HomeMy WebLinkAbout20240628 Ver 1_Pictures_20240501CAiAWRA RIPAMAvu DUFFER NOTIFICATION FORM
Project Name/address: Edwardson- Cot 6 PaCifie Mills
Co
Owner
Print Signature
Contractol/Ogent:Charlie_%Alashburn--MarineConstr ctinn
Print Signature —_
The approval is for the purpose and design described in your application, Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the app#ication. [15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)j
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees t?lat am severely undermined aiongthe immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B M43(5)1
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover_ 11 SA NCAC 02B .0243
(6))
E3eaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. (15A NCAC 02B .0243(4) and nl
Work to be conducted from land must indicate arF access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
Material must be, outside the buffer. [15A NCAC 02H .0502 and 1SA NCAC 028.0243 (4), (6), (8))
5tOrmwater cannot be pined or channeled for direct discharge to the lake. All constructed stormwatel.
discharges must be at the natural elevation and discharged prior to entering the buffer directeci as .sheet flow at non -erosive velocities to the lake, j15A NCAC 0213-0243(5), (6)j diffuse or
AeknawJedgement rs Ncati ctri"tort
-°?� hereby state that # have been informed of the Catawba Riparian Buffer Rule.
Any work conducted in the buffer, nest sper..ifically stated in the application and approved by the Division of
Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the
construction will be built within substantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules, the approved plans) and specification(s), and other supporti rig rnaterials.
f
Signature (owner): f Cl) hate: I
RRRRRRR R
a.. a
ZLLLggqLZLZtLL;
R
�R}R RRR RRRR!}
1L1 : 111HURI1 L�L
� �L M \►�6�saRC
yZLZxLLZgZZLLLZt
}
■r
al
i`
Jill
g ilk
w
ab
-3a
t 1 ..T• f' Y /i ^r. .rwy,� a^ r r s6r iI r
•�f 1 � i i •, i r� � � tE � r lt�i'k rLdti ��r .�� G«b�, ��
� �� ' L I:r � ♦� .. _ .�•��'fi �r� .rla"11 6/�1v1.s�8��.r'.� ir.:y _ L'rL,.._�.,....,� _ � �! ��. `�;t' . '
�'—