HomeMy WebLinkAbout20010635 Ver 1_Stormwater Info_20030327Mountain Air Country Club Banks Creek Area New Nine Hole Golf Course Stormwater Drainage Installation Specifications March 27, 2003 Mountain Air County Club Stormwater Drainage Installation Overview WORK TEAMS A-TEAM: Sediment Control Team: • Establishes groundcover • Maintains stream diversions • Maintains required logs • Monitors weather forecast B-TEAM: Installation Team: • Installs Pipes • Installs and constructs structures In order to reduce the risk of breaches of the Sediment Pollution Control Act during pipe installation in the streams and trout buffers, Mountain Air has prepared a document that identifies the order and methods used for each specific segment of construction. The construction tasks for each hole are identified along with the details that will be followed during its construction. The Teams will be briefed at the start of each workday and will be informed of the 10 day forecast. This booklet and a complete copy of the construction documents and sediment control plan will be maintained onsite with the NPDES Stornzwater Logs. The Sediment Control Crew will be tasked with maintaining all sediment pollution control logs. Mountain Air has determined that by creating work teams the chance of sediment leaving the site will be reduced. The Teams will be tasked with specific work tasks and will be under the joint supervision of the Construction Manager, who has been certified under the state-sanctioned Clean Water Contractor program. STANDARDS AND DETAILS Silt Fence Culvert Headwall and Outlet Temporary Diversion Ditch Temporary Sediment Trap Spring Box Check Dam Permanent Diversion Creek Diversion Detail Rip-Rap Inlet Protection Drop Inlet Protection Culvert Stone Headwall Apron Inlet Keying RCP Pipes on Steep Slopes Bridge Temporary Stream Crossing Sediment Pit Detail Plunge Pool Culvert Endwall for Single and Double Culvert Concrete Drop Inlet Concrete Junction Box 2 Mountain Air County Club Construction Standards Mountain Air will follow the attached details, which specify the construction and manufacturing standards that will be used in order to limit the risk of pollution by sediment. SELECTED CONSTRUCTION STANDARDS • All fill supporting stormwater infrastructure will be compacted to 95% • All bedding will meet the manufacturer's standards • Junction boxes will have 8 inch thick concrete bases • 0-ring gaskets meeting the requirements of ASTM C 443 will be used • All construction will meet or exceed DOT standards RISK ASSESSMENT Mountain Air will reduce the already minimal risk of sedimentation due to a significant rain event by monitoring the 10-day weather forecast. The Sediment Control Team will be charged with monitoring the weather and stopping the installation in the event a forecasted significant rain event. The risk of a 5-year event during afive-day period is 0.27% and the risk of a 100-year event in a seven-day period is 0.02%. Storm Event Yearly Risk of Storm Daily Risk of Storm 5 Day Risk 7 Day Risk 5 ear 20% .054% 0.27% 0.37% 10 ear 10% .027% 0.13% 0.18% 25 ear 4% .011% 0.05% 0.077% 50 ear 2% .0054% 0.027% 0.037% 100 year 1% .0027% 0.013% 0.018% 3 Mountain Air County Club Hole 1 Structures Installation of the pipe for Hole 1 is anticipated to take five days with many of the tasks occurring concurrently. The teams will undertake six major tasks in accordance with the specified details and plans to install pipes #1, #2, and #3 and their associated headwalls, drop inlets and junction box. MAJOR TASKS Task l: Stream Diversion Task 2: Plunge Pool Construction Task 3: Installation of Pipe #3, Junction Box #3 and Lower Pipe #2 Task 4: Installation of Upper Pipe #2, Drop Inlet #2, Pipe #1 and Headwall #1 Task 5: Removal of Stream Diversion PIPES Pi e # Len th Size T e Inv. In Inv. Out % Slo e 1 37' 24" RCP Class 3893.20 3875.40 48.11 III 2 200' 30" RCP Class 367490 3614.40 30.25 V 3 26' 48" RCP Class 3613.90 3613.64 1.00 III 4 Mountain Air County Club Hole 1 Tasks Task 1: Stream Diversion • Sediment Control Team to divert stream into the flume system in accordance with the culvert installation