HomeMy WebLinkAboutNCG020251_Inspection Report_20240502 ROY COOPER aoft 4%
4
Governor •
1.1;f1
3
ELISABETH BISER "
Secretary
BRIAN WRENN **e Q v.40"'
Director NORTH CAROLINA
Environmental Quality
May 2, 2024
Vulcan Construction Materials LLC
Attention: Tony Johnson
11020 David Taylor Drive, Suite 400
Charlotte,NC 28262
Subject: Compliance Evaluation Inspection
Vulcan Construction Materials LLC
NPDES Certificate of Coverage—NCG020251
Watauga County,North Carolina
Dear Sir or Madam,
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection we conducted at the Vulcan Construction Materials-Boone Quarry on April 17, 2024.
The report should be self-explanatory; however, should you have any questions, please do
not hesitate to contact Ashley Vikara at (336) 776-9655 or by E-mail at
Ashley.vikara@deq.nc.gov.
Sincerely,
amera
Regional Eng' eer
Land Quality Section
Enclosure: Compliance Evaluation Inspection Report
c: Laserfiche
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105
336-776-9800
iur.;a�!x�.w`a`s.�.'iit,�G.tSdA�!€%e�.�',�e�c�r."<��cas�w,.d�-ua:,.✓�.. ,wht���e.sa;.rs�.s-. a.�bd:,ee�k�=,..,w�k;,.r.,���`�w �r,�..='a::ra,�»,�h�>;:a.s15/A<r„c"Wxx#ry.w�s.," +.. ,r.. . ,y... - r
Compliance Inspection Report
Permit:NCG020251 Effective: 07/01/21 Expiration: 06/30/25 Owner: Vulcan Construction Materials LLC
SOC: Effective: Expiration: Facility: Vulcan Construction Materials-Boone Quarry
County: Watauga 3869 Hwy 105 S
Region: Winston-Salem
Boone NC 28607
Contact Person:Tony Johnson Title: Phone: 704-547-7076
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 04/17/2024 Entry Time 10:30AM Exit Time: 12:00PM
Primary Inspector:Ashley J Vikara Phone: 336-776-9655
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: • Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG020251 Owner-Facility:Vulcan Construction Materials LLC
Inspection Date: 04/17/2024 Inspection Type :Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On April 17, the facility was inspected. Others present were Jack Lawry-Popelka, Kimberly Turney and Shawna Riddle. A
mine inspection was also conducted during the inspection, 95-01. Before the inspection occurred an upset was recorded for
overflow of stormwater. While we were there work was being done to prevent another upset to occur, an excavator was
removing sediment from the sediment trap. Records and monitoring reports from the last three years were in the SWPPP.
Page 2 of 3
Permit: NCG020251 Owner-Facility:Vulcan Construction Materials LLC
Inspection Date: 04/17/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? • ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? • ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? • ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? • ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? • ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? • ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? • ❑ ❑ ❑
#Does the Plan include a BMP summary? • ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? • ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? • ❑ ❑ ❑
# Does the facility provide and document Employee Training? • ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? • ❑ ❑ ❑
#Is the Plan reviewed and updated annually? • ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? • ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? II ❑ ❑ ❑
Comment: There were no significant spills in the last 3 years.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? • ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? • ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ U ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? • ❑ ❑ ❑
#Were all outfalls observed during the inspection? • ❑ ❑ ❑
#If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ • ❑
#Has the facility evaluated all illicit(non stormwater)discharges? • ❑ ❑ ❑
Comment:
Page 3 of 3
.«+d�ra�,in>rx..�a-. ar:=�.-s,�sacs,x ..�-.a��_v..uc,��.�. t�.s•�.z�.�u^.�:r.4:.a�.�s,�,�;�,sa;r�,,,,a�as,,;r�-y:�;.e�+k,,..�w+:,.;-�.z s•.r:�:�r-.�.,r?e,<x�.. i,:t.R��.a.��c.,�..-,ter-�- ._4,.�sa,r.�-:;,.,.,�a .�.a,n _,.,..,:;o-,i�r^'xfi.�.:�.>",s..�'atisinY