HomeMy WebLinkAbout090060_Application_20240328 t
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Animal Waste Management Systems
Request for Certification of Coverage
Facility Currently covered by an Expiring Sate Non-Discharge General Permit
On September 30, 2024,the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will
expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State
Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore,all applications
must be received by the Division of Water Resources by no later than April 3,2024.
Please do not leave any question unanswered Please verify all information and make any necessary corrections below.
Application must be signed and dated by the Permittee.
1. Certificate Of Coverage Number: AWS090060
2. Facility Name: Longstreet Nursery
3. Permittee's Name(same as on the Waste Management Plan): Shannonbrooke Farms LLC
4. Permittee's Mailing Address: PO Box 2212
City: Elizabethtown State: NC Zip: 28337
Telephone Number: 910-862-2252 Ext. / E-mail: allepAjohnsonlawvers.net
`i+n/MW`i♦1�i
5. Facility's Physical Address: 338 Peter 0and
City: Garland State: NC Zip: 28441
6. County where Facility is located: Bladen
7. Farm Manager's Name(if different from Landowner): Allen Morgan Johnson
8. Farm Manager's telephone number(include area code): 910-862-2252 Ext.
9. Integrator's Name(if there is not an Integrator,write"None"): Murphy-Brown LLC
10. Operator Name(OIC): Garrett Seth Brisson Phone No.: 910-862-2252 OIC#: 991708
11. Lessee's Name(if there is not a Lessee,write"None"):
12. Indicate animal operation type and number:
Current Permit: Operations Type Allowable Count
Swine-Wean to Feeder 2,600
Operation Tvves:
Swine Cattle Dry Poultry Other Types
Wean to Finish Dairy Calf Non Laying Chickens Horses-Horses
Wean to Feeder Dairy Heifer Laying Chickens Horses-Other
Farrow to Finish Milk Cow Pullets Sheep-Sheep
Feeder to Finish Dry Cow Turkeys Sheep-Other
Farrow to Wean Beef Stocker Calf Turkey Pullet
Farrow to Feeder Beef Feeder
Boar/Stud Beef Broad Cow Wet Poultry
Gilts Other Non Laying Pullet
Other Layers
13. Waste Treatment Lagoons,Digesters and Waste Storage Ponds(WSP):(Fill/Verify the following information.
Make all necessary corrections and provide missing data.)
Structure Type Estimated Liner Type Estimated Design Freeboard
Structure (Lagoon/Digester/ Date (Clay,Synthetic, Capacity Surface Area 'Redline"
Name WSP) Built Unknown) (Cubic Feet) (Square Feet) (Inches)
#1 Lagoon 3/29/1994 Full,clay 219,960.00 37,500.00 19.00
AL l�h
Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed
application as required by NC General Statutes 143-215.IOC(d), either by mailing to the address below or sending it via
email to the email address below.
The CAWMP must include the following components:
1. The most recent Waste Utilization Plan(WUP),signed by the owner and a certified technical specialist,containing:
a. The method by which waste is applied to the disposal fields(e.g.irrigation,injection,etc.)
b. A map of every field used for land application(for example: irrigation map)
c. The soil series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP
£ The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
h. The required NRCS Standard specifications
2.A site map/schematic
3.Emergency Action Plan
4.Insect Control Checklist with chosen best management practices noted
5. Odor Control Checklist with chosen best management practices noted
6.Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist
7.Lagoon/storage pond capacity documentation(design,calculations,etc.) Please be sure the above table is
accurate and complete. Also provide any site evaluations,wetland determinations,or hazard classifications that may be
applicable to your facility.
8. Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list,please include the additional components with your submittal.
(e.g.composting,digesters,solids separators,sludge drying system,waste transfers,etc.)
I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that,
if all required parts of this application are not completed and that if all required supporting information and attachments are not
included,this application package will be returned to me as incomplete.
t
Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18
U.S.C.Section 1001 provides a punishment by a fine of not more than$10,000 or imprisonment of not more than 5 years,or both
for a similar offense.)
Print the Name of the Permittee/Landowner/Signing Official and Sign below.(If multiple Landowners exist,all landowners
should sign. If Landowner is a corporation,signature should be by a principal executive officer of the corporation):
hT Name(Print): ► I Lt, V0 U d v--.wSL►, Title: KA l (� -10AAt_ti* &M A:nb r C,1C fct r'kv►-S
Signature: w�' Date:
Name(Print): Title:
Signature: Date:
Name(Print): Title:
Signature: Date:
THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS:
E-mail: animal.operations@deq.nc.gov
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh,North Carolina 27699-1636
-BASTE UTILIZATION PLAN
Monday,June 27,2011
Producer: Shannonbrooke Fanns
Farm Name: i_ongstreet Nursery 9-60
P 0 Box 2212
Eiizabethtown,NC 28337
Telephone#: (910)862-2252
Type of Operation : Wean to Feeder Swine
Number of Animals : 2600 pigs design capacity
Application Method: irrigation
The waste from your animal facility must be land applied at a specified rate to prevent
pollution of surface and/or groundwater. The plant nutrients in the animal waste should be
used to reduce the amount of commercial fertilizer required for the crops in the fields where
waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient.
Waste should be analyzed before each application cycle. Annual soil tests are strongly
encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be
grown.
Several factors are important in implementing your waste utilization plan in order to maximize
the fertilizer value of the waste and to ensure that it is applied in an environmentally safe
manner. Always apply waste based on the needs of the crop to be grown and the nutrient
contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are
important as they have different infiltration rates, leaching potentials, cation exchange
capacities, and avaialable water holding capacities. Normally waste shall not be applied to
land eroding at greater than 5 tons per acre per year. With special pre-cautions, waste may
be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on
saturated soils, when it is raining, or when the surface is frozen. Either of these conditions
may result in runoff to surface waters which is not allowed under DEM regulations. Wind
conditions should also be considered to avoid drift and downwind odor problems. To
maximize the value of the nutrients for crop production and to reduce the potential for
pollution, the waste should be applied to a growing crop or applied to bare ground not more
than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and
reduce odor problems. This plan is based on waste application through irrigation for this is
the manner in which you have chosen to apply your waste. If you choose to inject the waste
in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating
waste are not the same.
