HomeMy WebLinkAboutNCC200311_NOT Closeout Documents_20240429 FINAL INSPECTION REPORT
Town of Huntersville- Land Development
105 Gilead Rd, Ste 300, Huntersville NC 28078
(704)-875-7007
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)should be requested by the
permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of
Termination Process.
NCGO1 COC# 'NCC200311
Project Name Northbrook
Financially Responsible Owner(FRO) Mark Hennigar-Lennar Carolinas LLC
FRO Address 6701 Carmel Commons Blvd,Suite 425,Charlotte NC 28226
Project Location 12145 McCord Rd
River Basin/Watershed Clarke
EC Final Inspection Date 3/12/2024 Start Time 13:00 End Time r 14:00
Inspector Name Anne Loftin
Others Present None
Weather Conditions Sunny Soil Conditions Workable
Onsite Contact Made No Name
Title/Company
Report Sent Yes See dispatch list at bottom of report
Erosion/Sediment measures removed? Yes
Site Permanently Stabilized? Yes
Comment
BMP's Installed Per Approved Plan? Yes
As-Built BMP Project# 454297 3/1/2024
FINAL INSPECTION COMMENTS
Project is completed,stable and the erosion measures removed. Future River Race Drive to be removed from construction plans with
Planning/Engineering oversight(sheet C3.4). Site reminded of the PC019(Declaration and Covenants)for the SCMs(sand filters)and
annual inspection requirements.
DISPATCH LIST
William DeForest<William.DeForest@Lennar.com>; Mark Henninger<mark.henninger@lennar.com>; David Peete
<dpeete@huntersville.org>; Andrew Cheek<acheek@huntersville.org>; Matt Reiking<mreiking@espassociates.com>; Sam
Stalls<Sam.Stalls@lennar.com>
1 of 1
Report Date: 3/28/2024