HomeMy WebLinkAboutNCG020191_Inspection Report_20240502 ROY COOPER e
Governor
„
ELISABETH BISER - , - �Pf
Secretory P
BRIAN WRENN °°"" `
Director NORTH CAROLINA
Environmental Quality
May 2, 2024
Vulcan Construction Materials LLC
Attention: Tony Johnson
11020 David Taylor Drive, Suite 400
Charlotte,NC 28262
Subject: Compliance Evaluation Inspection
Vulcan Construction Materials LLC
NPDES Certificate of Coverage—NCG020191
Guilford County,North Carolina
Dear Sir or Madam,
•
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection we conducted at the Vulcan Construction Materials-Stokesdale on April 25, 2024.
The report should be self-explanatory; however, should you have any questions, please do
not hesitate to contact Ashley Vikara at (336) 776-9655 or by E-mail at
Ashley.vikara@deq.nc.gov.
Sincerely,
rdf---1/e
T eraP
Regional Engineer
Land Quality Section
Enclosure: Compliance Evaluation Inspection Report
c: Laserfiche
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105
336-776-9800
X51:'.;�;§ ,tM,..sa�n" a�•',K� a'" �s Iritk i.I .FAIWi.I2fig a.
Compliance Inspection Report
Permit:NCG020191 Effective: 07/01/21 Expiration: 06/30/25 Owner: Vulcan Construction Materials LLC
SOC: Effective: Expiration: Facility: Vulcan Construction Materials-Stokesdale
County: Guilford 6826 US Hwy 158
Region: Winston-Salem
Stokesdale NC 27357
Contact Person:Tony Johnson Title: Phone: 704-547-7076
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 04/25/2024 Entry Time 11:15AM Exit Time: 12:00PM
Primary Inspector:Ashley J Vikara Phone: 336-776-9655
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG020191 Owner-Facility:Vulcan Construction Materials LLC
Inspection Date: 04/25/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On April 25, 2024, the facility was inspected.A mine inspection was also conducted with Jack Lawry-Popelka, 41-08. All
outfalls were observed during the inspection,the SWPPP contained records from the last 3 years, except for qualitative
monitoring. Qualitative monitoring should be completed quarterly and recorded in the SWPPP.
Page 2 of 3
Permit: NCG020191 Owner-Facility:Vulcan Construction Materials LLC
Inspection Date: 04/25/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? • ❑ ❑ ❑
#Does the Plan include a General Location (USGS)map? • ❑ ❑ 0
#Does the Plan include a"Narrative Description of Practices"? • ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? • ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? • 0 ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? • 0 0 ❑
#Does the facility provide all necessary secondary containment? • 0 ❑ 0
#Does the Plan include a BMP summary? • ❑ 0 ❑
#Does the Plan include a Spill Prevention and Response Plan(SPRP)? 0 ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? • ❑ 0 0
#Does the facility provide and document Employee Training? • ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? • ❑ ❑ ❑
#Is the Plan reviewed and updated annually? • ❑ ❑ 0
#Does the Plan include a Stormwater Facility Inspection Program? • ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? • ❑ ❑ ❑
Comment:
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring? ❑ • ❑ ❑
Comment: No completed qualitative monitoring reports were seen in SWPPP
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? • ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ • ❑
Comment:
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? • ❑ ❑ ❑
#Were all outfalls observed during the inspection? • ❑ ❑ ❑
#If the facility has representative outfall status, is it properly documented by the Division'? • ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges'? • ❑ 0 ❑
Comment:
Page 3 of 3
-"*""=raittlraft V'a*40,-1,40:44f,