The estimated acres needed to apply the animal waste is based on typical nutrient content
for this type of facility. Acreage requirements should be based on the waste analysis report
from your waste management facility. Attached you will find information on proper sampling
techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste
utilization plan, if carried out, meets the requirements for compliance with 15A NCAC
2H.0217 adopted by the Environmental Management Commission.
Page 1 of 9
AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.)
2600 pigs X .4 tons waste/pigs/year= 1040 tons
AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR
2600 pigs X .48 Ibs PAN/pigs/year= 1248 PAN/year
Applying the above amount of waste is a big job. You should plan time and have appropriate
equipment to apply the waste in a timely manner.
The following acreage will be needed for waste application based on the crop to be grown,
soil type and suface application.
TABLE 1 :ACRES OWNED BY PRODUCER
TRACT FIELD SOIL TYPE&CLASS-� CROP YIELD LOS AW COMM ACRES LOS AW APPLIC.
DETERMINING PHASE CODE N/ACRE N/ACRE USED TIME
10973 1 WAGRAM 0-6% ^�—BH i -- 7 � 011_� _ 350� 4.16 1456 MAR-SEP
10973 1 IWAGRAM 0-6%o u SG 1; 501 0i 4.16 208 SEP-MAY
TOTALS: 1664�
Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow
summer annuals.
* Indicates a Crop Rotation
NOTE: The applicator is cautioned that P and K may be over applied while meeting the N
requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in
some eastern counties of NC to have a nutrient management plan that addresses all
nutrients. This plan only addresses Nitrogen.
Page 2 of 9
TABLE 2 :ACRES WITH AGREEMENT OR LONG TERM LEASE
(Agreement with adjacent landowners must be attached.)
(Required only if operator does not own adequate land. See required specifications 2.)
There are no Acres Leased
Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow
summer annuals.
• Indicates a Crop Rotation
* Acreage figures may exceed total acreage in field due to overseeding.
**Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial
nitrogen (COMM N) supplied.
The fallowing legend explains the crop codes used in TABLES 1 and 2 above:
CROP CODE CROP UNITS LB8 N/UNIT
8H ' HYBRID BERMUDAGRASS-HAY TONS 50 !
SG SMALL GRAIN OVERSEEDED AC 50
032019
Wftf�-Wuallty
Page 3 of 9
TOTALS FROM TABLES 1 AND 2
ACRES LBS AW
N USED
TABLE 1 4.16 1,664
TOTALS: 4.IS! 1,664
AMOUNT OF N PRODUCED: 1,246
***BALANCE -416
*** This number must be less than or equal to 0 in order to fully utilize the animal waste N
produced.
Acres show in each of the preceeding tables are considered to be the usable acres excluding
required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter
areas not receiving full application rates due to equipment limitations. Actual total acres in
the fields listed may, and most likely will be, more than the acres shown in the tables.
NOTE: The Waste Utilization Plan must contain provisions for periodic land application of
sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary
measures to prevent over application of nutrients or other elements. Your production facility
Will produce approximately 197.6 pounds of plant available nitrogen (PAN) per year in the
sludge that will need to be removed on a periodic basis. This figure is PAN when
broadcasting the sludge. Please be aware that additional acres of land, as well special
equipment, may be needed when you remove this sludge.
See the attached map showing the fields to be used for the utilization of waste water.
APPLICATION OF WASTE BY IRRIGATION
The irrigation application rate should not exceed the intake rate of the soil at the time of
irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture
content, soil structure, soil texture, water droplet size, and organic solids. The application
amount should not exceed the available water holding capacity of the soil at the time of
irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the
crop.
Your facility is designed for 180 days of temporary storage and the temporary storage must
be removed on the average of once every 5.92 months. In no instance should the volume of
waste being stored in your structure be within 1.58 feet of the top of the dike.
If surface irrigation is the method of land application for this plan, it is the responsiblity of the
producer and irrigation designer to ensure that an irrigation system is installed to properly
irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and
amounts of Nitrogen shown in the tables may make this plan invalid.
The following table is provided as a guide for establishing application rates and amounts.
APPLICATION APPLICATION
TRACT FIELD SOIL TYPE CROP_ RATE(inlhr) AMT(inches)
10973 —-1 IWAGRAM 0-6% ----- -- SG 0.60
'10973 1 'WAGRAM 0-6% BH 0.60 1 -V
*This is the maximum application amount allowed for the soil assuming the amount of
nitrogen allowed for the crop is not over applied. In many situations, the application
amount shown cannot be applied because the nitrogen limitation. The maximum
application amount shown can be applied under optimum soil conditions.
Page 4of9
NARRATIVE OF OPERATION
The RYE for coastal bermuda is from prior Waste Utilzation Plans for this farm executed by
Sam Warren, Bladen NRCS(1993) and Kevin Weston. Acreage is based on a Wettable
Acreage Determination dated 4119/2005,
Page 5 of 9
PLANS & SPECIFICATIONS
1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade
conveyances, direct application, or direct discharge during operation or land application. Any
discharge of waste which reaches surface water is prohibited. Illegal discharges are subject
to assessment of civil penalties of$10,000 per day by the Division of Water Quality for every
day the discharge continues.
2. The Field Office must have documentation in the design folder that the producer either
awns or has long term access to adequate land to properly dispose of waste. If the producer
does not own adequate land to properly dispose of waste, he shall provide NRCS with a
copy of a written agreement with a landowner who is within a reasonable proximity, allowing
him/her the use of the land for waste application for the life expectancy of the production
facility. It is the responsibility of the owner of the facility to secure an update of the Waste
Utilization Plan when there is a change in the operation, increase in the number of animals,
method of utilization, or available land.
3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic
crop yields based on soil type, available moisture, historical data, climate conditions, and
level of management, unless there are regulations that restrict the rate of application for
other nutrients.
4. Animal waste may be applied to land that has a Resource Management System (RMS) or
an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no
greater than 10 tons per acre per year and appropriate filter strips will be used where runoff
leaves the field. These filter strips will be in addition to'Buffers" required by DEM. (See
FOTG Stantard 393- Filter Strips and Standard 390 Interim Riparian Forest Buffers).
5. Odors can be reduced by injecting the waste or disking after waste application. Waste
should not be applied when there is danger of drift from the irrigation field.
6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated
on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the
waste may be broadcast provided the application does not occur during a season prone to
flooding. (See"Weather and Climate in North Carolina" in the NRCS Technical Reference -
Environment file for guidance.)
*7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that
runoff does not occur offsite or to surface waters and in a method which does not cause drift
from the site during application. No ponding should occur in order to control conditions
conducive to odor or flies and to provide uniformity of application.
8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the
surface is frozen.
9. Animal waste shall be applied on actively growing crops in such a manner that the crop is
not covered with waste to a depth that would inhibit growth.
10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with
a high potential for leaching. Waste nutrient loading rates on these soils should be held to a
minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall
not be applied more than 30 days prior to planting of a crop on bare soil.
,- 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following:
the outer perimeter of the land area onto which waste is applied from a lagoon that is a
component of a swine farm shall be at least 50 feet from any residential property boundary
and from anv perennial stream or river(other that an irrigation ditch or canal. Animal Page 6 of 9
other than swine waste from facilities sited on or after October 1, 1995), shall not be applied
closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips)
12. Animal waste shall not be applied closer than 100 feet to wells.
13.Animal Waste shall not be applied closer than 200 feet of dwellings other than those
owned by the landownwer.
14. Waste shall be applied in a manner not to reach other property and public right - of ways.
15.Animal waste shall not be discharged into surface waters, drainageways, or wetlands by
discharge or by over-spraying. Animal waste may be applied to prior converted croplands
provided they have been approved as a land application site by a "technical specialist".
Animal waste should not be applied on grassed waterways that discharge directly into water
courses, except when applied at agronomic rates and the application causes no runoff or
drift from the site.
*16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc.,
shall not be discharged into the animal waste management system.
*17.A protective cover of appropriate vegetation will be established on all disturbed areas
(lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be
provided for these areas and shall be fenced, as necessary, to protect the vegetation.
Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where
considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms
and structures should be inspected regularly for evidence of erosion, leakage or discharge.
*18. If animal production at the facility is to be suspended or terminated, the owner is
responsible for obtaining and implementing a "closure plan"which will eliminate the
possibility of an illegal discharge, pollution and erosion.
*19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular
basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be
kept on site.
20. Animal waste can be used in a rotation that includes vegetables and other crops for
direct human consumption. However, if animal waste is used on crops for direct human
consumption, it should only be applied as a preemergence with no other applications of
animal waste during the crop season.
*21. Highly visible markers shall be installed to mark the top and bottom elevations of the
temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be
managed to maintain the liquid level between the markers. A marker will be required to mark
the maximum storage volume fpr waste storage ponds.
22. Waste shall be tested within 60 days of utilization and soil shall be tested at least
annually at crop sites where waste products are applied. Nitrogen shall be the rate-
determining element. Zinc and copper levels in the soils shall be monitored and alternative
crop sites shall be used when these metals approach excessive levels. pH shall be adjusted
for optimum crop production amd maintained. Soil and waste analysis records shall be kept
for five (5) years. Poultry dry waste application records shall be maintained for three (3)
years. Waste application records for all other waste shall be maintained for five (5) years.
`J 23. Dead animals will be disposed of in a manner that meets North Carolina Department of
Agriculture regulations,
* Liquid Systems Page 7 of 9
r r vnr.vVlrrrV Vrl N VVlllluvrr na l''J. I GI.V J I VVVGVVVV V! I V I)LV I 1 11). 141 ifVVd I .VVV/vvQ
NAME OF FARM: Longstreet Nursery 9-so
OWNER/MANAGER AGREEMENT
I(we)understand and will follow and implement the specifications and the operation and
maintenance precedures estalished in the approved animal waste utilization plan for the farm
named above. 1 (we)know that any expansion to the existing design capacity of the waste
treatment and/or storage system or construction of new facilities will require a new utilization
plan and a new certification to be submitted to DEM before the new animals are stocked_
1(wo)understand that I must own or have aces to equipment, primarily irrigation equipment,
to land apply the animal waste described in this waste utilization plan, This equipment must
be available at the appropriate pumping time such that no discharge occurs from the lagoon
in a 25-year 1-day storm event. I also certify that the waste will be applied on the land
according to this plan at the appropriate times and at rates that no runoff occurs.
NAME OF FACILITY OWNER: Shannonbrooke Farms
SIGNATURE: s" DATE: Z, -2-7-- /
NAME OF MANAGER (if different from owner): r t
Please print
SIGNATURE:— DATE:
DATE:
NAME OF TECHNICAL SPECIALIST: Curtis Barwick
AFFILIATION: Barwick Ag Services
ADDRESS(AGENCY): 103 Country Club Circle
Clinton, NC 28328
(9 0)385- DO
SIGNATURE: DATE: ' 7 /
Page 0 of 9
C- &�
SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST
Source Cause BMP's to Minimize Odor
Fa rmstead Swine production ✓V( ) egetati Site Specific Practicesve or wooded buffers;
(V)Recommended best management
practices;
(,')Good judgment and common sense
Animal body Dirty manure ()Dry floors
surfaces covered animals
Floor surfaces Wet manure-covered (✓)Slotted floors;
floors (✓)Waterers located over slotted floors;
(-')Feeders at high end of solid floors;
(-')Scrape manure buildup from floors;
( )Underfloor ventilation for drying
Manure collection Urine (-)Frequent manure removal by flush,pit
pits recharge or scrape
Partial microbial ( )Underfloor ventilation
decomposition
Ventilation Volatile gases
�-- e (V)Fan maintenance;
exhaust fans Dust
(✓)Efficient air movement
Indoor surfaces Dust (✓)Washdown between groups of animals
( )Feed additives;
( )Feeder covers;
( )Feed delivery downspout extenders to
feeder covers
Flush Tanks Agitation of recycled ( )Flush tank covers —
lagoon liquid while tanks ( )Extend fill lines to near bottom of tanks
are filling with anti-siphon vents
Flush alleys Agitation during waste ( )Underfloor flush with underfloor
water conveyance ventilation
Pit recharge Agitation of recycled ()Extend recharge lines to near bottom of