sequence and details submitted with the approved Erosion Control Plan. Task 2: Plume Pool Construction • Sediment Control Team to construct and stabilize Plunge Pool in accordance with details provided by Buck Engineering. • Sediment Control Team to divert stream into the completed plunge pool. Task 3: Installation of Pipe #3, Junction Box #3 and Lower Pipe #2 • Installation Team to install pipe #3 beginning at the lower invert and working uphill toward the location of junction box # 3. • Installation Team to install junction box # 3 and tie pipes #2 and # 3 into junction box # 3 • Installation Team will continue working on the remaining lower section of pipe # 2. Sediment Control Team to establish temporary groundcover within 7 days of completion of this installation Task 4: Upper Pipe #2, Drop Inlet #2, Pipe #1 and Headwall #1 • Installation Team to install remainder of pipe # 2 beginning at the upper end of the previously installed pipe and working uphill toward the location of drop inlet # 2. • Installation Team to install drop inlet # 2 and tie pipes # 2 and pipe #1 into drop inlet #2. • Installation Team to install pipe # 1. • Installation Team to install headwall # 1 at the head of pipe #1. • Sediment Control Team to establish temporary groundcover within 7 days of completion of this installation. Task 5: Removal of Stream Diversion • Sediment Control Team to divert stream into the permanent storm drainage system. 5 Mountain Air County Club Hole 2 Structures Installation of pipe for Hole 2 is anticipated to take five days with the tasks occurring concurrently. The teams will undertake five major tasks in accordance with the specified details and plans to install pipe #4 and its associated headwalls and junction boxes. MAJOR TASKS Task 1: Stream Diversion Task 2: Plunge Pool Construction Task 3: Installation of Pipe #4 Task 4: Installation of Headwall #5 Task 5: Removal of Stream Diversion PIPES Pi e # Len th Size T e Inv. In Inv. Out % Slo e 4 350' 30" RCP Class V 3398.40 3317.00 23.26 6 Mountain Air County Club Hole 2 Tasks Task 1: Stream Diversion • Sediment Control Crew to divert stream into the flume system in accordance with the culvert installation sequence and details submitted with the approved Erosion Control Plan. Task 2: Plunge Pool Construction • Sediment Control Team to construct and stabilize Plunge Pool in accordance with details. • Sediment Control Team to divert stream into the completed plunge pool. Task 3: Installation of Pipe #4 • Installation Team to install pipe # 4 from the plunge pool upslope toward headwall #5 in a manner to minimize disturbance to the existing stream channel. • Sediment Control Team to establish temporary groundcover within 7 days of completion of this installation 4: Installation of Headwall #5 Installation Team to install headwall # 5 and tie in pipe #4. Sediment Control Team to establish temporary groundcover within 7 days of completion of this installation Task 5: Removal of Stream Diversion • Sediment Control Team to divert stream into the permanent storm drainage system. 7 Mountain Air County Club Holes 6 and 7 Structures Installation of pipe for Holes 6 and 7 is anticipated to take seven days with the tasks occurring concurrently. The teams will undertake five major tasks in accordance with the specified details and plans to install pipes #12 & 14 and its associated headwalls and junction boxes. MAJOR TASKS Task 1: Stream Diversion Task 2: Plunge Pool Construction Task 3: Installation of Pipe #14, and Drop Inlet #17 Task 4: Installation of Pipe #12, and Junction Box # 16 Task 5: Removal of Stream Diversion PIPES Pi e # Len th Size T e Inv. In Inv. Out % Slo e 12 436' 24" RCP Class 3383.75 3299.80 19.25 V 14 86' 24" RCP Class 3299.30 3279.75 22.73% III 8 Mountain Air County Club Holes 6 and 7 Tasks Task 1: Stream Diversion • Sediment Control Crew to divert stream into the flume system in accordance with the culvert installation sequence and details submitted with the approved Erosion Control Plan from above proposed location of junction box #16 to below plunge pool location at outlet of pipe #14 Task 2: Plunge Pool Construction • Sediment Control Team to construct and stabilize Plunge Pool in accordance with details. • Sediment Control Team to divert stream into the completed plunge pool. Task 3: Installation of Pipe # 14, and Drop Inlet # 17 • Installation Team to install pipe #14 beginning at the lower invert and working uphill toward the location of drop inlet #17. • Installation Team to install drop inlet # 17 and tie pipes #14 into drop inlet #17 • Sediment Control Team to establish temporary groundcover within 7 days of completion of this installation Task 4: Installation of Pipe #12, and Junction Box # 16 • Installation Team to install pipe # 12 beginning at the lower invert and working uphill toward the location of junction box #16. • Installation Team to install junction box # 16 and tie pipe #12 into junction box #16 • Installation Team to install temporary collars to junction box #16 in order to bring the top of the junction box up to existing ground level. • Sediment Control Team to establish temporary groundcover within 7 days of completion of this installation Task 5: Removal of Stream Diversion • Sediment Control Team to divert stream into the permanent storm drainage system via the top of junction box # 16. 9 Mountain Air County Club Hole 8 Structures Installation of pipe for Hole 8 is anticipated to take five days with the tasks occurring concurrently. The teams will undertake five major tasks in accordance with the specified details and plans to install pipes #5, 6 and 11 and its associated headwalls and junction boxes. MAJOR TASKS Task 1: Stream Diversion Task 2: Plunge Pool Construction Task 3: Installation of Pipe #11, and Headwall #15 Task 4: Installation of Pipe #6, and Drop Inlet # 8 Task 5: Installation of pipe #5 and Drop Inlet #7 Task 6: Removal of Stream Diversion PIPES Pi e # Len th Size T e Inv. In Inv. Out % Slo e 5 44 18" RCP Class 3468.58 3453.50 34.27 III 6 235 24" RCP Class 3453.00 3407.82 19.23 IV 11 53' 24" RCP Class 3406.47 3384.75 40.98 III 10 Mountain Air County Club Hole 8 Tasks Task 1: Stream Diversion • Sediment Control Crew to divert stream into the flume system in accordance with the culvert installation sequence and details submitted with the approved Erosion Control Plan • Sediment Control Team to divert stream into the top on junction box # 16 and Stream Diversion pipe will be outleted directly into pipe #12. Task 2: Plunge Pool Construction • Sediment Control Team to construct and stabilize Plunge Pool in accordance with details provided by Buck Engineering. Task 3: Installation of Pipe #11, Headwall #15 • Installation Team to install pipe #11 beginning at the lower invert and working uphill toward the location of headwall #15. • Installation Team to install headwall # 15 and tie pipe #11 into headwall #15. • Sediment Control Team to establish temporary groundcover within 7 days of completion of this installation. • Sediment Control Team to divert stream into completed plunge pool and remove lift collars from junction box 16. Task 4: Installation of Pipe #6 and Drop Inlet #8 • Installation Team to install pipe #6 beginning at the lower invert and working uphill toward the location of drop inlet #8. • Installation Team to construct drop inlet #8 and tie pipe #6 into drop inlet #8. Sediment Control Team to establish temporary groundcover within 7 days of completion of this installation. Task 5: Installation of Pipe #5 and Drop Inlet #7 • Installation Team to install pipe #5 beginning at drop inlet #8 and working uphill toward the location of drop inlet #7. • Installation Team to construct drop inlet #7 and the pipe #5 into drop inlet #7. Task 6: Removal of Stream Diversion • Sediment control team to direct stream into drop inlet #7. 11 Pipes not affecting stream channel: Pi e # Len th Size T e Inv. In Inv. Out % Slo e 7 74' 18" RCP Class 3475.41 3450.40 33.80 III 8 132' 18" RCP Class 3449.90 3445.50 3.33 III 9 67' 18" RCP Class 3445.00 3431.1 S 20.67 III 10 112' 18" RCP Class 3430.65 3414.80 14.15 III 13 285' 18" RCP Class 3374.75 3299.80 26.30 V 15 39 18" RCP Class 3895.50 3886.15 23.97% III 16 244 18" RCP Class 3885.65 3834.72 20.87% V 12