Loading...
HomeMy WebLinkAbout20240642 Ver 1_Clay County - B79 - Permit Plans (FINAL)_20240503See Sheet 1A For Index of Sheets (Not Included) See Sheet 1 B For Symbology Sheet 1198 1170 I 1169 1169 1170 EgcCREEK RK EgCREEK RK PROJECT Q LOCATION 1171 1172 VICINITY MAP 0e DETOUR ROUTE STATE OF NORTH CAROLINA BTATH BTATH PROIeCT RePeReNCe N¢ 210079 N.C. BP14.R010 DIVISION OF HIGHWAYS HTATH PH°l.NQ P.APROl.NU 17BP.14.R.168 WA CLAY COUNTY LOCATION. REPLACE EXISTING BRIDGE NO.210079 OVER EAGLE FORK CREEK ON SR 1171 (DICK JONES RD) TYPE OF WORK. GRADING, DRAINAGE, WIDENING, STRUCTURES BRIDGE AND PAVEMENT MARKINGS WETLAND AND SURFACE WATER IMPACTS PERMIT 07-07-2023 cR�o BEGIN PROJECT BP14.R010 -L- STA. 10+00.00 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. END CONSTRUCTION -DR1- STA. 12+03.27 BEGIN BRIDGE -L- STA. 12+33+/- i o END PROJECT BP14.R010 d� -L- STA. 16+05.00 f� DIC RONE� Fq 171 CIF END BRIDGE LSTA1288/ X PERMIT DRAWING SHEET 1 OF 4 INCOMPLETE PLANS RO NOT USE MR R/ W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 11 Prep-d to the °race m HYDRAULICS ENGINEER GRAPHIC SCALES DESIGN DATA PROJECT LENGTH ti bA; I Iso r��,lr�tl ADT 2024 = 30 50 25 0 50 100 ADT 2045 = 45 ° K = W/Q A D = WA °/Q LENGTH ROADWAY TIP PROJECT 17BP.14.R.168 = 0.105 MI LENGTH STRUCTURE TIP PROJECT 17BP.14.R.168 = 0.010 MI "�"""'°.4J1165 FOR THE .NORTH CAROLINA DEPART.4IENT OF TRANSPORTATION RQer 4� F (� y� �® s 2018 STANDARD SPECIFICATIONS PLANS T = WA % P.E. srcnnTURE: 50 25 0 50 100 V = 25 MPH* FUNC CLASS = LOCAL SUBREGIONAL TOTAL LENGTH TIP PROJECT 17BP.14.R.168 = 0.115 MI RIGHT OF WAY DATE: February 13 2023 HOLLY CHRISTENBURY, PE s a' ®F TR LMae® ROADWAY DESIGN ENGINEER PROJECT ENGINEER PROFILE (HORIZONTAL) LETTING DATE: ERIC MISAK 10 5 0 10 20 *BRIDGE DESIGN SPEED INVESTIGATION 2001 AASHTO GEOMETRIC DESIGN OF LOW VOLUME Februa 13, 2024 PE PROJECT DESIGN ENGINEER NCDOT CONTACT. ZACHARY SHULER, PE ASSISTANT BRIDGE PROGRAM naANACER PROFILE (VERTICAL) SIGNATURE: !FA�i' M-171zil--,iam- min WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) S1 -L- STA. 11+81 TO 13+06 Bank Stabilization 0.02 138 S2 -L- STA. 12+43 TO 13+25 Bank Stabilization 0.02 135 S3 -L- STA. 11+81 TO 13+06 Dewatering 0.02 148 S4 -L- STA. 12+74 TO 12+93 Dewatering 0.02 145 S5 -L- STA. 14+08 TO 14+33 Riprap at Embankment < 0.01 10 S6 -L- STA. 14+08 TO 14+33 Dewatering < 0.01 10 TOTALS*: 0.03 0.03 283 303 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb