Loading...
HomeMy WebLinkAbout090125_Routine Inspection_20240425Type of Visit: . Compliance Inspection 0 Operation Review O Structure Evaluation p Technical Assistance Reason for Visit: ,,.O�_Rkoutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: ; U(jfipi Departure Time: v,`w/ County:A� Farm Name: ' /Z� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: ` 6zyn x5eylz�Tit►e: Onsite Representative Certified Operator: Back-up Operator: Location of Farm: Phone: Integrator: Certification Number: Certification Number: Latitude: Longitude: Region: ti Fri Wean to Finish Layer Dairy Cow Wean to Feeder Non -Layer Dairy Calf Feeder to Finish (07' Dairy Heifer Farrow to Wean Dry Cow f{ Farrow to Feeder I lNon-Dairy ;j Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder j: Boars Pullets Beef Brood Cow I� ,;"i` Turkeys Turkey Points in E Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify D WR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes J�o ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [—]Yes [allo ❑ NA ❑ NE [—]Yes []-No ❑ NA ❑ NE Page I of 3 511212020 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ,2'No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: [ Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes ,E ` o ❑ NA ❑ NE ❑ Yes FrNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes eNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? (not applicable to roofed pits, dry stacks, and/or wet stacks) ❑ Yes �o ❑ NA ❑ NE 9. Does any part of the waste management system other than the waste structures require [—]Yes PTNO ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E51No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Feko ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [71'No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 4E!rNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 2]"No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes E!fNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ,,FXNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ,®`No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [—]Yes .'No ❑ NA ❑ NE the appropriate box. ❑ WUP Checklists _]Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. .E"i'es ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard -PT<aste Analysis ❑ Soil Analysis ❑ Waste Transfers []Weather Code ❑ Rainfall ❑Stocking Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ,❑ No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ETVo ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facili Number: [Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes _E/rf o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes _L�FiNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey m1ure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon b �r % List structure(s) and date of first survey indicating non-compliance: i 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes _❑'No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes „®"No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes IP7Mo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes J2 No ❑ NA ❑ NE ❑ Yes d ' o ❑ NA ❑ NE ❑ Yes ❑'No ❑ NA ❑ NE ❑ Yes EDIRo ❑ NA ❑ NE [—]Yes ,E�l/o ❑ NA [INE ❑ Yes )"O ❑NA ❑NE a7,.e � dal 021) Reviewer/Inspector Name: Reviewer/Inspector Signature: Phone: Date: 511212020 Page 3 of 3 "CURy No. �`2 �� Time In Time Out Farm Name !'� a �.t cam✓ Integrarw Owner Site Rer Operator No. Back-up No. COC Circle: General or NPDES FREEBOARD: Design Observed Crop Yield Rain Gauge Soil Test Weekly Freeboard _ Spray/Freeboard, Drop _ Weather Codes Waste Analysis: Date Wettable Acres x Daily Rainfall 120 min inspections Nitrogen (N) Dace Sludge Survey / % t5 ��� 3 ./ C� Calibration/GPM —Z-% 2J2;L Waste Transfers Rain Breaker /'7I PLAT I� 1-in Inspections Date Nitrogen (N)