HomeMy WebLinkAbout20231101 Ver 1_More Info Received_20240426 (2)Baker, Caroline D
From:
Wallace, Sean <sean.wallace@wsp.com>
Sent:
Friday, April 26, 2024 2:42 PM
To:
Davis, Brooke A CIV USARMY CESAW (USA)
Cc:
Cutler, James; Leslie, Andrea J; Winston, Joey; Bowers, Todd; Homewood, Sue; Micheal
Clough (Michael.Clough@duke-energy.com); Gulec Dincer, Sukran; Rahu, Shahid;
Taylor, Mark; Hiner, Charles Dale
Subject:
[External] SAW-2015-01426 - Duke Energy Cliffside Dam Decommissioning: Request
for Additional Information Submittal
Attachments:
Final_CLS-U5IAB-USACE-RAI_3 Response_04-26-2024.pdf
Follow Up Flag:
Flag Status:
Follow up
Flagged
Some people who received this message don't often get email from sean.wallace@wsp.com. Learn why this is important
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Brooke:
Good afternoon, I left you a voicemail at work because I was not able to get through on your mobile yesterday. On
behalf of Duke Energy Progress, LLC (Duke Energy), WSP USA Environment & Infrastructure Inc. (WSP) is submitting the
attached revised response to the US Army Corps of Engineers' Request for Additional Information dated December 15,
2023, regarding SAW-2015-01426 (Duke Energy Unit 5-Dam Decommissioning Individual Permit). Duke Energy and WSP
have gone through extensive redesign changes and has provided an alternative design (i.e., West 2A) which includes a
reduced impact to Wetland C and provides a completed outfall design at the broad Broad River.
If you and/or the other agencies need further information or have additional questions, please feel free to reach out to
me, Jim Cutler (WSP) or Michael Clough (Duke Energy).
Best,
SRW
AWL
Sean R. Wallace, PWS, PMP
Associate Scientist, Asst. VP
Environmental Impact Assessment & Permitting
(M) 1770-286-7916
(F) 1910-791-1338
(0) 1910-632-5033
wsp.com
From: Wallace, Sean
Sent: Friday, December 15, 2023 10:41 AM
To: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil>
Cc: Cutler, James <james.cutler@wsp.com>; andrea.leslie@ncwildlife.org; Winston, Joey <joey.winston@deq.nc.gov>;
Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue <sue.homewood@deq.nc.gov>; Tollie, Lori White
<lori.tollie@duke-energy.com>; Daly, Ken <ken.daly@wsp.com>; Micheal Clough (Michael.Clough@duke-energy.com)
<Michael.Clough@duke-energy.com>; Gulecdincer, Basak <basak.gulecdincer@wsp.com>; Gay, Jan
<jan.gay@wsp.com>; Atkinson, Daniel <daniel.e.atkinson@wsp.com>; Rahu, Shahid <Shahid.Rahu@duke-energy.com>;
Ferral, Pam <Pam.Ferral@wsp.com>
Subject: SAW-2015-01426 - Duke Energy Cliffside Dam Decommissioning: Request for Additional Information Submittal
Brooke:
Good morning, on behalf of Duke Energy Progress, LLC (Duke Energy), WSP USA Environment & Infrastructure Inc. (WSP)
is submitting the attached response to the US Army Corps of Engineers' Request for Additional Information dated
October 24, 2023, regarding SAW-2015-01426 (Duke Energy Unit 5-Dam Decommissioning Individual Permit). If you
need further information or have any questions, please feel free to reach out to me, Jim Cutler (WSP) or Lori Tollie (Duke
Energy).
