Loading...
HomeMy WebLinkAboutApplication - Agent Authorization - 3/29/2024 10:14:37 PM (2)CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address:. ' f f / - Z- �lTy G�LCL�� 'County: L,l A J g�4L /L/ Owner: �.r.ei.r= �c 1-�-O OAI J i.�;7) , /Ii i r ""` Signature Contractor/agent Z P4-Print Mv7- The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violadon of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02 i .0506 ajiu 13A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Excc-pt,on, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping ano sioping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Leacnas, iniperJous patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved uv the Divis o i. Tnere are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] 'Work to bc- conductEd 11rom land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction rr:acarial must be outside the ouffer. [15A NCAC 02H .0502 and 15A NCAC 026 .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must oe aL the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow as non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement o; Notification AW4:�— SNt'��o� Ll �� hereby state that I have been informed of the Catawba Riparian BU'` E.: ,;e...ny work corcucted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be :aka , suchbe built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. In Signature g (owner) P `, t] Date: