Loading...
HomeMy WebLinkAbout090040_Approval_20240312 , ROY COOPER _ Governor f ELIZABETH S.BISER ��` Secretary 4i""' 'RECEIVED RICHARD E.ROGERS,,JR. NORTH CAROLINA Director Environmental Quality MAR 12 2024 February 12,2024 Daniel T Alford NC DEQ/DWI A&H Hog Farm,LLC Central Office 6317 Lisbon Rd Clarkton,NC 28433 Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: Your facility is currently approved for operation under one of the Animal Waste Operation State Non-Discharge General Permits, which expire on September 30, 2024. In order to ensure your continued coverage under the State Non-Discharge General Permits, you must submit an application for permit coverage to the Division of Water Resources (DWR)by Apri13.2024. Enclosed you will find a "Request for Certificate of Coverage for Facility Currently Covered by an Expiring State Non-Discharge General Permit."The application form must be completed, signed by the Permittee,and returned to the DWR by April 3,2024. Mailing Address: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh,North Carolina 27699 1636 Email: animal.operationsAdeq.nc.gov phone:(919)707 9129 Please note that you must include one (1) cony of the Certified Animal Waste Management Plan (CAWMP) with the completed and signed application form. A list of items included in the CAWMP can be found on page 2 of the renewal application form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NC G.S. § 143-215.1 and could result in assessments of civil penalties of up to$25,000 per day. Copies of the animal waste operation State Non-Discharge General Permits are available at www.deg.nc.govlaniDalpernuts2024.General permits can be requested by writing to the address above. If you have any questions about the State Non-Discharge General Permits,the enclosed application,or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9129. Sincerely, A; Michael Pjetraj,Deputy Director Division of Water Resources Enclosures: Request for Certificate of Coverage for Facility Currently Covered by an Expiring State Non-Discharge General Permit Nor&Camliu DeparhmentoMrironmentalQur"ity Dhisienef tixResaurow ;12 Narth Ss]hbwy Stre6 1636 MaRSat-iceCentm Raidgk NerthCaralina 276W1636 919.7079129 State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non-Discharge General Permit On September 30, 2024,the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore,all applications must be received by the Division of Water Resources by no later than April 3,2024. Please do not leave any question unanswered Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. l. Certificate Of Coverage Number: AWS090040 2. Facility Name: A&H Hoc Farm,LLC 3. Permittee's Name(same as on the Waste Management Plan): Daniel T Alford 4. Permittee's Mailing Address: 6317 Lisbon Rd City: Clarkton State: NC Zip: 28433 Telephone Number: 910-991-6178 Ext. E-mail: 5. Facility's Physical Address: 320 Duncan Rd City: Clarkton State: NC Zip: 28433 6. County where Facility is located: Bladen 7. Farm Manager's Name(if different from Landowner): JdsAu u 1n/ f-f u yy ►� 8. Farm Manager's telephone number(include area code): 9 f o-e 7 q- 2 9 9. Integrator's Name(if there is not an Integrator,write"None"): Murphy-Brown LLC 10. Operator Name(OIC): Phone No.: 910_f q-Z�t Z OIC#: <18A+36&' oS rfv 11. Lessee's Name(if there is not a Lessee,write None"): fG('J9y�Z 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine-Feeder to Finish 3,672 Operation Types: Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses-Horses Wean to Feeder Dairy Heifer Laying Chickens Horses-Other Farrow to Finish Milk Cow Pullets Sheep-Sheep Feeder to Finish Dry Cow Turkeys Sheep-Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment Lagoons,Digesters and Waste Storage Ponds(WSP):(FillNerify the following information. Make all necessary corrections and provide missing data.) Structure Type Estimated Liner Type Estimated Design Freeboard Structure (Lagoon/Digester/ Date (Clay,Synthetic, Capacity Surface Area "Redline" Name WSP) Built Unknown) (Cubic Feet) (Square Feet) (Inches) 1 Lagoon 9 r 19.00 1 Lagoon 778,203.00 106,750.00 19.50 1 Lagoon Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.1OC(d), either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan(WUP),signed b% the owner and a certified technical specialist,containing: a. The method by which waste is applied to the disposal fields(e.g.irrigation,injection,etc.) b. A map of every field used for land application(for example:irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation(design,calculations,etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations,wetland determinations,or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list,please include the additional components with your submittal. (e.g.composting,digesters,solids separators,sludge drying system,waste transfers,etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included,this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than$10,000 or imprisonment of not more than 5 years,or both for a similar offense.) Print the Name of the Permittee/Landowner/Signing Official and Sign below.