Loading...
HomeMy WebLinkAbout20160225 Ver 2_Task 9 Credit Release Request Form - 2nd Release_20240426 4/26/2024 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kaitlyn Hogarth, khogarth@wildlandseng.com, 540-907-9432 Through: Wildlands Holdings IV, LLC We formally request a credit release for the South Fork Nutrient Offset and Buffer Mitigation Bank Parcel (DWR ID# 2016-0225v2) for completion of Task 9 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task 9 and are either pending review or have already been approved: South Fork Nutrient Offset and Buffer Mitigation Bank Parcel Monitoring Year 5 Report and South Fork Nutrient Offset and Buffer Mitigation Bank Parcel Monitoring Year 5 Supplemental Report. Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 5 1,040.000 Sq Ft 20,800.000 x 0.05 = 1,040 Buffer Preservation 5 96.950 Sq Ft 1,939.000 x 0.05 = 96.95 Buffer Enhancement 5 9,788.85 Sq Ft (Cattle exclusion: 185,622.000 x 0.05) + (Enhancement: 10,155.000 x .05) = 9,788.85 Generated Nitrogen Nutrient Offset 5 553.34 lbs. 11,066.85 x 0.05 = 553.34 Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Phosphorus Nutrient Offset 5 35.38 lbs. 707.55 x 0.10 = 35.38 Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: Attachments: 1) Approved Project Credit Table (include the most recent Asset Table approved by DWR, whether it is the BPDP table or the As-Built table), 2) Approved Credit Release Schedule Include the approved credit release schedule, whether it is the credit release schedule from the MBI/UMBI or from the BPDP,