Loading...
HomeMy WebLinkAbout20240435 Ver 1_Calebs Creek_impact_mitigation_tables_20240506CALEB'S CREEK WETLAND AND STREAM IMPACTS REQUIRING MITIGATION Wetland Impact ID Impact Type (Perm/Temp) Impact Area (ac) Mitigation Ratio Proposed Mitigation Impact Exhibit Sheet W1 Permanent (Fill) 0.24 2:1 0.48 C W2 Permanent (Fill) 0.06 2:1 0.12 C W3 Permanent (Fill) 0.05 2:1 0.1 C W4 Permanent (Fill) 0.3 2:1 0.6 M W5 Permanent (Fill) 0.17 2:1 0.34 P W6 Permanent (Conversion Utility Line) 0.02 1:1 0.02 W7 Permanent (Conversion Utility Line) 0.009 1:1 0.009 W8 Permanent (Conversion Utility Line) 0.03 1:1 0.03 W9 Permanent (Conversion Utility Line) 0.03 1:1 0.03 W10 Permanent (Conversion Utility Line) 0.02 1:1 0.02 W11 Permanent (Conversion Utility Line) 0.01 1:1 0.01 W12 Permanent (Conversion Utility Line) 0.03 1:1 0.03 W13 Permanent (Conversion Utility Line) 0.03 1:1 0.03 W14 Permanent (Conversion Utility Line) 0.03 1:1 0.03 W15 Permanent (Conversion Utility Line) 0.01 1:1 0.01 Wetland Loss to be Mitigated 1.03 ac Wetland Mitigation to be Provided 1.85 ac Stream Impact ID Impact Type (Perm/Temp) Impact Amount (feet) Mitigation Ratio Proposed Mitigation Impact Exhibit Sheet T1 * Permanent 50 1.5:1 * 75 A T2 Permanent 95 2:1 190 A T3 Permanent 75 2:1 150 B T4 Permanent 75 2:1 150 C T5 * Permanent 75 1.5:1 * 113 G T6 Permanent 75 2:1 150 H T7 Permanent 80 2:1 160 H T8 Permanent 140 2:1 280 H T9 * Permanent 75 1.5:1 * 113 J T10 Permanent 75 2:1 150 P Stream Loss 815 If Proposed Mitigation 1531 If * Intermittent stream - NCSAM forms to be be completed and provided to support This proposed mitigation ratio.