(If multiple Landowners exist,all landowners should sign. If Landowner is a corporation,signature should be by a principal executive officer of the corporation): Name(Print): Jold,u�• �✓ //G� f'✓1 S Title: ltle.4k., — Signature: / � Date: 3_ 7 1/ Name(Print): Title: Signature: Date: Name(Print): Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animal.operations@deq.ne.gov NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh,North Carolina 27699-1636 ... E Leo � o m _ ® ¢ O I Ql . W U O a7 L Q r� a .q na y G O N X v 7 V Q mincan Rd d a s u 'o Air jo� - y 0 x C-4 t . o o 0 LL � O1 a G 4 r � 13 � N O O - N � a • o` 5_1 G � m (D jm c c j Q N © d r V m _M X C tl L N Et J ` (+] } N 'CO l0 C N O N N co to [� m m r : m V V O x C, m L U3 N x.. O w N N (a U (a C' - O 1p�� � V N U N d >L � R ? } 0 i ro U- U v d L x O ® O rn C o; U 07 O O UJ (C " r V X O U -� Y AN121" WASTE MANAGRFDrNx PLAN CERTIFICATION FOR NEW OR EXPANDED FEEDLOTS Please return the completed form to the Division of Environmental Hnnagement at the addrean on the reverse aide of thin form. Name of farm (Please rant) :— Douglas A. Bordeaux Farm Address: Rt. Box140 t'1 i 7ahct-ht ni n, AT(' 28317 Phone NO. : 9 0 - County: R1arlPn Farm location: Latitude and Longitude:W _3j '-25't--U°-37-'_5Qre please attach a copy of a county road map with location identified.d) . Also, Type of operation (swine, layer, dairy, etc. ) : SWine Design capacity (number of animals) :_ 367? Feeder to Finish Average size of operation' (12 month population avg.) : _3672 Average acreage needed for land application of waste (acres) : 2_, -exax-aaaxyaar=aaaeaaxaaaasea=aaaaaaxa,aaaaaaaaq=aaaaaax=asatasaaaanxaaaaa xoaraa Technical SPecialiat Certification As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to iSA NCAC 6F .0005, I certify that the new or expanded animal waste management system as installed for the farm named above has an animal waste management plan that meets the design, construction, operation and maintenance standards and specifications of the Division of Environmental Management and the USDA-Soil Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 1SA NCAC 2H.0217 and 15A NCAC 6F .0001-,0005. The following elements and their corresponding minimum criteria have-been.verified by me or other designated technical specialists and are included in the plan as applicable: minimum separations (buffers) ; liners or equivalent for lagoons or waste storage ponds; waste storage capacity; adequate quantity and amount of and for waste utilization (or use of third party) ; access or ownership of proper waste application equipment; schedule for timing of applications; application rates; loading rates; and the control of the discharge of pollutants from stormwater runoff events less severe than the 25-year, 24-hour storm. Name of Technical. specialist (Please Print) : M. Kevin Weston Affiliation:_ Murphy Farms, Inc. Address (Agency) : PO Box 759 Rose Hlll NC 28458 Phone No(910) 289-2711 Ext 592 Signature: /?)`!• u�c.- ' Date: --.-; =xazaauaazacaxacaaxaaaaaaa:asaraaocy Ca=aaaaaaaaaaa=axxaaarJcStxa sass Owner/Manager Agreement I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for,the farm named above and will implement these procedures. I (we) know that any additional expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state either through a man-made conveyance or through runoff from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. Name of Land Owner (Please Print) : Douglas A. Bordeaux Signature: Date:_ /O f 1- f z' Name of manager, if different from owner (Please print) Signacure: Date- XQte: A change in land ownership requires notification or a new certification (if the approved Dian is changed) to be submitted to the Division of Environmental Management within 60 days of a title transfer. DE34 USE ONLX:ACNEW4 M00801100171 Murphy-Brown, LLC 6/8/2022 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): A&H Hog Farm, LLC Farm Name: A&H Hog Farm Facility 9-40 County: Bladen Permit Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish 3672 Gilts Boars Storage Structure: Anaerobic Lagoon Storage Period: >180 days Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWR regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 11 This plan is based on the waste application method shown above. If you choose to change methods in the future,you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made,which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan,if carried out,meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons,ft',tons,etc.): Ca aci Type Waste Produced perAnimal Total Farrow to Wean 3203 gaUyr gal/yr Farrow to Feeder 3881 gaUyr gal/yr Farrow to Finish 10478 gal/yr galtyr Wean to Feeder 191 gal/yr galtyr Wean to Finish 776 galtyr gal/yr 3672 Feeder to Finish 927 gaUyr 3,403,944 galtyr Gilts 1015 gaUyr gaUyr Boars 2959 gaUyr gaUyr Total 3,403,944 galtyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): Capacity Type Nitrogen Produced perAnimal Total 7Feeder ean 3.84 Ibstyr Ibstyr eder 6.95 Ibstyr Ibstyr inish 18.86 Ibstyr Ibstyr eder 0.34 Ibstyr Ibstyr ish 1.4 Ibstyr Ibstyr 3672inish 1.67 Ibstyr 6,132 Ibstyr Gilts 1.83 Ibstyr Ibstyr Boars 5.33 Ibs/yr Ibstyr Total 6,132 Ibstyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 18.99 Total N Required 1st Year: 6592.32 Total N Required 2nd Year: 0.00 Average Annual Nitrogen Requirement of Crops: 6,592.32 Total Nitrogen Produced by Farm: 6,132.24 Nitrogen Balance for Crops: (460.08) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics,and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of11 \k kk k a� Ilb R/ 22 §) !2 /« ]� ;< �\ f2 � k§ )In �k k zJ ]! \( co \ CL � \2 CL /§ o0 . / ]7 w or CL ) - � k z O a 0 7 J = O O 7 ~ I ga J G � Z yCLt- J� U 2 C � N a a I I v32 cZ cm O Q Q Q m Ca �V a N Z� O m z n < W — CL P� U Z m � �a a T o ss m} m E c. Q m U p av I � — m 'o c rn r 0 U m� C d m Q LL C Q u d g � I This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future,regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields(i.e.small grain,etc,interseeded in bermuda),forage must be removed through grazing,hay,and/or silage. Where grazing,plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain,etc,is to be removed for hay or silage,care should be exercised not to let small grain reach maturity,especially late in the season(i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation,you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season,depending on the time small grain is planted in the fall. The ideal time to interplant small grain,etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Description-Harvested As A Barley Grain Crop B Grazed Hybrid Bermudagrass Pasture/Grazed C Hybrid Bermudagrass Hay Hay B/C Comb. Hybrid Bermudagrass Graze/Hay Combination D Corn-Grain Grain Crop E Corn-Silage Silage F Cotton Cotton Lint G Grazed Fescue Pasture/Grazed H Fescue Hay Hay I Oats Grain Crop J Rye Grain Crop K Grazed Overseed Pasture/Grazed (Seeded in Bermudagrass) L Overseed Hay Hay(Seeded in Bermudagrass) M Grain Sorghum Grain Crop N Wheat Grain Crop O Soybean Grain Crop P Pine Trees Pine Trees S Small Grain Grain Crop/Hay(After Grain Crop) CC Cover Crop Not Harvested; Burned/Disked In SWG Swithgrass Biomass Crop Acres shown in the preceding table are considered to be the usable acres excluding required buffers,filter strips along ditches,odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may,and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of11 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PAN Nanimal Farm Totals r Farrow to Wean 0.8 Farrow to Feeder 0.96 Farrow to Finish 3.9 Wean to Feeder 0.07 Wean to Finish 0.27 3672 Feeder to Finish 0.34 1248.48 Gilts 0.39 I Boars 0.55 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1248.48 pounds of plant available nitrogen per year and will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 6 years,you will have approximately 6242.4 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre,you will need 20 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre,you will need 49.9392 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type,crop,and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture,water droplet size,and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan,it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations,the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for>180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5 of 11 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inlhr " inches T3235 Feld 1 NoB C 0.5 1 T3235 Field 2 GbA C 0.5 1 6of11 Additional Comments: This NUP revision takes out NPDES setbacks. Grower is not using the pulls. These fields will be applied on using a honeywagon or an Aerway machine. Rates have been updated. No other changes have been made. Grower has the option of utilizing 100 Ibs overseed following the guidance included. 