Loading...
HomeMy WebLinkAboutNCS000294 DMR SW (8)Permit Number NCS 000294 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Vin) V 25 2015 SAMPLES COLLECTED DURING CALENDAR YEAR: 2015 (This monitortiig report shall be received by the Division•no later than 30'days-fiom the date the facility receives the sampling results from the laboratory.) FACILITY NAME Southern States Cooperative-Creedmoor PERSON COLLECTING SAMPLE(S) Andrew Rodak CERTIFIED LABORATORY(S) Environmental Science Corporation Lab # ENV375 Lab # Part A: Specific Monitoring Requirements COUNTY Granville PHONE NO. (_919_) 528-1516 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Outfall No. Date Sample Collected m /L m m m /L m m Rainfall Duration pH, Standard Units Sulfate, 9056 BOD, SM5210B COD, 410.4 Ammonia Nitrogen, 350.1 Nitrate- Nitrite, 9056 Total Phosphorus, 365.1 Benchmark mo/dd/yr Minutes (6.0-9.0) 250 30 120 7.2 10 2 Outfall 3 East 10/31/15 NO DISCHARGE Outfall 1 west 10/31/15 NO DISCHARGE Outfall No. Date Sample Collected m /L m /L m L Rainfall pH, Standard Kjeldahl Suspended Total Nitrogen Duration Units Nitrogen, Solids, TKN, 351.2 2540D Benchmark mo/dd/ r Minutes 6.0-9.0 20 100 30 Outfall 3 East 10/31/15 NO DISCHARGE Outfall 1 west 10/31/15 NO DISCHARGE Form SWU-247, last revised 2/2/2012 Pagel of 2 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X no (if yes, complete Part B) Part R_- Vehicle Maintenance Activitv MonitorinLy Requirements ------- - ------ -------------- -- Outfall Date No. Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT -HEM), if appl. Total Suspended Solids pH New Motor Oil Usage mo/dd/ r MG inches m /l m /I unit al/mo STORM EVENT CHARACTERISTICS: Date Total Event Precipitation (inches): Event Duration (hours): _ (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Energy, Mineral, and Land Resources Attn: Central Files 1612 Mail Service Center Raleigh, North Carolina 27699-1612 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, in ng the possibilit of fines and imprisonment for knowing violations." 11-�3-IS (Signature of P(r ittee) (Date) Form SWU-247,1ast revised 2/2/2012 f+ Page 2 of 2 s Permit Number NCS 000294 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT SAMPLES COLLECTED DURING CALENDAR YEAR: 2015 (This monrt6rtdg-report•shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Southern States Cooperative-Creedmoor PERSON COLLECTING SAMPLE(S) Andrew Rodak CERTIFIED LABORATORY(S) Environmental Science Corporation Lab # ENV375 Lab # Part A: Specific Monitoring Requirements COUNTY Granville PHONE NO. (_919, 528-1516 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Outfall No. Benchmark Date Sample Collected mo/dd/yr Rainfall Duration Minutes m /L m m /L m /L m m pH, Standard Units (6.0-9.0) Sulfate, 9056 250 BOD, SM5210B 30 COD, 410.4 120 Ammonia Nitrogen, 350.1 7.2 Nitrate- Nitrite, 9056 10 Total Phosphorus, 365.1 2 Outfall 3 East Outfall I west 10/31/15 10/31/15 NO DISCHARGE NO DISCHARGE Outfall No. Date Sample Collected Rainfall Duration pH, Standard Units m /L Kjeldahl Nitrogen, TKN, 351.2 m m Suspended Total Nitrogen Solids, 2540D .Benchmark mo/dd/ r Minutes 6.0-9.0 20 1100 30 Outfall 3 East Outfall 1 west 10/31/15 10/31/15 NO DISCHARGE NO DISCHARGE Form SWU-247, last revised 212/2012 Page 1 of 2 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X no (if yes, complete Part B) Part B: Vehicle Maintenance Activitv Monitoring Requirements :Outfall Date No: Sample .Collected ._� - 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT -HEM), if appl. Total Suspended Solids- pH - New Motor 'Oil Usage mo/dd/ r MG inches mg/1 mg/1 unit al/mo STORM EVENT CHARACTERISTICS: Date Total Event Precipitation (inches): Event Duration (hours): _ (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Energy, Mineral, and Land Resources Attn: Central Files 1612 Mail Service Center Raleigh, North Carolina 27699-1612 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, in ng the possibili of fines and imprisonment for knowing violations." _ Il -x3.15 - (Signature of P r ittee) (Date) Form S WU-247, last revised 21212012 ' Page 2 of 2