points lagoon liquid while pits pits with anti-siphon vents
are filling
Lift stations Agitation during sump ( )Sump tank covers
tank filling and drawdown
Outside drain Agitation during waste ( )Box Covers
collection or water conveyance
junction boxes
End of drain Agitation during waste ( )Extend discharge point of pipes
pipes at lagoon water underneath lagoon liquid level
Lagoon surfaces Volatile gas emissions (✓)Proper lagoon liquid capacity
Biological mixing (V)Correct lagoon startup procedures
Agitation ( )Minimum surface area-to-volume ratio
(V)Minimum agitation when pumping
( )Mechanical aeration
( )Proven biological additives
12
f
1
Irrigation sprinkler High pressure agitation (✓)Irrigate on dry days with little or no wind
nozzles Wind draft (✓)Minimum recommended operation pressure
(-')Pump intake near lagoon liquid surface
( )Pump from second-stage lagoon
AMOC—November 11, 1996
Storage tank or Partial microbial ( )Bottom or midlevel loading
basin surface decomposition Mixing while ( )Tank covers
filling Agitation when emptying( )Basin surface mats of solids
( )Proven biological additives or oxidants
Settling basin Partial microbial decom- ( )Extend drainpipe outlets underneath liquid
surface position Mixing while filling level
Agitation when emptying ( )Remove settled solids regularly
Manure,slurry or Agitation when spreading ( )Soil injection of slung/sludges
sludge spreader Volatile gas emissions ( )Wash residual manure from spreader after use
outlets ( )Proven biological additives or oxidants
Dead animals Carcass decomposition ( )Proper disposition of carcasses
Dead animal Carcass decomposition ( )Complete covering of carcasses in burial pits
disposal pits ( )Proper location/construction of disposal pits
Incinerators Incomplete combustion ( )Secondary stack burners
Standing water improper drainage (V)Farm access road maintenance
around facilities Microbial decomposition of away from facilities
organic matter
Manure tracked Poorly maintained access (V)Farm access road maintenance
onto public roads roads
from farm access
Additional Information: Available From:
Swine Manure Management 0200 Rule/BMP Packet NCSU-County Extension Center
Swine Production Farm Potential Odor Sources and Remedies,EBAE Fact Sheet NCSU-BAE
Swine Production Facility Manure Management:Pit Recharge—Lagoon Treatment:EBAE128-88NCSU-BAE
Swine Production Facility Manure Management:Underfloor Fluse-Lagoon Treatment 129-88NCSU-BAE
Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE103-83NCSU-BAE
Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE
Controlling Odors from Swine Buildings;PIH-33 NCSU-Swine Extension
Environmental Assurance Program: NPPC Manual NC Pork Producers
Assoc
Options for Managing Odor;a report from the Swine Odor Task Force NCSU Agri Communication
Nuisance Concerns in Animal Manure Management: Odors and Flies;PR0101, Florida Cooperative Extension
1995 Conference Proceedings
The issues checked ( ) pertain to this operation. The landowner/integrator agrees to
use sound judgment in applying odor control measures as practical.
I certify the aforementioned odor control Best Management Practices have been reviewed
with me.
(Land wner Signature)
13
e
INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS
Source Cause BMP's to Minimize Odor Site Specific Practices
(Liquid Systems)
Flush Gutters Accumulation of solids (✓)Flush system is designed and operated
sufficiently to remove accumulated
solids from gutters as designed.
( ) Remove bridging of accumulated solids at
discharge
Lagoons and Pits Crusted Solids (✓)Maintain lagoons,settling basins and
pits where pest breeding Is apparent to
minimize the crusting of solids to a depth
of no more than 6-8 inches over more than
30%of surface.
Excessive Decaying vegetation (✓)Maintain vegetative control along banks of
Vegetative Growth lagoons and other Impoundment's to prevent
accumulation of decaying vegetative matter
along waters edge on impoundment's perimeter.
(Dry Systems)
Feeders Feed Spillage () Design,operate and maintain feed systems(e.g..
bunkers and troughs)to minimize the accumulation
.r of decaying wastage.
() Clean up spillage on a routine basis(e.g.7-10 day
interval during summer;15-30 day interval during winter).
Feed Storage Accumulation of feed () Reduce moisture accumulation within and around
residues immediate perimeter of feed storage areas by
insuring drainage away from site and/or providing
adequate containment(e.g.,covered bin for
brewer's grain and similar high moisture grain
products).
() Inspect for and remove or break up accumulated
solids in filter strips around feed storage as needed.
Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences
Areas wastes and feed wastage arid other locations where waste accumulates and
disturbance by animals is minimal.
() Maintain fence rows and filter strips around animal
holding areas to minimize accumulations of wastes
(i.e.inspect for and remove or break up accumulated
solids as needed).
MIC--November 11, 1996
10
c•
Dry Manure Handling Accumulations of animal ()Remove spillage on a routine basis(e.g.7-10 day
Systems wastes interval during summer; 15-30 days interval during
winter)where manure is loaded for land application
or disposal.
()Provide for adequate drainage around manure stockpiles
()Inspect for and remove or break up accumulated wastes
in filter strips around stockpiles and manure handling
areas as needed.
The issues checked ( ) pertain to this operation. The landowner/ integrator agrees to use
sound judgment in applying insect control measures as practical.
I certify the aforementioned insect control Best Management Practices have been
reviewed with me.
(Land caner Signature)
For more information contact the Cooperative Extension Service, Department of Entomology, Box
7613, North Carolina State University, Raleigh, NC 27695-7613.
AMIC-- November 11, 1996
11
9-60
EMERGENCY ACTION PLAN
PHONE NUMBERS
DIVISION OF WATER QUALITY (DWQ) 9 Ib - 4t6 - 15wl
EMERGENCY MANAGEMENT SERVICES (EMS) I to -t,p-7bu
SOIL AND WATER CONSERVATION DISTRICT (SWCD) 910--%b-.) - 317g
NATURAL RESOURCES CONSERVATION SERVICE (NRCS) q t0 - Ito:) - 1-19
COOPERATIVE EXTENSION SERVICE (CES) qt O -$Col. - 4S':�`
This plan will be implemented in the event that wastes from your operation are leaking,
overflowing or running off site. You should not wait until wastes reach surface waters or
leave your property to consider that you have a problem. You should make every effort to
ensure that this does not happen. This plan should be posted in an accessible location
for all employees at the facility. The following are some action items you should take.
1. Stop the release of wastes. Depending on the situation,this may or may not be possible. Suggested
responses to some possible problems are listed below.
A. Lagoon overflow-possible solutions are:
a) Add soil to berm to increase elevation of dam.
b) Pump wastes to fields at an acceptable rate.
c) Stop all flow to the lagoon immediately.
d) Call a pumping contractor.
e) Make sure no surface water is entering lagoon.