7of11 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: A&H Hog Farm Facility 9-40 Owner: A&H Hog Farm,LLC Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system,or construction of new facilities,will require a new nutrient management plan and a new certification to be submitted to DWR before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWR upon request. Name of Facility Owner: A& H Hog Farm, LLC Signature: Date Name of Manager>(iferent 0from owner): Signature: Date Name of Technical Specialist: Toni W. King Affiliation: Murphy-Brown, LLC. Address: 2822 Hwy 24 West, PO Drawer 856 _ Warsaw, NC 28398 Telephone: (910)293-3434 Signature: ZZ- Date 8of11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393-Filter Strips). • 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See 'Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9of11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal.Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters,drainageways,or wetlands by discharge or by over-spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses,and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks,etc., shall not be discharged into the animal waste management system. 10 of 11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation.Vegetation such as trees, shrubs, and other woody species, etc.,are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage,or discharge. 18 If animal production at the facility is to be suspended or terminated,the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge,pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns,leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However,if animal waste is used on crops for direct human consumption,it should only be applied pre-plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate-determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 11 of 11 Updated Crop Management Practices for Bermuda Winter Overseed This document, as approved by the Interagency Nutrient Management Committee on October 10, 2017, hereby modified the July 13, 1998 Memorandum "Crop Management Practices for Select Forages Used in Waste Management". This modification updates the application window protocol for the 100 lb Nitrogen PAN rate for both Cereal Rye and Annual Ryegrass, as well as winter small grains. • Farms utilizing the 100 lbs./ac PAN rate for the overseed are allowed to apply no more than 50 lbs./ac PAN from October 1 through December 31 and no more than 50 lbs./ac PAN from January 1 through March 31. • Applications made during the months of December and January cannot exceed the combined total of 25 lbs./ac PAN for the two-month period. • The last application of animal waste is to be applied to the bermuda crop prior to September 30. • The PAN rate for grazed systems must be reduced by 25%. All other requirements of the July 13, 1998 Memorandum continue to apply. Those requirements include but are not limited to: • Cereal rye and annual ryegrass should be planted by October 15 to provide the best opportunity to get winter growth. • A harvest is required prior to heading or April 7, whichever comes first, for both cereal rye and annual ryegrass. This is necessary to minimize the potential for shading of emerging bermuda and reducing its yield. To favor the production of bermuda, additional harvest of annual ryegrass will be required when the ryegrass canopy reaches 12-15 inches height. These management requirements shall also apply to overseeded winter small grain. Nov 16, 2017 � 0 DD Y _< Mm " o ul 3cr z x n ca cr o o �� p a 0 co cQ v a N 1 u (D m :E v'i-. 00 tom f Q 1.� O O �1 4 A N01LdOO�� m N - N N �ICID 1 11 _ 1, a 7r CL rr'- ors-�---�'� -' ti' 'i '`• �'� 1 ,`�-'-L ,Ale- Alt I cz NOWA �r r 4 - 0 ^7 j SF ail EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) EMERGENCY MANAGEMENT SERVICES (EMS) ZU'A- (p-jc�o SOIL AND WATER CONSERVATION DISTRICT(SWCD) 3t15-1 NATURAL RESOURCES CONSERVATION SERVICE (NRCS) n - C41 -34Is"I COOPERATIVE EXTENSION SERVICE (CES) 1g�-cis This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation,this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow-possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste application field-actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s)that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred- C. Leakage from the waste pipes and sprinklers-action include: a) Stop recycle pump_ b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps- D. Leakage from flush systems, houses,solid separators-action include: a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house,flush systems,or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump,and pump back to lagoon. b) If holes are caused by burrowing animals,trap or remove animals and fill holes and compact with a clay type soil. c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 8 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury,fish kills,or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger(either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. if the spill leaves property or enters surface waters,call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice/technical assistance phone number. 