Loading...
HomeMy WebLinkAboutAdd Info Received 20240502 - StreamImpactTable_Pg11-12_PCN_5.2.24 Page 11 of 22 PCN Form Version 4.3- December 4, 2023 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government Site #* 3a Impact Reason* 3b. Impact Duration* 3c. Impact Type* 3d. Stream Name* 3e. Stream Type* 3f. Jurisdiction Type* 3g. Stream Width (avg ft) * 3h. Impact length (linear ft) * S1 Road Crossing Permanent Crossing/ Culvert SC / UT to Spruce Fork Perennial Both 3 79 S2 Road Crossing Permanent Crossing/ Culvert SB / UT to Spruce Fork Perennial Both 8 21 S3 Culvert Replacement Temporary Crossing/ Culvert SC / UT to Spruce Fork Perennial Both 1 22 S4 Pump-around Temporary Dewatering SC / UT to Spruce Fork Perennial Both 6.2 10 S5 Pump-around Temporary Dewatering SB / UT to Spruce Fork Perennial Both 9 10 S6 Pump-around Temporary Dewatering SC / UT to Spruce Fork Perennial Both 3 22 S7 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S8 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S9 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S10 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S11 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S12 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S13 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S14 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S15 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S16 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S17 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S18 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S19 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S20 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch impact: Click to enter. linear ft 3i2. Total permanent stream impacts: 100 linear ft 3i3. Total temporary stream impacts: 64 linear ft 3i4. Total stream and ditch impacts: 164 linear ft Page 12 of 22 PCN Form Version 4.3- December 4, 2023 3j. Comments: Temporary Stream impact S3 is a direct length culvert replacement. S1 and S2 used delineated stream bed width polygons for impact area calculations rather than average width times linear feet. S1 would result in loss of 0.0094 Ac stream bed and S2 would result in loss of 0.0042 Ac stream bed. Combined permanent stream bed impacts for this submittal is 0.0136 Ac. See tables in Appendix B for cumulative impact calculations. Calculating prior impacts was done by using average stream width times length of impact (shown in Appendix A). Temporary stream impacts S4, S5, and S6 are for the pump-around setup to install the culverts “in the dry”.