B. Runoff from waste application field-actions include:
a) Immediately stop waste application.
b) Create a temporary diversion to contain waste.
c) Incorporate waste to reduce runoff.
d) Evaluate and eliminate the reason(s)that cause the runoff.
e) Evaluate the application rates for the fields where runoff occurred.
C. Leakage from the waste pipes and sprinklers-action include:
a) Stop recycle pump.
b) Stop irrigation pump.
c) Close valves to eliminate further discharge.
d) Repair all leaks prior to restarting pumps.
D. Leakage from flush systems,houses,solid separators-action include:
a) Stop recycle pump.
b) Stop irrigation pump.
c) Make sure siphon occurs.
d) Stop all flow in the house,flush systems,or solid separators.
E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks-
possible action:
a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible
pump, and pump back to lagoon.
.�. b) If holes are caused by burrowing animals,trap or remove animals and fill holes and
compact with a clay type soil.
c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon
as possible.
C
`r..f
2. Assess the extent of the spill and note any obvious damages.
a. Did the waste reach surface waters?
b. Approximately how much was released and for what duration?
c. Any damage notes, such as employee injury, fish kills, or property damage?
d. Did the spill leave the property?
e. Does the spill have the potential to reach surface waters?
f. Could a future rain event cause the spill to reach surface waters?
g. Are potable water wells in danger(either on or off the property)?
h. How much reached surface waters?
3. Contact appropriate agencies.
a. During normal business hours call your DWQ regional office; Phone #, After hours,
emergency number: (919) 733-3942. Your phone call should include: your name, facility
number, telephone number, the details of the incident from item 2 above, the exact location
of the facility, the location or direction of the movement of the spill, weather and wind
conditions. The corrective measures that have been under taken, and the seriousness of
the situation.
b. If the spill leaves property or enters surface waters, call local EMS phone number.
c. Instruct EMS to contact local Health Department.
d. Contact CE's phone number, local SWCD office phone number and the local NRCS
office for advice/technical assistance phone number.
4. If none of the above works call 911 or the Sheriffs Department and explain your problem to
them and ask the person to contact the proper agencies for you.
5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage.
a. Contractors Name: Murphy Family Farms
b. Contractors Address: P.O. Box 759. Rose Hill. NC 28458
c . Contractors Phone: (910)289-2111
6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.)
a. Name: Kraig Westerbeek
b. Phone: (910)289-2111
7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the
damage, repair the system, and reassess the waste management plan to keep problems
with release of wastes from happening again.
9
9--60
Version—November 26,2018
Mortality Management Methods
Indicate which methods) will be implemented.
When selecting multiple methods indicate a primary versus secondary option_
Methods other than those listed must be approved by the State Veterinarian.
Primary Secondary Routine Mortality
Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal
YX death. The burial must be at least 300 feet from any flowing stream or public body of water
(G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal
high water table.Attach burial location map and plan.
(� ❑ Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC
u 13B .0200.
ORendering at a rendering plant licensed under G.S. 106-168.7.
Complete incineration according to 02 NCAC 52C .0102.
A composting system approved and permitted by the NC Department of Agriculture&Con-
sumer Services Veterinary Division (attach copy of permit). If compost is distributed off-farm,
additional requirements must be met and a permit is required from NC DEQ.
In the case of dead poultry only, placing in a disposal pit of a size and design approved by the
NC Department of Agriculture&Consumer Services (G.S. 106-549,70).
a Any method which,in the professional opinioniof the State Veterinarian,would make possible
the salvage of part of a dead animal's value without endangering human or animal health.
(Written approval by the State Veterinarian must be attached).
aMass Mortality Plan
Mass mortality plans are required for farms covered by an NPDES permit. These plans are
also recommended for all animal operations. This plan outlines farm-specific mortality man-
agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup-
ports a variety of emergency mortality disposal options-,contact the Division for guidance.
• A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated
when numbers of dead animals exceed normal mortality rates as specified by the State
Veterinarian.
• Burial must be,done in accordance with NC General Statutes and NCDA&CS Veterinary
Division regulations and guidance.
• Mass burial sites are subject to additional permit conditions(refer to facility's animal
waste management system permit).
• In the event of imminent threat of a disease emergency,the State Veterinarian may enact
additional temporary procedures or measures for disposal according to G.S. 106-399.4.
Signature of F m Owner/Manager Date
r
Signature of Technical Specialist Date
( -- &o
OPERATION & MAINTENANCE PLAN
Proper lagoon liquid management should be a year-round priority. It is es
important to manage levels so that you do not have problems during extended rainy and
wet periods,
Maximum storage capacity should be available in the lagoon for periods when the
receiving crop is dormant (such as wintertime for bermudagrass) or when there are
extended rainy spells such as the thunderstorm season in the summertime. This means
that at the first signs of plant growth in the later winter/early spring, irrigation according to
a farm waste management plan should be done whenever the land is dry enough to
receive lagoon liquid. This will make storage space available in the lagoon for future wet
periods. In the late summer/early fall the lagoon should be pumped down to the low
marker (see Figure 2-1) to allow for winter storage. Every effort should be made to
maintain the lagoon close to the minimum liquid level as long as the weather and waste
utilization plan will allow it.
Waiting until the lagoon has reached its maximum storage capacity before starting to
irrigate does not leave room for storing excess water during extended wet periods.
Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of
state law and subject to penalty action,
The routine maintenance of a lagoon involves the following:
Maintenance of a vegetative cover for the dam.
Fescue or common bermudagrass are the most common vegetative
covers. The vegetation should be fertilized each year, if needed, to
maintain a vigorous stand, The amount of fertilizer applied should be
based on a soils test, but in the event that it is not practical to obtain
a soils test each year, the lagoon embankment and surrounding areas
should be fertilized with 800 pounds per acre of 10-10-10, or
equivalent.
Brush and trees on the embankment must be controlled. This may be
done by mowing, spraying, grazing, chopping, or a combination of
these practices. This should be done at least once a year and
possibly twice in years that weather conditions are favorable for
heavy vegetative growth.
NOTE: If vegetation is controlled by,spraying, the herbicide must not be allowed to enter
the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating
the waste.