4. If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name; Murphy Brown ILLG b. Contractors Address: P.O. Box 856, Warsaw, NC 28398 c. Contractors Phone: (910)293-3434 6. Contact the technical specialist who certified the lagoon(NRCS,Consulting Engineer, etc.) a. Name: Kraig Westerbeek b. Phone: (910)293-5330 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system,and reassess the waste management plan to keep problems with release of wastes from happening again. 9 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids (✓)Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed, ( } Remove bridging of accumulated solids at discharge Lagoons and Pits Crusted Solids (/)Maintain lagoons,settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30%of surface. Excessive Decaying vegetation (,/)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage () Design,operate and maintain feed systems(e.g.. bunkers and troughs)to minimize the accumulation of decaying wastage. (} Clean up spillage on a routine basis(e.g.7-10 day interval during summer;1530 day interval during winter). Feed Storage Accumulation of feed () Reduce moisture accumulation within and around residues immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment(e.g.,covered bin for brewer's grain and similar high moisture grain products). {) Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e.inspect for and remove or break up accumulated solids as needed). MIC—November 11, 1996 10 Dry Manure Handling Accumulations of animal ()Remove spillage on a routine basis(e.g.7-10 day Systems wastes interval during summer;15-30 days interval during winter)where manure is loaded for land application or disposal. {}Provide for adequate drainage around manure stockpiles ()Inspect for and remove or break up accumulated wastes in Ater strips around slocIVIes and manure handling areas as needed. The issues checked ( ) pertain to this operation. The landowner/integrator agrees to use sound judgment in applying insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. X `/ ner Signature) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC--November 11, 1996 ]l Swine Farm Waste Management—Odor Control Checklist Permit No.: `t'4 0 J�� Date: —q INSTRUCTIONS FOR USE Owner Signatu4 •Odor Control Checklist is required by General Statute 143.21S.10C(e)(1) •Check any/all the BMPS you will Implement on this facility. Items checked/selected become a reouirement of the CAW MP. • Items in bold or pre-selected are required. •Add any site-specific details related to the selected BMPS • Include any other odor control measures not listed ♦NOTE: Not all BMPS maybe cost-effective for every facility. Evaluate each BMP prior to selecting for your facility. Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices FARMSTEAD •Swine Production ❑Maintain vegetative or wooded buffers at or •Traps dust and gases,provides dilution near property boundary and visual screening •May require third party input/approval r Improper drainage ❑Grade and landscape so water drains away •Reduce odors and vectors that occur from facilities and prevent ponding with stagnant conditions ❑Maintain farm access roads and prevent traffic •Prevents spillage during transport and in waste application area tracking of waste onto public roads ❑Other BMPS—please describe MORTALITY MANAGEMENT •Carcass ® Dispose of mortality using method approved •Required by statute and permit Decomposition by NCDA&CS State Veterinarian.Manage •May require third party inputtapproval According to CAWMP(Mortality Management Cheddist)and permit(s). ❑ Put carcasses in refrigerated(or freezer)dead boxes within 24 hours for short-term mortality storage. ♦incomplete Incineration ❑ Use incinerators with secondary burners for .Reduce odors by complete incineration complete combustion. ❑Other BMPs—please describe Swine AMOC page t of 6 APPROVED—7/2S/2019 Swine Farm Waste Management—Odor Control Checklist Permit No.: 1_40 "use/Source BMP Option to Minimize Odor Comments Site Specific Practices HOUSE/BARN—WASTE HANDLING Flush tanks ❑Install flush tank covers .Pit-flush systems •Odorous Gases ❑Flush pits at least 4 times per day •Pit-flush systems ♦Partial microbial ❑ Empty pits at least once every 7 days •Pit-recharge or"pull-plug"systems decomposition ❑Underfloor flush with pit ventilation +Agitation of wastes ❑ Install/extend fill lines to near bottom of tanks with anti-siphon vents ❑ Install covers on outside waste collection or junction box ❑Install sump tank covers for lift stations a Ammonia ❑Flush/recharge with treated effluent ❑Treat waste In pits with proven biological or •Monitor for any solids accumulation in pit chemical additive ❑Other BMPs—please describe HOUSE/BARN—FLOOR AND INDOOR SURFACES r Manure covered floors ❑Scrape manure from alleys into pens daily •Will move with other manure via pits ❑Install fully slotted floor system ❑Install waterers over slotted floor area ❑Install feeders at high end of solid floors •where appl Ica ble •Odorous Gases ❑Scrape manure buildup from floors and walls &Aids in animal cleanliness ❑Keep floors dry •Aids in animal cleanliness ❑Install underfloor ventilation for drying ❑ Replace bedding/scrape at frequency to •Solid floor bedding systems keep bedding dry ❑Other BMPs—pleasedescribe Swine AMOC Page 2 of 6 APPROVED—7/25/2019 Swine Farm Waste Management—Odor Control Checklist Permit No.: ~4� Cause/Source BMP Option to Minimize odor Comments Site Specific Practices HOUSE/BARN—VENTILATION •Dust ❑Clean fans regularly—specify frequency ♦ Volatile/odorous gases ❑ Efficient air movement ❑Install temperature and humidity sensors to control ventilation ❑Treat barn exhaust •Examples:biofihers.wet scrubbing,windbreaks •May reduce ventilation rate depending on method ❑Other BMPs—pleasedescribe HOUSE/BARN—FEED •Dust ❑ Install feed covers ♦Adsorbed Gases ®Keep outdoor feed storage covered except •Required by rule]SA NCAC 02D.1902 When necessary to add/remove feed ❑Minimize free-fall height of dry feed ❑Install feed delivery downspout extenders to the feed covers ❑ Remove spoiled/unusable feed on regular basis ❑Feed pellets instead of dry meal •May require third party input/approval ❑Use feed additives •May require third party Input/approval • Ammonia ❑Use feed-reduced crude protein diet •May require third party input/approval ❑Other BMPs—please describe HOUSE/BARN—GENERAL a Dust ❑ Install temperature and humidity sensors •Maintain relative humidity at 40 to 65% •Odorous Gases to control ventilation ❑ Use ultraviolet light to treat Indoor air ❑Use indoor or outdoor electrostatic space •Can be used to treat exhaust air charge system ❑Other BMPs—please describe Swine AMOC Page 3 of 6 APPROVED—7/25/2019 Swine Farm Waste Management—Odor Control Checklist Permit NO.: Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAGOON/WASTE STORAGE SrRUCrURE • Volatile Gases ®Maintain proper lagoon volume a Sufficient liquid volume/depth is required for proper anaerobic treatment ❑ Minimize free-fall height of waste from discharge pipe to lagoon surface ❑Extend discharge point of pipe to below lagoon •Use caution not to scour or damage lagoon liner liquid level ❑Maintain proper surface area-to-volume ratio ❑Use correct lagoon start-up procedures ❑Aerate for odor control ®Manage sludge levels based on annual sludge survey as required by permit ❑Keep spilled feed or foreign debris out of lagoon to prevent excess sludge accumulation ❑ Install/use solids separation system ❑ Use proven biological or chemical additives •Monitor-for any increase in rate of solids accumulation ❑ Use permeable lagoon covers{not a digesterl ❑ Use impermeable lagoon cover or a Methane can be flared if not utilized anaerobic digester ❑Other BMPs—pleasedescribe LAND APPLICATION •Odorous gases ® Perform land application in accordance with CAWMP ♦Wind drift ®Pump intake near lagoon surface Required by rule 1SA NCAC 02D.1802 ❑Pump from second stage lagoon ❑ Follow good neighbor policy •Avoid application on known weekends, special days,or holidays/eves if possible ❑Operate at minimum recommended pressure ❑ Increase setbacks beyond those required by statute,rule.or permit Swine AMOC Page 4 of 6 APPROVED—7/25/2019 Swine Farm Waste Management—Odor Control Checklist Permit No.: q`40 Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAND APPLICATION(CONTINUED) ❑Apply during favorable wind conditions, •Recommend checking predicted average hourly (especially for traveling guns or impact wind speed within 24 hours prior to sprinklers) anticipated start ❑When practical,apply waste on sunny days •Allows for vertical dissipation of odor rather than cool,overcast days ❑When possible,apply waste midmorning to •Allows for better vertical dissipation of odor