Loading...
HomeMy WebLinkAboutNCC231219_NOT Closeout Documents_20240430 SEDIMENTATION INSPECTION REPORT covNTV.� . } 0 o ti New Hanover County 2 ➢ Engineering Department Beth E.Wetherill, C.P.E.S.C. z ��—��� 230 Government Center Drive• Suite 160 Soil Erosion Specialist y2 li ILL a2 Wilmington,North Carolina 28403 Email:bwetherill@nhcqov.com „ TELEPHONE(910)-798-7139 •ESTABLISHED, Project Name & Location: Helmsport, VRL Lot 415-5913 Nautical Isle Court Grading Permit#:44-13 Revision 7 Financially Responsible Party&Address: VRL Builders Group, LLC dba Vince Lutheran Homes-403 Peninsula Drive, Carolina Beach, NC 28428 Pictures: ❑ Yes ❑X No Weather&Soil Conditions: Sunny, Dry conditions, 72F Inspection Type: ❑ Initial ElPeriodic 11 Final ❑ Complaint Date Report Sent: 4/30/2024 Contact Made With: Inspection report to be sent/given, including financially responsible party: Vinson Lutheran- vinson.lutheran@gmail.com Has this project been issued a NOV? ❑ Yes ❑X No Potential NPDES violation? ❑ Yes ❑X No Degree: Choose an item. NPDES Type: Is there offsite sediment? ❑ Yes 0 No Degree: Choose an item. Location: Part 1: Please take immediate corrective action for the following items within 7-10 days of this inspection for the site to be in compliance with the Erosion and Sedimentation Control Ordinance: ❑X N/A Part 2: Please take corrective action for the following items prior to next periodic inspection for the site to be in compliance with the Erosion and Sedimentation Control Ordinance: ❑X N/A Part 3: Additional Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.The New Hanover County Land Disturbance Permit is now closed. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Report by: Beth Furr Others Present: Click or tap Bfurr@nhcgov.com Date of Inspection: 4/29/2024 here to enter text. Pictures: N/A Contact this office with any questions and/or comments about this report and/or project.