Loading...
HomeMy WebLinkAboutNCC222629_MODIFICATION Supporting Documents_20240430 CERTIFICATE OF PLAN APPROVAL tE.,..4))&,_W ` dh �.; '.„,4..t��' ''i;3\ ph i 1`:. " IPRU.I].1T �4i ��N 5:QUAM The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). Project Blue/VinFast US EV Manufacturing Facility: CHATH-2022-010 Project Name and Location April 19, 2024 /t/AN % Oeirtow, /(/ Date of Plan Approval Regional Engineer £ D_E Q ?) Certificate of Coverage Number \..r/