late-afternoon ❑For traveling guns,use taper-ring or taper•bofe 6 Less odor and drift than ring nozzles nozzles ❑For traveling guns,use largest-available nozzle that provides acceptable application uniformity [I Replace impact sprinklers with low-drift nozzles on center pivots and linear move systems. ❑Use hose-drag system ❑Use injection method for waste application []Other BMPs—please describe SLUDGE DISPOSAL •Odorous gases ❑Transport sludge in covered vehicles or tankers ❑Apply In thin,uniform layers •Speeds drying and prevents ponding ❑Incorporate land-applied sludge as soon as •Required within 48 hours or prior to next rain event, practical after application,and in accordance whichever is first,for conventionally tilled with permit. bare soils ❑Use injection method for sludge application ❑Dewater sludge prior to application ❑Use alternatives to land application,such as compost,gasification,energy generation,etc. ❑Other BMPs—please describe Swine AMOC Page 5 of 6 APPROVED—7/25/2019 ADDITIONAL INFORMATION AVAILABLE FROM: Air Management Practices Assessment Tool(AMPAT) www.extension.iastate.edu/ampat/ AHG-539-A Certification Training for Animal Waste Management Systems:Type A NC Division of Water Resources E8AE 103-83—lagoon Design and Management for Livestock Manure Treatment and Storage www.bae.ncsu,edu EBAE 128-88—Swine Production Facility Manure Management;Pit Recharge-Lagoon Treatment www.bae.rtcsu.edu EBAE 129-88—Swine Production Facility Manure Management:Underfloor Flush-Lagoon Treatment www.bae.ncsu.edu EBAE Fact Sheet—Calibration of Manure and Wastewater Application Equipment www.bae.ncsu.edu EBAE Fact Sheet—Swine Production Farm Potential Odor Sources and Remedies www.bae.ncsu.edu NC MRCS Standard 359—Waste Treatment Lagoon www.nrc3.udsa.gov NC NRCS Standard 380=Windbreak/Shelterbelt Establishment www.nres.udsa_gov NC MRCS Standard 422—Hedgerow Planting www.nres.udsa.gov NC NRCS Standard 442—Sprinkler System www.nrcs.udsa.gov Nuisance Concerns in Animal Manure Management:Odors and Flies;PRO107199S Conference Proceedings Florida Cooperative Extension Service Options for Managing Odor:A Report from the Swine Odor Task Force NC State University Swine AMOC Page 6 of 6 APPROVED—7/25/2019 verston--November 26,2018 Mortality Management Methods indicate which method(s)will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality Q ❑ Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table.Attach burial location map and plan. Landfill at municipal solid waste facility permitted by NC DEQ under GS I SA NCAC 13B.0200. Rendering at a rendering plant licensed under G.S. 106-168.7. Comprete incineration according to 02 NCAC 52C.0102. ❑ A composting system approved and permitted by the NC Department of Agriculture&Con- sumer Services Veterinary Division(attach copy of permit). If compost is distributed off-farm, additional requirements must be met and a permit is required from NC DEQ. ❑ In the case of dead poultry only,placing in a disposal pit of a size and design approved by the NC Department of Agriculture&Consumer Services(G.S. 106-549.70). ❑ Any method which,in the professional opinion of the State Veterinarian,would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm-specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options;contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&GS Veterinary Division regulations and guidance_ • Mass burial sites are subject to additional permit conditions(refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. 20 - �1/ z 2- g a o rm Owner/Manager Date Signature of Technical Specialist Date Ope jr:D. BORDEAUX County: BLADEN Date: 08/10/94 Distance to nearest residence (other than owner): 2000_0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. = 0 lbs 0 sows (farrow to feeder) x 522 lbs. = 0 lbs 3672 head (finishing only) x 135 lbs. = 495720 lbs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs Describe other e Total Average Live Weight = 495720 lbs 2_ MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 495720 lbs. ALW x Treatment Volume(CF)/lb. ALW Treatment Volume(CF)/lb_ ALW = 1 CF/lb. ALW Volume = 495720 cubic feet 3_ STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4_ TOTAL DESIGNED VOLUME Inside top length (feet) -- - --- 350.0 Inside top width (feet) - 305.0 Top of dike elevation (feet) — 95.7 Bottom of lagoon elevation (feet) - 85.7 Freeboard (feet)- - 1.0 Side slopes (inside lagoon) 3.0 1 Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3_0 3.0 3.0 3.0 344.0 299.0 9.8 AREA OF TOP LENGTH ' WIDTH = 344.0 299.0 102856 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 290_0 245_0 71050 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH WIDTH 4 317_0 272.0 344896 (AREA OF MIDSECTION * 4) CU_ FT. _ [AREA TOP. + (4*AREA MIDSECTION) + AREA BOTTOM] DEPTH/6 102856.0 344896_0 71050.0 1_5 Total Designed Volume Available = 778203 CU. FT. 1 5. fEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 350.0 305.0 106750.