Loading...
HomeMy WebLinkAboutNCG020191_Inspection Report_20240502 ROY COOPER e Governor „ ELISABETH BISER - , - �Pf Secretory P BRIAN WRENN °°"" ` Director NORTH CAROLINA Environmental Quality May 2, 2024 Vulcan Construction Materials LLC Attention: Tony Johnson 11020 David Taylor Drive, Suite 400 Charlotte,NC 28262 Subject: Compliance Evaluation Inspection Vulcan Construction Materials LLC NPDES Certificate of Coverage—NCG020191 Guilford County,North Carolina Dear Sir or Madam, • Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Vulcan Construction Materials-Stokesdale on April 25, 2024. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact Ashley Vikara at (336) 776-9655 or by E-mail at Ashley.vikara@deq.nc.gov. Sincerely, rdf---1/e T eraP Regional Engineer Land Quality Section Enclosure: Compliance Evaluation Inspection Report c: Laserfiche North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 336-776-9800 X51:'.;�;§ ,tM,..sa�n" a�•',K� a'" �s Iritk i.I .FAIWi.I2fig a. Compliance Inspection Report Permit:NCG020191 Effective: 07/01/21 Expiration: 06/30/25 Owner: Vulcan Construction Materials LLC SOC: Effective: Expiration: Facility: Vulcan Construction Materials-Stokesdale County: Guilford 6826 US Hwy 158 Region: Winston-Salem Stokesdale NC 27357 Contact Person:Tony Johnson Title: Phone: 704-547-7076 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 04/25/2024 Entry Time 11:15AM Exit Time: 12:00PM Primary Inspector:Ashley J Vikara Phone: 336-776-9655 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020191 Owner-Facility:Vulcan Construction Materials LLC Inspection Date: 04/25/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: On April 25, 2024, the facility was inspected.A mine inspection was also conducted with Jack Lawry-Popelka, 41-08. All outfalls were observed during the inspection,the SWPPP contained records from the last 3 years, except for qualitative monitoring. Qualitative monitoring should be completed quarterly and recorded in the SWPPP. Page 2 of 3 Permit: NCG020191 Owner-Facility:Vulcan Construction Materials LLC Inspection Date: 04/25/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? • ❑ ❑ ❑ #Does the Plan include a General Location (USGS)map? • ❑ ❑ 0 #Does the Plan include a"Narrative Description of Practices"? • ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? • ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? • 0 ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? • 0 0 ❑ #Does the facility provide all necessary secondary containment? • 0 ❑ 0 #Does the Plan include a BMP summary? • ❑ 0 ❑ #Does the Plan include a Spill Prevention and Response Plan(SPRP)? 0 ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? • ❑ 0 0 #Does the facility provide and document Employee Training? • ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? • ❑ ❑ ❑ #Is the Plan reviewed and updated annually? • ❑ ❑ 0 #Does the Plan include a Stormwater Facility Inspection Program? • ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? • ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ • ❑ ❑ Comment: No completed qualitative monitoring reports were seen in SWPPP Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? • ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ • ❑ Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? • ❑ ❑ ❑ #Were all outfalls observed during the inspection? • ❑ ❑ ❑ #If the facility has representative outfall status, is it properly documented by the Division'? • ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges'? • ❑ 0 ❑ Comment: Page 3 of 3 -"*""=raittlraft V'a*40,-1,40:44f,