Loading...
HomeMy WebLinkAbout20081473 Ver 4_Arrington PhII Release Task6_20151202Water Resources ENVIRONMENTAL QUALITY December 2, 2015 Daniel Ingram EBX Neuse 1, LLC 302 Jefferson Street, Suite 110 Raleigh, NC 27605 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director DWQ Project #: 2008-1473v4 Wayne County Re: EBX Neuse Riparian Buffer Umbrella Mitigation Bank Instrument (LIMBI) Arrington Bridge Phase II Credit Release — Task 6 (PARTIAL) Dear Mr. Ingram: On October 15, 2015, the Division of Water Resources (DWR) received a Year 3 Monitoring Report for the subject site from McAdams Company on behalf of EBX Neuse 1, LLC (EBX). On November 3, 2015, Katie Merritt, with DWR, sent comments and recommendations to Brian Hockett with EBX regarding her review of site conditions according to the report. A few issues were noted that needed to be addressed. A total of fifty percent (50%) of the vegetation plots were failing to meet success criteria by five stems. These same plots also failed to meet success criteria last year. In addition, approximately 0.81 acres of the 13.97 acres within the restoration area had been mowed and disked with damage noted to the conservation easement boundary markers and photo station markers. As a result of Ms. Merritt's review of the report and site conditions, she requested the followine be submitted to DWR prior to a credit release: A supplemental planting plan for the entire site (including the areas that were mowed) which shall include 1) a proposed deadline to complete the replanting, 2) a commitment to flag all stems that will be planted, 3) a commitment to provide post -planting pictures of the replanted areas, 4) stem count data for Plots 1 and 4 post planting A written course of action for remediating the encroachment problems on the site with a proposed deadline for completion On November 20, 2015, Ms. Merritt received all of the information requested above from Mr. Hockett. Once the DWR has been properly notified that the remediation/replanting has been completed, DWR will issue the remaining five percent (5%) of this credit release. 401 and Buffer Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6494 Intamnt• www nrrwatarnnality nm EBX Neuse I, LLC December 2, 2015 Page 1 of 2 According to the UMBI signed on November 10, 2008, the following Project Milestone has been partially met, and the corresponding credits shall be released: Task/Milestones Credit 6) Approval of Year 3 Monitoring Report w/ Conditions 5% By copy of this correspondence DWR confirms that you have partially satisfied the above Task/Milestones for the above -referenced tract and 5% of your Neuse riparian buffer credits (0.05 x 194,267 ft' = 9,713.35 ft') and 5% of your nitrogen nutrient offset credits (0.05 x 17,702.28 lb -N = 885.11 lb -N) are now available for sale. Please update your credit ledgers accordingly. Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020201 of the Neuse River Basin excluding the Falls Watershed. Additionally, the riparian buffer credits must be used for impacts in the Neuse River Basin according to guidelines in the Consolidated Buffer Mitigation Rule, 15A NCAC 02B.0295, which became effective as of November 1, 2015. Please feel free to call Katie Merritt at (919) 807-6371 if you have any questions regarding this correspondence. Sincerely, Karen Higgins, Supervisor 401 and Buffer Permitting Unit KAH/kym cc: File Copy (Katie Merritt) Cara Conder —EBX (via electronic mail)