Happy Holidays,
SRW
awl
Sean R. Wallace, PWS, PMP
Associate Scientist, Asst. VP
Environmental Impact Assessment & Permitting
(M) 1770-286-7916
(F) 1910-791-1338
(0) 1910-632-5033
wsp.com
From: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil>
Sent: Tuesday, November 7, 2023 6:36 AM
To: Wallace, Sean <sean.waIlace@wsp.com>
Cc: Cutler, James <james.cutler@wsp.com>; andrea.leslie@ncwildlife.org; Winston, Joey <joey.winston@deg.nc.gov>;
Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue <sue.homewood@deg.nc.gov>; Tollie, Lori White
<lori.tollie@duke-energy.com>; Daly, Ken <ken.daly@wsp.com>; Micheal Clough (Michael.Clough@duke-energy.com)
<Michael.Clough@duke-energy.com>; Gulecdincer, Basak <basak.gulecdincer@wsp.com>; Gay, Jan
<jan.gay@wsp.com>; Atkinson, Daniel <daniel.e.atkinson@wsp.com>
Subject: RE: SAW-2015-01426 Duke Energy Cliffside Dam Decommissioning
Good Morning Sean,
The request for a time extension to December 15, 2023 to respond to comments and requests for additional information
is granted. Please let me know if you have questions or concerns.
Sincerely,
Brooke
From: Wallace, Sean <sean.waIlace@wsp.com>
Sent: Monday, November 6, 2023 4:41 PM
To: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil>
Cc: Cutler, James <james.cutler@wsp.com>; andrea.leslie@ncwildlife.org; Winston, Joey <joey.winston@deg.nc.gov>;
Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue <sue.homewood@deg.nc.gov>; Tollie, Lori White
<lori.tollie@duke-energy.com>; Daly, Ken <ken.daly@wsp.com>; Micheal Clough (Michael.Clough@duke-energy.com)
<Michael.Clough@duke-energy.com>; Gulecdincer, Basak <basak.gulecdincer@wsp.com>; Gay, Jan
<jan.gay@wsp.com>; Atkinson, Daniel <daniel.e.atkinson@wsp.com>
Subject: [Non-DoD Source] RE: SAW-2015-01426 Duke Energy Cliffside Dam Decommissioning
Brooke:
On behalf of Duke Energy Progress, LLC (Duke Energy), WSP USA Environment & Infrastructure Inc. (WSP) is respectfully
requesting an extension of the US Army Corps of Engineers Request for Additional Information correspondence, dated
November 7, 2023, deadline to December 15, 2023. This will provide Duke Energy additional time to review alternative
engineering designs that are being developed by WSP for the Cliffside U51AB Dam Decommissioning project.
Please accept this email as Duke Energy's formal request for a project extension. If you need any additional information
or have any questions, please contact me and/or Ms. Lori Tollie with Duke Energy.
Best,
SRW
Sean R. Wallace, PWS, PMP
Associate Scientist, Asst. VP
Environmental Impact Assessment & Permitting
(M) 1770-286-7916
(F) 1910-791-1338
(0) 1910-632-5033
wsp.com
From: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil>
Sent: Tuesday, October 24, 2023 8:23 AM
To: Tollie, Lori White <lori.tollie@duke-energy.com>
Cc: Wallace, Sean <sean.waIlace@wsp.com>; Cutler, James <james.cutler@wsp.com>; andrea.leslie@ncwildlife.org;
Winston, Joey <joey.winston@deg.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue
<sue. homewood @deg. nc.gov>
Subject: SAW-2015-01426 Duke Energy Cliffside Dam Decommissioning
Good Morning Lori,
The Public Notice comment period ended for the above -referenced project on October 23, 2023. Please find the
attached comments from the Corps regarding the Individual Permit application, and response to the Public Notice from
other external agencies for the above -referenced project. Responses to our and other agency comments (where
applicable) are due by the close of business on November 7, 2023. If you need additional time or have questions or
concerns, please let me know.
Thank you,
Brooke
Brooke Davis
Regulatory Project Manager
USACE Wilmington District -Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
Office: 828-271-7980, ext. 4232
Cell: 828-507-0005
brooke.a.davis@usace.army.mil
NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to
restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying,
alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an
authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and
destroy any printed copies.