Maintenance inspections of the entire lagoon should be made during the initial filling of
the lagoon and at least monthly and after major rainfall and storm events, Items to be
checked should include, as a minimum, the following:
Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes---look for-
1. separation of joints
2. cracks or breaks
3. accumulation of salts or minerals
4. overall condition of pipes
-- Lagoon surface---look for:
1, undesirable vegetative growth
2. floating or lodged debris
Embankment---look for:
1. settlement, cracking, or "jug" holes
2, side slope stability---slumps or bulges
3. wet or damp areas on the back slope
4. erosion due to lack of vegetation or as a result of wave action
5. rodent damage
Larger lagoons may be subject to liner damage due to wave action caused by strong
winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam.
A good stand of vegetation will reduce the potential damage caused by wave action. If
wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be
used to reduce the wave impacts.
Any of these features could lead to erosion and weakening of the dam. If your lagoon has
any of these features, you should call an appropriate expert familiar with design and
construction of waste lagoons. You may need to provide a temporary fix if there is a threat
of a waste discharge. However, a permanent solution should be reviewed by the
technical expert. Any digging into a lagoon dam with heavy equipment is a serious
undertaking with potentially serious consequences and should not be conducted unless
recommended by an appropriate technical expert.
Transfer Pumps---check for proper operation of:
- 1. recycling pumps
2. irrigation pumps
Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding
noise, or a large amount of vibration, may indicate that the pump is in need or repair or
replacement.
NOTE: Pumping systems should be inspected and operated frequently enough so that you
are not completely "surprised" by equipment failure. You should perform your pumping
system maintenance at a time when your lagoon is at its low level. This will allow some
safety time should major repairs be required. Having a nearly full lagoon is not the time
to think about switching, repairing , or borrowing pumps. Probably, if your lagoon is full,
your neighbor's lagoon is full also. You should consider maintaining an inventory of spare
parts or pumps.
Surface water diversion features are designed to carry all surface
drainage waters (such as rainfall runoff, roof drainage, gutter outlets,
and parking lot runoff) away from your Iagoon and other waste
treatment or storage structures. The only water that should be
coming from your lagoon is that which comes from your flushing
(washing) system pipes and the rainfall that hits the lagoon directly.
You should inspect your diversion system for the following:
I, adequate vegetation
2, diversion capacity
3. ridge berm height
Identified problems should be corrected promptly. It is advisable to inspect your system
during or immediately following a heavy rain. If technical assistance is needed to
determine proper solutions, consult with appropriate experts.
You should record the level of the lagoon just prior to when rain is predicted, and then
record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will
give you an idea of how much your lagoon level will rise with a certain rainfall amount
(you must also be recording your rainfall for this to work). Knowing this should help in
planning irrigation applications and storage. If your lagoon rises excessively, you may
have an inflow problem from a surface water diversion or there may be seepage into the
lagoon from the surrounding land.
Lagoon Operation
Startup:
1. Immediately after construction establish a complete sod cover on bare soil
surfaces to avoid erosion.
2. Fill new lagoon design treatment volume at least half full of water before
waste loading begins, taking care not to erode lining or bank slopes.
3. Drainpipes into the lagoon should have a flexible pipe extender on the
end of the pipe to discharge near the bottom of the lagoon during initial
filling or another means of slowing the incoming water to avoid erosion of
the lining.
4. When possible, begin loading new lagoons in the spring to maximize
bacterial establishment (due to warmer weather).
5. It is recommended that a new lagoon be seeded with sludge from a healthy
working swine lagoon in the amount of 0.25 percent of the full lagoon
liquid volume. This seeding should occour at least two weeks prior to the
addition of wastewater.
6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below
7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of
lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid
pH is between 7.5 and 8.0.
7. A dark color, lack of bubbling, and excessive odor signals inadequate
biological activity. Consultation with a technical specialist is recommended
if these conditions occur for prolonged periods, especially during the warm
season,
Loading:
The more frequently and regularly that wastewater is added to a lagoon, the better the
lagoon will function. Flush systems that wash waste into the lagoon several times daily are
optimum for treatment. Pit recharge systems, in which one or more buildings are drained
and recharged each day, also work well.
Practice water conservation---minimize building water usage and
spillage from leaking waterers, broken pipes and washdown through
proper maintenance and water conservation.
Minimize feed wastage and spillage by keeping feeders adjusted. This
will reduce the amount of solids entering the lagoon
Management:
Maintain lagoon liquid level between the permanent storage level and
the full temporary storage level.
Place visible markers or stakes on the lagoon bank to show the
minimum liquid level and the maximum liquid lever (Figure 2-1).
Start irrigating at the earliest possible date in the spring based on
nutrient requirements and soil moisture so that temporary storage
will be maximized for the summer thunderstorm season. Similarly,
irrigate in the late summer/early fall to provide maximum lagoon
storage for the winter.
The lagoon liquid level should never be closer than 1 foot to the lowest
point of the dam or embankment.
Do not pump the lagoon liquid level lower that the permanent storage
level unless you are removing sludge.
Locate float pump intakes approximately 18 inches underneath the liquid
surface and as far away from the drainpipe inlets as possible.
Prevent additions of bedding materials, long-stemmed forage or vegetation,
molded feed, plastic syringes, or other foreign materials into the lagoon.
Frequently remove solids from catch basins at end of confinement houses or
wherever they are installed.
Maintain strict vegetation, rodent, and varmint control near lagoon edges.
Do not allow trees or large bushes to grow on lagoon dam or embankment.
Remove sludge from the lagoon either when the sludge storage capacity is
full or before it fills 50 percent of the permanent storage volume.
If animal production is to be terminated, the owner is responsible for
obtaining and implementing a closure plan to eliminate the possibility of a
pollutant discharge.
Sludge Removal:
Rate of lagoon sludge buildup can be reduced by:
proper lagoon sizing,
mechanical solids separation of flushed waste,
gravity settling of flushed waste solids in an appropriately designed basin, or
minimizing feed wastage and spillage.
Lagoon sludge that is removed annually rather than stored long term will:
have more nutrients,
have more odor, and
• require more land to properly use the nutrients.
Removal techniques:
Hire a custom applicator.
Mix the sludge and lagoon liquid with a chopper-agitator impeller
pump through large-bore sprinkler irrigation system onto nearby cropland;
and soil incorporate.
Dewater the upper part of lagoon by irrigation onto nearby cropland or
forageland; mix remaining sludge; pump into liquid sludge applicator; haul
and spread onto cropland or forageland; and soil incorporate.
