Loading...
HomeMy WebLinkAboutDugout SAW 2018-01883 MY1 Credit Release ScheduleProject Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non‐Forested  Wetland Credits Warm Water Cool Water Cold  Water Riparian  Preservation Riparian Non‐ Preservation Non‐Riparian Coastal 6534.133 0.172 6.183 6534.133 0.172 6.141 Scheduled  Releases Warm Water Cool Water Cold  Water Scheduled  Releases Riparian  Riverine Riparian Non‐Riverine Non‐Riparian Scheduled  Releases Coastal 1 (Bank/Site Establishment)1, 2 15% 980.120 15%1.1 15%9/30/2021 9/30/2021 2 (Year 0/As‐Built)15% 980.120 15% 0.921 15%6/14/2023 7/18/2023 3 (Year 1 Monitoring)10% 653.413 10% 0.614 10%6/24/2024 4 (Year 2 Monitoring)10% 653.413 10% 0.614 15% 5 (Year 3 Monitoring)10% 653.413 15% 0.921 20% 6 (Year 4 Monitoring)5% 326.707 5% 0.307 10% 7 (Year 5 Monitoring)10% 653.413 15% 0.921 15% 8 (Year 6 Monitoring)5% 326.707 5% 0.307 NA NA 9 (Year 7 Monitoring)10% 653.413 10% 0.608 NA NA Stream Bankfull Standard3 10% 653.413 NA NA NA NA NA NA Varies4 Total Credits Release to Date 2613.653 2.635 Date Cumberland 3030005 2023 3/26/2024 County: 8‐Digit HUC: Year Project Instituted: Date Prepared: Potential Credits from As‐Built Survey Stream Credits Credit Classification Non‐Forested Wetland  CreditsForested Wetland CreditsStream Credits Current and Future Credit Releases Credit Release Milestone Wilmington District Mitigation Bank Credit Release Schedule 4 ‐ A 10% reserve of credits to be held back until the bankfull event performance standard has been met. 1 ‐ The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 ‐ The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long‐term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. Contingencies (if any): Wetland credits reduced by 0.042 WMU between Mitigation Plan and As‐built after IRT requested swales be removed from wetland credit areas. Signature of Wilmington District Official Approving Credit Release Dugout Stream and Wetland Mitigation Project EBX SAW‐2018‐01883 DWR # 20181442 Potential Credits from Mitigation Plan Forested Wetland Credits Total Potential Credits  Projected  Release Date Actual Release  Date 5/3/2024 5/3/2024