Loading...
HomeMy WebLinkAboutNCS000020_Benchmark Exceedance_20240501 Peterson, Kathryn S From: Eplin, Jerry W Sent: Wednesday, May 1, 2024 12:58 PM To: Peterson, Kathryn S Subject: FW: [External] Duke Energy - McGuire Nuclear Station - NCS000020 Tier I Notification - Copper &Zinc Benchmark Exceedances Importance: High FYI,for your response. Jerry W. Eplin, PE Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Office: (704)235-2147 Email: merry.eplina-deg.nc.gov Physical and Mailing Address: 610 E. Center Ave. Suite 301 Mooresville, NC 28115 D,E QR&-'-� 1lppnelmrnirol Ennronrndiial S�.xliYy Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Safrit, Don <Don.Safrit@duke-energy.com> Sent:Wednesday, May 1, 2024 9:06 AM To: Eplin,Jerry W<jerry.eplin@deq.nc.gov> Cc: Beaver, Gregory Thomas<Gregory.Beaver@duke-energy.com> Subject: [External] Duke Energy- McGuire Nuclear Station - NCS000020 Tier I Notification -Copper&Zinc Benchmark Exceedances Importance: High CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Jerry, Please accept this email as the two-week notification as required by Part D, Condition D-5,Table 2(ii) regarding the industrial stormwater system serving the McGuire Nuclear Station. 1 On April 9, 2024, quarterly stormwater samples were collected and analyzed in accordance with NCS000020. Analytical results for ISWO04 (ROS) were received by Duke Energy on April 22, 2024. Upon review of the results, it was observed that benchmarks for Copper & Zinc were exceeded. The benchmark for Copper is 10 ug/L and the analytical result was 13 ug/L. The benchmark for Zinc is 126 ug/L and the analytical result was 146 ug/L. We will document these exceedances and our response/actions within our SWPPP per Part D, Condition D-5. We will also document within our SWPPP the other obligations addressed in Table 2. If any questions or if further discussions are needed, please do not hesitate to contact either Greg Beaver, McGuire Environmental Field Support Professional, (704-642-6845 Cell or gregory.beaver@duke-energy.com) or me via my contact information below. Thanks Don Donald (Don)Safrit, P.E Lead Environmental Specialist Duke Energy I Permitting and Compliance, Carolinas 410 S.Wilmington Street I Raleigh, North Carolina 27601 Office: (919) 546-6146 1 Cell: (984) 209-0940 fDUKE ENERGY, Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 2 Peterson, Kathryn S From: Peterson, Kathryn S Sent: Wednesday, May 1, 2024 3:09 PM To: Don.Safrit@duke-energy.com; gregory.beaver@duke-energy.com Cc: Eplin, Jerry W Subject: McGuire Nuclear Station Copper &Zinc Exceedance Hi Don, The Mooresville Regional Office has received your exceedance date and value for ISWO04 at the McGuire Nuclear Station. Please continue to follow the procedures listed in Table 2:Tier One Response for a Benchmark Exceedance in Part D, Condition D-5, Table 2(ii) of your individual permit coverage under NCS000020. Let us know if you need any technical assistance. Best, Kathryn Kathryn Peterson Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources Office: (704) 235-2201 Mobile: (980) 435-7852 Email: kathryn.peterson@deq.nc.gov Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 D Q7 r 'I -.E7 . !! V i TH RROL� Mr' r . parIMOnt of Env'yonmental Qu + r � r � r 1