HomeMy WebLinkAboutNC0026441_Quarterly SOC Progress Report (Q1 2024)_20240430 u� srZg �{ A Al CA��~ Tobitt of *ffler (fftp Public Works and Utilities EMC SOC WQ S22-033 Quarterly SOC Progress Report 1st Quarter 2024 Please accept this submittal as a quarterly progress report for the work and activities for the Town of Siler City under the Special Order by Consent. Scheduled Activities paragraph 2(a) Quarterly Reports Quarterly Nutrient Optimization Report and Quarterly SOC Report were submitted on January 30, 2024 Collection System Permit WQCS00056 Permit for Main Interceptor Replacement Project was Submitted on February 28, 2023,Sewer Extension Permit was issued on April 19, 2023. ARPA Sewer Rehabilitation Project Engineering Report was submitted on May 1, 2023, and was approved on April 23, 2024. We are currently awaiting approval of encroachment agreements from NCDOT and Norfolk Southern Railroad. The Main Interceptor Project is included with scope for WWTP expansion and has been delayed based on delays in acquiring funding. Bids were received for this project on April 4, 2024, and are planned to be presented to the Sanford Board for Tentative Notice of Award on May 6, 2024. All other Activities are scheduled for future quarters and are currently expected to be on schedule. NPDES Permit NCO026441 IUP Permits were issued to Mountaire Farms, Brookwood Farms, and the Siler City Water Treatment Plant on May 19, 2023. Mountaire Farms requested an adjudicatory hearing for their permit which was held on July 21. Mountaire is currently appealing the results of the hearing.Appeal is scheduled to be heard on June 17, 2024. An Authorization to Construct has been issued to Mountaire Farms for the improvements. Supplemental Aeration Equipment has been installed in the oxidation ditch basins.The installation was complete on May 26, 2023,with initial email notification on May 30 and a formal letter on June 29, 2023, notifying NCDEQ of completion. Sludge equipment was acquired for winter 2023-2024 season by December 1, 2023 6.0 MGD WWTP Expansion funding has been secured with issuance of the Letter of Intent to fund from NCDEQ DWI.The Town received bids on this project on April 25, 2024, and this expected to be presented to the Sanford Board for Tentative Notice of Award on May 6, 2024. Significant concerns about the schedule were raised by several contractors during the bid and the schedule was extended to allow 30 months due to the current market and material issues.This work will not be complete by December 31, 2024, and further discussion regarding this activity is needed. Chris McCorquodale Director of Public Utilities cmccorquodale@silercity.org PO Box 769.311 N.Second Avenue Phone:919-742-4732•Fax:919-663-3874 Siler City,NC 27344-0769 www.silercity.org To advance atramework for our success tbrougb balanced,governance,dyrucrnic partnerships,and an engaged corrrnrurrity. Water Treatment Plant IUP Permit was issued to the Siler City Water Treatment Plant on May 19, 2023. Construction of the WTP Pretreatment Improvements was completed on November 215t, 2023, and confirmation submitted to NCDEQ notifying of the completion. The WTP Solids Handling Improvements is currently in design.Town is working with McGill to revise the design for final submission and is expected to submit for permits within 2 weeks.This activity will be behind the scheduled begin construction date of February 1, 2024, and schedule extension request was declined. Sludge equipment was acquired for winter 2023-2024 season by December 1, 2023 Action Items under Paragraph 4(a) Phase 1 All Action Items associated with Phase 1 have been completed. Phase 2 The Town has submitted plans and specifications to DWI for review and approval.As noted above,The Town received bids on this project on April 25, 2024, and this expected to be presented to the Sanford Board for Tentative Notice of Award on May 6, 2024. As noted above, supplemental aeration equipment installation was completed on May 26, 2023. As noted above, the Town is issued updated IUPs on May 19, 2023.Authorization to Construction was issued to Mountaire Farms on March 15, 2024 Phase 3 No overflows from the Town's WTP have occurred from date of execution of the SOC. As noted above, Construction of the WTP Pretreatment Improvements was completed on November 215Y, 2023. During startup an issue with the existing influent pipe was determined which caused a hydraulic constraint on operation. Replacement of this pipe has been completed and startup of the facility is scheduled for May 1, 2024. Summary of Expenditures was submitted in February 2024. Phase 4 Sludge equipment was acquired for winter 2023-2024 season by December 1, 2023 Other activities are scheduled for future quarters. Additional Wastewater Flow Pursuant to Paragraph 4 No additional flows have been released since the last report. Thank you, Town of Siler City Chris McCorq 2ale Chris McCorquodale Director of Public Utilities cmccorquodale@silercity.org PO Box 769.311 N.Second Avenue Phone:919-742-4732•Fax:919-663-3874 Siler City,NC 27344-0769 www.silercity.org