Loading...
HomeMy WebLinkAboutNCG020082_Inspection Report_20240502 r STATE? ROY COOPER ,n•n, Governor 66, ELISABETH BISER tt Secretary BRIAN WRENN °Am " Director NORTH CAROLINA Environmental Quality May 2, 2024 Vulcan Construction Materials LLC Attention: Tony Johnson 11020 David Taylor Drive, Suite 400 Charlotte,NC 28262 Subject: Compliance Evaluation Inspection Vulcan Construction Materials LLC NPDES Certificate of Coverage—NCG020082 Forsyth County,North Carolina Dear Sir or Madam, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Vulcan Construction Materials-North Quarry on April 25, 2024. Please note that in the stormwater inspection report summary we ask that you complete qualitative monitoring quarterly and record in SWPPP. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact Ashley Vikara at (336) 776-9655 or by E-mail at Ashley.vikara@deq.nc.gov. Sincerel , amera Eplin E Regional Engineer Land Quality Section Enclosure: Compliance Evaluation Inspection Report c: Laserfiche 0 North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 336-776-9800 s9 . Compliance Inspection Report Permit:NCG020082 Effective: 07/01/21 Expiration: 06/30/25 Owner: Vulcan Construction Materials LLC SOC: Effective: Expiration: Facility: Vulcan Construction Materials-North Quarry County: Forsyth 4401 N Patterson Ave Region: Winston-Salem Winston Salem NC 27105 Contact Person:Tony Johnson Title: Phone: 704-547-7076 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 04/25/2024 Entry Time 09:30AM Exit Time: 11:00AM Primary Inspector:Ashley J Vikara Phone: 336-776-9655 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: 0 Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020082 Owner-Facility:Vulcan Construction Materials LLC Inspection Date: 04/25/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: On April 25, 2024 the facility was inspected.A mine inspection was also conducted with Jack Lawry-Popelka, 34-02. All outfalls were observed during the inspection,the SWPPP contained records from the last 3 years, except qualitiative monitoring.A completed qualitative monitoring form was seen from 2022, but there were none for 2023. Qualitative monitoring should be completed quarterly and recorded in the SWPPP. Page 2 of 3 Permit: NCG020082 Owner-Facility:Vulcan Construction Materials LLC Inspection Date: 04/25/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? • ❑ ❑ #Does the Plan include a General Location(USGS)map'? IN 0 ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? #Does the Plan include a detailed site map including outfall locations and drainage areas? II 0 ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years'? ❑ #Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ #Does the Plan include a BMP summary? • ❑ 0 ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? • 0 ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan'? • ❑ 0 ❑ #Does the facility provide and document Employee Training? • 0 ❑ #Does the Plan include a list of Responsible Party(s)? • ❑ 0 ❑ #Is the Plan reviewed and updated annually? ❑ CI #Does the Plan include a Stormwater Facility Inspection Program? • ❑ 0 ❑ Has the Stormwater Pollution Prevention Plan been implemented? • ❑ 0 ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ • ❑ ❑ Comment: The only qualitative monitoring sheet seen in SWPPP was from November 2022 Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? • ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ • ❑ Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site'? ❑ ❑ #Were all outfalls observed during the inspection? • ❑ ❑ ❑ #If the facility has representative outfall status, is it properly documented by the Division? • ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? • ❑ ❑ ❑ Comment: Page 3 of 3 ,0,101,A-+ ff:44461ilarilior . v". 2migag7- '