Dewater the upper part of lagoon by irrigation onto nearby cropland or
forageland; dredge sludge from lagoon with dragline or sludge barge; berm
an area beside lagoon to receive the sludge so that liquids can drain back
into lagoon; allow sludge to dewater; haul and spread with manure spreader
onto cropland or forageland; and soil incorporate.
Regardless of the method, you must have the sludge material analyzed for waste
constituents just as you would your lagoon water. The sludge will contain different
nutrient and metal values from the liquid. The application of the sludge to fields will be
limited by these nutrients as well as any previous waste applications to that field and crop
requirement. Waste application rates will be discussed in detail in Chapter 3.
When removing sludge, you must also pay attention to the liner to prevent damage. Close
attention by the pumper or drag-line operator will ensure that the lagoon liner remains
intact. If you see soil material or the synthetic liner material being disturbed, you should
stop the activity immediately and not resume until you are sure that the sludge can be
removed without liner injury. If the liner is damaged it must be repaired as soon as
possible.
Sludge removed from the lagoon has a much higher phosphorus and heavy metal content
than liquid. Because of this it should probably be applied to land with low phosphorus
and metal levels, as indicated by a soil test, and incorporated to reduce the chance of
erosion. Note that if the sludge is applied to fields with very high soil-test phosphores, it
should be applied only at rates equal to the crop removal of phosphorus. As with other
wastes, always have your lagoon sludge analyzed for its nutrient value.
The application of sludge will increase the amount of odor at the waste application site.
Extra precaution should be used to observe the wind direction and other conditions which
could increase the concern of neighbors.
Possible Causes of Lagoon Failure
Lagoon failures result in the unplanned discharge of wastewater from the structure. Types
of failures include leakage through the bottom or sides, overtopping, and breach of the
dam. Assuming proper design and construction, the owner has the responsibility for
ensuring structure safety. Items which may lead to lagoon failures include:
Modification of the lagoon structure---an example is the placement of a pipe
in the dam without proper design and construction. (Consult an expert in
lagoon design before placing any pipes in dams.)
• Lagoon liquid levels---high levels are a safety risk.
Failure to inspect and maintain the dam.
Excess surface water flowing into the lagoon.
Liner integrity---protect from inlet pipe scouring, damage during sludge
removal, or rupture from lowering lagoon liquid level below groundwater
table.
NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause
gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge
of wastewater and possible dam failure.
1pc^arator RANDY MITI-i County: BL.AGEN Date: 03/ 9!94
ristance to 'nearest residence ( other than owner ) , 1.000 ..0 i'eet
AVERAGE. LIVE WEIGHT ( ALW )
0 Sows ( farrow to finish ) ., 1417 !be . 0 lb'.
0 sows ( farrow to feeder ) 11 522 lbs . - 0 lbs
0 head i flinishing only V !-3- i bs . - 0 lbs
0 sows ( farrow, to wean ) 1.33 lbs ., - 0 lbw
2640 head ( wean to faeder ) :; 30 lbs . - 79200 !be
Describe other _ � w w.�� � w �� __ 0
—fatal Average Live Weight - 79200 lbs
,. 1`1INIMUM REOUIRED TREATMENT VOLUME OF LAGOON
Volume 79200 lb-- ;. ALIA x Treatment- Voluma( CF )/lb . FiLW
Treatment Volume( CF )/lb . ALW = 1 CF/lb , A4•..W
volume = 79200 cubic feat
STORAGE VOLUME FOR :SLUDGE ACCUMULATION
Volume 39600 .0 cubic feet
TOTAL DESIGNED WOL UME
inside top length ( feet �_.�.,. . ._ �_._.._____... _.__ 100 .0
Inside top Width ( 7'�e � }___ ...___ _ _.___w__.._._.__.__ .... 375 .0
Top of dike elevation 99 .0
Batton, of lagaan elevation ( feet )----- ------,__. 88 .0
Freeboard ( feet }___. __________.._ _ _w _w___.._._____. 1 .0
Side slopes (, inside la. oan 3 .0 1
Total design volume using pr ismoidal formula.
SS/END1. :SS/END2 SS/SIDE1 SS/SIDE 2 LENGTH, WIDTH DEPTH
3 .0 3 .0 3 .0 3 .,0 94 .0 369 .0 10 .0
AREA OF T Of
LENGTH WIDTH
94 .0 369 .,0 34686 ( AREA, OF TOP )
AREA OF BOTTOM
LENGTH' WIDTH
34 .0 309 .0 10506 ( AREA OF BOTTOM )
AREA OF MIDSECTION
LENGTH WID`ri-t ,. 4
64 .0 339 .0
686704 ( AREA OF I MIDSECTION , 4 )
CU . F T . - [AREA TOE' + ( 4-=AREA Mll7Sa'EC T[OIh1 ) + AREA BOTTOM] DE"R T H/6
34636 .0 56784 .0 10506 .0 1 .:7
Total Designed Volume Available; 21.99--160 CU .. FT .
5 . TEMPORARY STORAGE REQUIRED
DRAINAGE AREA,
Lagoon ( top of dike )
Length 1 Width --
100 ,0 375 .0 37500 .0 square feet"
BuiIdirigs ( roof sand lot viater
0 .0 square feet Describe this area
TOTAL DA 37500 .0 square feet.
Design temporary storage period to be 1,30 dar""s
7A . Volume of waste produced
Feces & urine production in gal./day per 1315 ..Lh . ALW 1 :,37
Volume 79-400 lbs . ALW/135 lhs . ALW 1 .37 gal/day 180 ta.a';, s
'volume = 144.672 gals ,: or 19341 ,2 cubic feet
volume of wash treater
This is the amount of fresh water used for slashing floors or volume
of fresh Water used for a flush systein . h' lu19, 1 s,/stems that 't"�C,Ml"Ct!lc}i w
the lagoon water- are accounted for in 5A ,
Volume = 523 .0 gallon /da:>f 1 0 days stora W/7 .r•P� gallon
per CF
Volume w- 12705 .9 cubic feet.
