Loading...
HomeMy WebLinkAbout20231101 Ver 1_More Info Received_20240426 (2)Baker, Caroline D From: Wallace, Sean <sean.wallace@wsp.com> Sent: Friday, April 26, 2024 2:42 PM To: Davis, Brooke A CIV USARMY CESAW (USA) Cc: Cutler, James; Leslie, Andrea J; Winston, Joey; Bowers, Todd; Homewood, Sue; Micheal Clough (Michael.Clough@duke-energy.com); Gulec Dincer, Sukran; Rahu, Shahid; Taylor, Mark; Hiner, Charles Dale Subject: [External] SAW-2015-01426 - Duke Energy Cliffside Dam Decommissioning: Request for Additional Information Submittal Attachments: Final_CLS-U5IAB-USACE-RAI_3 Response_04-26-2024.pdf Follow Up Flag: Flag Status: Follow up Flagged Some people who received this message don't often get email from sean.wallace@wsp.com. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Brooke: Good afternoon, I left you a voicemail at work because I was not able to get through on your mobile yesterday. On behalf of Duke Energy Progress, LLC (Duke Energy), WSP USA Environment & Infrastructure Inc. (WSP) is submitting the attached revised response to the US Army Corps of Engineers' Request for Additional Information dated December 15, 2023, regarding SAW-2015-01426 (Duke Energy Unit 5-Dam Decommissioning Individual Permit). Duke Energy and WSP have gone through extensive redesign changes and has provided an alternative design (i.e., West 2A) which includes a reduced impact to Wetland C and provides a completed outfall design at the broad Broad River. If you and/or the other agencies need further information or have additional questions, please feel free to reach out to me, Jim Cutler (WSP) or Michael Clough (Duke Energy). Best, SRW AWL Sean R. Wallace, PWS, PMP Associate Scientist, Asst. VP Environmental Impact Assessment & Permitting (M) 1770-286-7916 (F) 1910-791-1338 (0) 1910-632-5033 wsp.com From: Wallace, Sean Sent: Friday, December 15, 2023 10:41 AM To: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil> Cc: Cutler, James <james.cutler@wsp.com>; andrea.leslie@ncwildlife.org; Winston, Joey <joey.winston@deq.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue <sue.homewood@deq.nc.gov>; Tollie, Lori White <lori.tollie@duke-energy.com>; Daly, Ken <ken.daly@wsp.com>; Micheal Clough (Michael.Clough@duke-energy.com) <Michael.Clough@duke-energy.com>; Gulecdincer, Basak <basak.gulecdincer@wsp.com>; Gay, Jan <jan.gay@wsp.com>; Atkinson, Daniel <daniel.e.atkinson@wsp.com>; Rahu, Shahid <Shahid.Rahu@duke-energy.com>; Ferral, Pam <Pam.Ferral@wsp.com> Subject: SAW-2015-01426 - Duke Energy Cliffside Dam Decommissioning: Request for Additional Information Submittal Brooke: Good morning, on behalf of Duke Energy Progress, LLC (Duke Energy), WSP USA Environment & Infrastructure Inc. (WSP) is submitting the attached response to the US Army Corps of Engineers' Request for Additional Information dated October 24, 2023, regarding SAW-2015-01426 (Duke Energy Unit 5-Dam Decommissioning Individual Permit). If you need further information or have any questions, please feel free to reach out to me, Jim Cutler (WSP) or Lori Tollie (Duke Energy). Happy Holidays, SRW awl Sean R. Wallace, PWS, PMP Associate Scientist, Asst. VP Environmental Impact Assessment & Permitting (M) 1770-286-7916 (F) 1910-791-1338 (0) 1910-632-5033 wsp.com From: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil> Sent: Tuesday, November 7, 2023 6:36 AM To: Wallace, Sean <sean.waIlace@wsp.com> Cc: Cutler, James <james.cutler@wsp.com>; andrea.leslie@ncwildlife.org; Winston, Joey <joey.winston@deg.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue <sue.homewood@deg.nc.gov>; Tollie, Lori White <lori.tollie@duke-energy.com>; Daly, Ken <ken.daly@wsp.com>; Micheal Clough (Michael.Clough@duke-energy.com) <Michael.Clough@duke-energy.com>; Gulecdincer, Basak <basak.gulecdincer@wsp.com>; Gay, Jan <jan.gay@wsp.com>; Atkinson, Daniel <daniel.e.atkinson@wsp.com> Subject: RE: SAW-2015-01426 Duke Energy Cliffside Dam Decommissioning Good Morning Sean, The request for a time extension to December 15, 2023 to respond to comments and requests for additional information is granted. Please let me know if you have questions or concerns. Sincerely, Brooke From: Wallace, Sean <sean.waIlace@wsp.com> Sent: Monday, November 6, 2023 4:41 PM To: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil> Cc: Cutler, James <james.cutler@wsp.com>; andrea.leslie@ncwildlife.org; Winston, Joey <joey.winston@deg.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue <sue.homewood@deg.nc.gov>; Tollie, Lori White <lori.tollie@duke-energy.com>; Daly, Ken <ken.daly@wsp.com>; Micheal Clough (Michael.Clough@duke-energy.com) <Michael.Clough@duke-energy.com>; Gulecdincer, Basak <basak.gulecdincer@wsp.com>; Gay, Jan <jan.gay@wsp.com>; Atkinson, Daniel <daniel.e.atkinson@wsp.com> Subject: [Non-DoD Source] RE: SAW-2015-01426 Duke Energy Cliffside Dam Decommissioning Brooke: On behalf of Duke Energy Progress, LLC (Duke Energy), WSP USA Environment & Infrastructure Inc. (WSP) is respectfully requesting an extension of the US Army Corps of Engineers Request for Additional Information correspondence, dated November 7, 2023, deadline to December 15, 2023. This will provide Duke Energy additional time to review alternative engineering designs that are being developed by WSP for the Cliffside U51AB Dam Decommissioning project. Please accept this email as Duke Energy's formal request for a project extension. If you need any additional information or have any questions, please contact me and/or Ms. Lori Tollie with Duke Energy. Best, SRW Sean R. Wallace, PWS, PMP Associate Scientist, Asst. VP Environmental Impact Assessment & Permitting (M) 1770-286-7916 (F) 1910-791-1338 (0) 1910-632-5033 wsp.com From: Davis, Brooke A CIV USARMY CESAW (USA) <Brooke.A.Davis@usace.army.mil> Sent: Tuesday, October 24, 2023 8:23 AM To: Tollie, Lori White <lori.tollie@duke-energy.com> Cc: Wallace, Sean <sean.waIlace@wsp.com>; Cutler, James <james.cutler@wsp.com>; andrea.leslie@ncwildlife.org; Winston, Joey <joey.winston@deg.nc.gov>; Bowers, Todd <bowers.todd@epa.gov>; Homewood, Sue <sue. homewood @deg. nc.gov> Subject: SAW-2015-01426 Duke Energy Cliffside Dam Decommissioning Good Morning Lori, The Public Notice comment period ended for the above -referenced project on October 23, 2023. Please find the attached comments from the Corps regarding the Individual Permit application, and response to the Public Notice from other external agencies for the above -referenced project. Responses to our and other agency comments (where applicable) are due by the close of business on November 7, 2023. If you need additional time or have questions or concerns, please let me know. Thank you, Brooke Brooke Davis Regulatory Project Manager USACE Wilmington District -Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Office: 828-271-7980, ext. 4232 Cell: 828-507-0005 brooke.a.davis@usace.army.mil NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.