HomeMy WebLinkAboutNCC222629_MODIFICATION Supporting Documents_20240430 CERTIFICATE OF PLAN APPROVAL
tE.,..4))&,_W ` dh �.;
'.„,4..t��' ''i;3\ ph i
1`:. " IPRU.I].1T �4i
��N 5:QUAM
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b).
Project Blue/VinFast US EV Manufacturing Facility: CHATH-2022-010
Project Name and Location
April 19, 2024 /t/AN % Oeirtow, /(/
Date of Plan Approval Regional Engineer
£ D_E Q ?)
Certificate of Coverage Number \..r/