Loading...
HomeMy WebLinkAboutSAW-2022-01734_NWP.pdf DEPARTMENT OF THE ARMY '1 U.S.ARMY CORPS OF ENGINEERS,WILMINGTON DISTRICT - WILMINGTON REGULATORY OFFICE 69 DARLINGTON AVENUE WILMINGTON NORTH CAROLINA 28403 April 29, 2024 Regulatory Division SAW-2022-01734 Sent Via email: rrojas@drbgroup.com Ric Rojas DRB Group North Carolina, LLC 3000 RDU Center Dr Suite 202 Morrisville, North Carolina 27560 Dear Mr. Rojas: This letter is in response to the Pre-Construction Notification (PCN) you submitted to the Wilmington District, Raleigh Field Office on February 13, 2024, for a Department of the Army Nationwide permit (NWP) verification. This project has been assigned the file number SAW-2022-01734 and is known as Weldon Subdivision. This file number should be referenced in all correspondence concerning this project. A review of the information provided indicates that the proposed work would include the activities in waters of the United States include the permanent discharge of fill material into 0.044 acre of wetland waters, the permanent discharge of fill material into 170 linear feet of stream waters (0.019 ac) considered a loss and permanent discharge of fill material into 91 linear feet (0.009 ac) of stream waters not considered a loss. Additionally, the project involves the temporary discharge of fill material into 74 linear feet (0.012 ac) of stream waters. The project area for this determination includes a —44 acre(s) area which is illustrated on the enclosed site plans/maps. The project area is located 0.10 mile directly northwest of the intersection of Lucus Road and Horton Road in Knightdale Wake County, North Carolina. The project is at Wake County Parcel number 1755757607, at Latitude 35.825520 and Longitude -78.466990-1 in Knightdale, Wake County, North Carolina. We have determined that the proposed work is authorized by Nationwide Permit 29 and Nationwide Permit 18 pursuant to authorities under Section 404 of the Clean Water Act (33 U.S.0 § 1344). The proposed work must be accomplished in strict accordance with the general permit conditions, any regional conditions, the special conditions listed in this letter, the application materials, and the enclosed plans. If the extent of the project area and/or nature of the authorized impacts to waters are modified, a revised PCN must be submitted to this office for written approval before SAW-2022-01734 work is initiated. Any violation of permit conditions or deviation from your submitted plans may subject the permittee to enforcement action. This verification is valid until March 15, 2026, unless prior to this date the subject NWP(s) is suspended, revoked, or is modified such that the activity no longer complies with the terms and conditions of this NWP. If you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP. Project Specific Special Conditions: Special Condition 1: Suitable habitat for tricolored bat (Perimyotis subflavus) may be present at the site. On September 14, 2022, the USFWS published a proposal in the Federal Register to list the tricolored bat as endangered under the Endangered Species Act (ESA). The permittee understands and agrees that all work associated with the clearing and removal of trees and removal or modification of culverts must be completed prior to the effective date of the final listing of this species in the Federal Register. Work associated with the aforementioned activities not completed by that time must cease and the permittee must contact Matthew Martin of the Corps at (984) 800-3741 or matthew.k.martin@usace.army.mil to determine if additional coordination with the United States Fish and Wildlife Service is required under Section 7 of the Endangered Species Act prior to continuing work. This NWP verification does not preclude the necessity to obtain any other Federal, State, or local permits, licenses, and/or certifications, which may be required. If you have any questions related to this verification or have issues accessing documents referenced in this letter, please contact Matthew Martin, Regulatory Specialist of the Raleigh Field Office at (984) 800-3741, by mail at the above address, or by email at matthew.k.martin@usace.army.mil. Please take a moment to complete our customer satisfaction survey located at https://regulatory.ops.usace.army.miI/customer-service-survey/. Sincerely, Matthew K. Martin Regulatory Specialist Enclosures Cc (w/enclosures) Deborah Shirley, Soil and environmental Consultants, Inc. (via dshirley@sandec.com) i I , N/F N/F ANNIE M.