C . Volume of rainfall in e::cess of evaporation
Use period of time when rainfall exceeds evaporation by largest amount
180 days excess ra ?nfall 7 .0 -inches
Volume = 7 .0 1n uA / '12 i n c h o s Per foo-'C_
Volume = 21875 .0 cubic feet
D ,. Volume of 25 yea"- - 24 hour story„
volume 7 .0 inches / :12 i nc'n s per foot D ,
Volume, - 21,375 ..0 cubic feet
TOTAL. REQUIRED TEMPORARY STORAGE
sA . 19341 cubic feet
5B . 12705 cubic feet
SC . 21375 cubic feet.
5D .. 21375 cubic feet
TOTAL 75797 cubic feet
SUMMARY
Temporary storage period========-==========> 180 days
Rainfall in excess of Uvapo'i atlon=__.___._.....,___=> 7 .0 inches
25 year `•- 24 hour 7 .0 inches
1 .0 feet
Inside tots 100 .0 feet
Inside top 3:75 .0 feet
Top of dike elevat.ion=__________=_____________-; 99 .0 feet
Bottom of lagoon 88 .0 feet
Total required volumeM.._..._==_______==____.=___=y 194597 u . ft: .,
Actual design 219960 cu . ft .
Seasonal high w atert�ale elevation ( SHW T )=-=> 94 .3 feet
Stop pumping 95 .3 feet
ee'.,.
Must be i or _ to the SHW i 94 .3 feet
Must. be > or = to min . req , treatment el , > 14 .0 feet
Required minimum treatment volume===== =====i 118800 Cur ft .
Volume at stop pumping el u vat_on=====-----------=`• 136197 cu . ft .
Start pumping 97 .3 fee'
Must be at bottom of freeboard e 25 y'r ,, rainfall
Actual volume less 25 jar 24 hr .. rainfall==> 1 0OSS cu . ft .
Volume :t ;start pumping eleva.tion=-..-----====-"=> 196356 cu . ft .,
Required volume to be pumped=..,_........................,_........,..,........... -: 53922 Cu . ft .
Actual volume planned to be pumped= ====ter=) 0159 cu . ft . �l
Min . thickneps QT soil .liner when required== 1 ,6 feet
DESIGNED BY: '�"C,i'c �°�`L7�%' APPROVED BY
DATE ,, DATE :
NOTE SEE ATTACHE? WASTE UTILIZATION PLAN
COMMENTS
SHEET l OF 2
OPEIRPi 1 ION AND MAINTENANCE PL_A.N'
This lagoon is designed for waste treatment ( permanent storage ) and
180 days of temporary storage .. The time required for the planned
fluid level ( perman°ent and temporary storage ) to be reached ma-y wear;✓
due to site .conditions , weather , i tits}-linos operations , aand 'i;,i"le �ifl�lln
of fresh water adder[ to the system .
The dlesigne<_J temporary ry storage consists of 180 du.;%5 srorage for
1 ) waste- 'from animals arid. ( 2 ) excess rainfall after evaporation . r• 1s0
included is stt:+ra(D-e for, the %S year .- 4 hour storm for the location .
The volume. of waste. generated from -- given number of animals will be
constant throughout the year and from year to year ,, but excess
1"a:i nIfa,,11 wi 11 vary frcil1 year t0 Year The 25 year rainfall will no-
be a factor to consider in an annual pumping cycle , but this storage
volume; must always be available .
A maximum elevation ?s titer(hied in each design -to lbeg ii
pumpino and this is usually ivhe outlet invert of pipe( s ) from
buL1ding( s ) . If the outlet pipe is not installed at the elevation to
begin pumping , a perm-rient marker must be i ristalled at this elevation
to indicate when pimping should begin :, An a!-e ation, iiiLlst be estlabl;lshmod
to stop pumping to maintain lagoon treatment depth .
Pumping can be started or stopped e.`-t any time- between these 'two
elevations for Ci()er'at,irig convenience- as site conL3.tions permit- , such a
weather , soils , crop , and :uipnlwrit in order to apply WaSte Without
rurloff or le ach%nq .
.._and application of waste water i.s 'recognized' as an acceptable
method of disposal . Metro., of c_ip l i cation include slid set
center pivot , guns , and trciveling gun irrigation . Care Should b
fatten when a}`.pl,, ing waste to prevent damage to C'i"ops .
T he .following ?tams are to be carried out.
1 It is strongly recommended that the treatment lagoon be pre-
charged to 1./2 its to Prevent �aXC5SSi`J'e odors during
start--up . Pre-charging reduces the concentration of the i nit i al
•waste entering the lagoon thereby reducing 'odors ,. Solids should be
covered with effluent at all times „ Wheri prechaF gins; Is complat e.
flush builwll noµ with Y ,.:y'i. led laoo n !iq i_.d . Fresh i1 c'i siit:Jl..11d 1"'iot
be used for flushing after initial filling .
the att—ao"led waste t.lt)_1ization plan sh al1 be followed This
plalf recommends sampling and t es ing of waste ( see attachment )
before land application .
3 . Begin temporary storage pump--out of the lc")oon wh=-:n -f iwiial 1
reaches the elevation 97 .3 as rliarked by F''8r manent' mar i`.e'i" . Stop pump--
out when the fluid level reaches elevation 95,3 .. This temporary
storage % less 25 y'r-_.. 24 h st ..�rm,5 c:%: orita iris a-3922 ol,bi c Meet or
403337ga11ons .
SHEET 2 OF 2
4 . The recommended maximum amount to apply per irrigation is
on.,, ( i ) inch and the recommended maximum application .'ate is 0 .3
inch per hour . Refer to the waste utilization plan ail for further details ,
:tip Keep vegetation on the embankment and areas adjacent to ti"a
lagoon mowed annually . Vegetation should be fertilized as needed
to maintain a vigorous stand :.
i . Repair any eroded areas or areas damaged by rodents and
astiblish in vegetation ,
7 . All surface runoff is to be diverted from the Woon to stable
outlets .
8 . Keep a minimum of 25 feet of grass vegetated getated buffer around
waste utilization fields adjacent to perennial streams . Waste will
not be applied d in open. ditches . Do not ;,,:uff1,p within 200 feet of a
residence or within 100 feet of a well . Waste shall ba applied in a
manner not to reach other property .and public r iohtv"o1`...y+Jc ys.
9 . The Clean Water Pict of 1977 prohibits the discharge of
pollutants into waters of the United .'.states . The Department of
Environment , Health , and Natural Resources Division of Environ-
mental Management , has the responsibility for enforcing this law .