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL DA 106750.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Feces & urine production in gal./day per 135 lb. ALW 1.37 Volume = 495720 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days Volume = 905515 gals. or 121058.2 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons Volume = 0.0 cubic fleet per CF 5C. Volume of .rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 62270.8 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 7.5 inches / 12 inches per foot * DA Volume = 66718.8 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 121058 cubic feet 5B. 0 cubic feet 5C. 62271 cubic feet 5D. 66719 cubic feet TOTAL 250048 cubic feet 6. SUMMARY Temporary storage period==-- -- -=) 180 days Rainfall in excess of evaporation==-- —) 7.0 inches 25 year - 24 hour rainfall- -- ) 7.5 inches Freeboard- _ - ) 1.0 feet Side slopes ) 3.0 _ 1 Inside top length— - -- _ ) 350.0 feet Inside top width - -- ) 305.0 feet Top of dike elevation=-- - -- ) 95.7 feet Bottom of lagoon elevation-- - - ) 85.7 feet Total required volume =_ -_- -- ) 745768 cu. ft. * Actual design volume ) 778203 cu. ft. * Seasonal high watertable elevation (SHWT)=) 90.0 feet Stop pumping elev. ) 91.8 feet Must be ) or = to the SHWT elev- -__ �) 90.0 feet Must be ) or = to min. req. treatment el.=) 91.7 feet Required minimum treatment volume- --__) 495720 cu. ft. Volume at stop pumping elevation— -_ - -_) 495851 cu. ft. Start pumping elev. _- _-- --_ * 94_0 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall=) 711484 cu_ ft. Volume at start pumping elevation --) 707145 cu. ft. Required volume to be pumped =— ---- ---) 183329 cu. ft. * Actual volume planned to be pumped- ---- ) 211294 cu. ft. * Min. thickness of soil liner when required=) 1.5 feet ,s 7. DESIGNED BY: h _ -c! f APPROVED BY: � DATE: g/l0/9 I DATE: Q �¢ NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: OPERATION S MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant(such as wintertime for bermudagrass)or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter/early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer/early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year,24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: • Maintenance of a.vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, If needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. • Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying,the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes,and Overflow Pipes--look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes l 2 Lagoon surface --look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment--look for: 1. settlement, cracking, or"jug" holes 2. side slope stability--slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps —check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. • Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height 3 Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occur at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 • Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. • Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). • Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer I early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. • Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. • Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. • Maintain strict vegetation, rodent, and varmint control near lagoon edges. • Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by- 5 • proper lagoon sizing, • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and • require more land to properly use the nutrients. Removal techniques: • dire a custom applicator. • Mix the sludge and lagoon liquid with a chopper-agitator impeller pump through large- bore sprinkler irrigation system onto nearby cropland;and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag-line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil-test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. 6 r ^ The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure--an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levels—high levels are a safety risk. • Failure to inspect and maintain the dam. • Excess surface water flowing into the lagoon. • Liner integrity — protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. 7