACCORDANCEWITHWIA L PLLf WRD FRAN AN W WERE TO BE SSA NO.I OR SETTEE ROOF iMMI XL LUM AN TO IS X0. E. (I VIDE Y.1. wxXFCTW IF. N. FBI ENTE AND PHILIPPINE wXUEKrv9R WAVE LNDERTEO III MIXIRUM XO Far CNVPNIIIO 'A. FEWER R WA IR WnX TNNTN WWD YICUW WXWAM TO THE FgUDSWUNi.LiMSF.wWAm MFMA15]IEMPOIaPFA5TtNFRNCUF5)PO EPPORXX DDESIDrNTON Gl Sl TwPmONN T DIDEFHW )I. STAINLESSSTEELFASRXpSAXDTIONN TMSARE REQUIRED FM P.IlT WOR ENRON TV wwou OTHER ROSE EAETUPOB APPOSITENESS SOFT AS OFFENNING UVAQU OL I WBRRpPoW&. FT.B PBS . ANDHAROwBAE ASIN[CMNpDp WE THE—UFB[1Mp THERE PAY BEADDITIONAL [FS IOmp THAN STRULFSS STEEL OR HOT .1 ¢FOIWxICPMFSW IIBUFMU5EVx1XAF HARDWARE XOIAESER XOWwO RUDER �ISULF M ITSVproEIR opUCTSV WITH BAD PREFERRED WORD ux! VALE iM RECOMMpOBTI UP F MSU-MpBMX15 XACC IAbGNDwwCOLOR ANN WHERE THE OD IT"INU WAI NIpRETAn BELOW W'P(CNNX0005 1:Nv 'PORTLAND.MgSTWfCONTENT ,THE 1[XFORMPN[[MFASTfXFRS.nPROWPRFPRO COURT MF1IL BE CUTTER DBL PT 2XIY B' RIES 111SECTION THRU DECK DETAIL \S-3_,/SCALE: 3/4"= 1'-0" TED wood SHOULD BE BARBARA TO THAI NNUEWA ,N UNTWV DWmo. MIR -PLM. LITH EN.1x E-F.T FpTrN. wlm A WA ru5mw wow SELS ER MATEPADBOTPp SIU PnL R BARON AAF RECOMMIX FXO TO PREVENT DIRECT RACE (ED AT THE 8 1 TO 4 CODES FOA USE IN EX piOR BELLGnOXS. RFWx01E#M THE SELL THAT, MED NO IN ENR. mxxeCTlOx W, WHIMOPEC IN WATAD EST VIDEO ULA. 6 PSTR wAIWELEDTiERLD TO`r MME VAX 'HE POIn ME BUFFERROSETO CORPOREAL ME WOOD FUEL EST NO SURE AN CIA. PILES SHALL BE AT IEPn 6` IN OIINETFR. 8 PIERS OR PILES SHALL AT HERS TALU D IN SUCH A WARNER AND ANNOUNCE AS TO NAA` PRIOR DAN OR ENHANCE TO RUSS RAT ING M NEEDED M PIRpiT IN INCE IO THE SEEN I THAI ALAN PROPORTION OR FELPS THE PREOCCUPIED PATI 41HE ALLOWABLE CWNFSLAT L0.1U 0x ANY ARTS LUY BE@ RRM`xED IF THE REPUTATION .1 AN REBUFFED OPINIONS PROADEAROF[HE BUT HOT LYJLN BE SEARCH TO REFUSAL OR A BARRENVEBE.I[FOTIFA5TAR.TTO Pp ULQW p5 FD M A..TV WOLXT OF YUB PND MC SM.IIXI W.ITNU LL NTMM N VE ANL "PR"PROWLIDH COLO WRMEO STEB MFF] LER WIIX VHAwEXDDN. YLMUMVFTW "lV REFE( S,AMIx1MUMOFe' VLFULL IIXINTHFFURMERWSIwRXp O1.1eITFNI.W llVFIIFR A.UFFLATFA.EADED NIXD THE RONllFLTOML OPERA Mq WECXOX AXD MEm. S rcFw EACH SIDE H E MF A r IN FRIISTABLE POI WRXO� AHNERUULT I SNML BE B1wDELFVTED ON Utx RUSSIA TO gpHT 1XNMALSp Ll CUP ERIPUB A NOIXIMUMOFOIll1 FULL GIXXIXLATTHE WTp1bSTFYrtxSXM'AxORTExdxL TO V[TO IONNORBA LURE US CARDBOARDS LOAD ONTO AS NO<MRXTM1p Ld11 BOMOVULMINOIIEE£ NHOI%Op IXAN SCREW i q VB:1/I CREEP WIYL THERE BE 0 ryp TBP WMFR FEED DRIP PAN ATTACHMENT DETAIL SCALE: NTS 0 JO' -]j- *�/2 TOJ-W' 14 DECK DETAIL s-3 scALE: 3/4'= r -o" 15 ROOF BRACING DETAIL o _ S-� SCALE: 3 4= i -0 oBl yr 2xB nn91 �Yl �? Mlv. p6 grmnW ra SUB -ROOF FRAMING PLAN3-4 SCALE: 1 /4"=1'-0" r 9116 PROOF BRACING DETAIL W -y- Q <) SCALE: 3/4"= 16 ROOF BRACING DETAIL SCALE: 3 4 = 1 -0:— O- 2X10' 2XB' COWR TIE unu y ml <2XIOl' ETA T M 2W RIfIEW b. E wel 'w R 2x10- N ri 6 rN Q roR w a J-rl zxB' � ROOF FRAMING PLAN e _ ? oSCALE: 3/8"=1'-O" e'w2 B °� 0_� ? W :O' ¢a ..,...,..... x 6 S-4 1 3 R hB 16 Wl .x.' PoSi Bo StwroWr plot[ 15 s-4 s PT •-------1vii�l��vi� • a - I 2.e •-------1vii�l��vi� • a - I