&ERNEST LOGAN JR. 12609 RICHMOND LLC. 5 76 0571 / PIN:1755-78-7080 N/F PIN:1755-76-0 REID:0459063 JAMES E.ALLEN LLC. REID: 2 / DB.17274/2274 PI REID:03580 277 DB.1985/1 5 BM.2018/1383 \ BM.1985/1452 DB.16078/694 ZONING:GR3 ZONING:RT / BM.2018/1383 / ZONING:RT / 145.27' IMPACT 4-SEE E-5 � � � � � 1,339.91' S 89°10'15"E 1,485.18'(TOTAL) -F - - _ _ l ' ; ; 0 0 I I N/F Z 109 I 108 07 I 106 105 104 II O110 O O IMPACT 2-S E-2 / OIOI IO IO I O I O I O99 I 1 WAZYM WILLIAMS 20 gOg O O O PIN:17:55-86-7038 REID0342088 w I I DB,16040/2783 BM.2005/2476(LOT 13) _ 1 ZONING:RR1 _ 7Z L _ /'• — — — ROAD D rF1 N/F WETLAND 4 PATRICIA A.JOHNSONPIN:1755-66-7286 WETLAND 3 1 I a I 120 I 121 I 122 I 123 I 124 I 125 a a a 129 130 131 132 133 1 92 m DBID:0305803 9 49/1034 ' 1 ' 91 BM.2002/1389 , I v I 111 112 I WETLAND 5 I I I I I I I I O ZONING:RT I I � J � � I NI II 1 90 N I 114 - Q1 / , O ' - - - ALLEY F I Ji / / O IMPACT 1 SEE E-1 N/F o ACTIVE OPEN / _ = JERRY GO COR INCSTRUCTION STREAM B I ( 115 SPACE#3 PIN:1755 85 7963 II1 143 I 144 1 145 146 / 0342087 DB.17431%833 - - I 134 1 135 O I 2005/2476(LOT 12) o a ' a ' (910 ZONING:RR1 z CAR O �'.. / �� — — \ / O �,, QQ��FE55•%pNt/jlj ,'i ACTIVE OPEN // I ' \♦ '� IA - - I SPACE#1 117 \ - ROAD E �/ Q RE L I N R'=_Y 03 865 IjiIMPACT 3-SEE E-4 \� \ REAM A I�T 5-.tsEEf� - 9 F ./ ST / 30'NEUSE RIVER _ -- STREAM BUFFER / � � ' � � � / � � / i�,S OAVID ZONE 1 / \ _ / i - / / �— ,, 0 i WETLAND 1 / 20'NEUSE RIVER STORMWNORTHOND#1 / 1 ✓^/` 3 N/F ?r ) \ / JUSTIN 0.&PAULA W.UNDERWOOD STREAM BUFFER 20 ZONE 2 - PIN:1755-85-4784 30'NEUSE RIVER 19 1 1 �I REID:0342083 / r STREAM BUFFER 1 o DB.14023/1922 C. /� / OZONE 1 18 n BM.2005/2476(LOT 8) ZONING:RR1 - - \ 17 1 z Lu N/F w I TOP OF i \�\ �� — `�_ _ , - -'— i �� / � / \ a 16 1 A ' A. 20'NEUSE RIVER ROBERT O.LARYEA II I BANK/ORIDINARY �j� /// / STREAM BUFFER 15 I I Ln o PIN:1755-65-7684 0 HIGH WATER MARK I I /� -�— _ // / ZONE 2 w � ,ter, _( / 23 REID:0473751 00uj (TYP.) — 7 \ / / —-— ———— — 1 j 1 N DB.13-E/1848 - 1 / / i — 24 �— N BM.2020/235 I / —>/ / / _ — — _ / — — UzLn �� W N fill I ZONING:RT u Q om IMPACTS-SE_EE-9 z � � L�j �� /i i%i / / / / / ( \ \ 26 \ \]�'•/ • p - N - CONWAY RIDGE CROSSING J Ln o a Ln } tn IMPACT 7-S -7� �� // TOP OF 27 \� \ / i /• / / -- 111111111 / r o J -1 BANK/ RIDINARY HIGH WAOTERMARK \ \/�• / / 14 I 1 J _ °°° °oo°° (TYP.) 28 \ /� / 13 1 o°°°o°o 006000°0°° o00000000 \ O • / 1 I ILS Q oo°off° 000000000 °0000°0000000°o _ WETLAND 6 \ \ 29 i / 12 1 SANDRA WILSON WRIGHT o°"s°"o°°o°°o°°° °o'°o'°o'°o'°o'°o IMPACT 8 SEE E 8 / 1 PIN:1755-85-4477 / °�°.9°1.10 °°°°.9°.9°�°0°° /� STORMWATER POND#2- 11 REID:0342082 r o00000 S-0.9-0.9-0.900;0 vP" SOUTH / °°o°o°o°o°o° °°o°°o°°ooO / I 68 I 10 ° I BM.005/2476(LOT 7) ———— �o o0000000000000000000° �,1• / ———�— o 0 0 0°0 0°0°0°0°0°0°0°0°0°0°�y°o° °og'o � / �/ • / I I I 67 I 1 Z 1 I ZONING:RR1 0 00 00 ° o ° 0000 ° ° 00000 .f 66 �u ° o 0 0 ° ° o 0 0 0 0 ° ° o 0 0 6 0 ° c • 6S / °o°o 00°020°000 °00000000000O0000000 00000 0 00 00 /'• • 64 F p o o ° o o ° o 0 0 0 0 0 0 0 0 0 0 o o °o o° °o°o0 0 0 0 0 0 0 0° °0 0 0 o o°oo I \ / • / I 63 I --' ° o ° °° ° _ _ �_ •/ I 62 I g o I PUMP STATION / —— — o o°oo�°000�00000�,go°; o�c °'o°`00000� D C • 61 I Q �Q 0000 0000000000000000000�°°0° 0o°o�°O°000000000000000° ROA I 60 I O I I O8 1 �. �:N::,,;:;o;,:.s„ > :t, n..,..�, •�:a :... .;,,..,i -�/ o°o° °o°o°o°o°o°o°o°o°o °moo o°o°o°o°o°o°o° .L i o 0 0 o°o°0000000000000°0°� - o 00000 000° 0000000oo0000° — . '� m m °°°°°°°°° / / I 59 _ �- 7 1 / 0000 0000000°o°° o I O Z / Z z Q 57 �y o 0 WETLAND 7 54 I 55 I I w / 5 1 N/F �%, // // • I 49 50 51 52 53 w NICHOLAS J.COTA /n17F ```` 48 Q PIN:1755-85-4382 N/F o / ZELL KAALANEY LUCAS �� I 4 1 1 REID:0342081 DEMENT FARMS LLC. m 6 i o Lim, o DB.18195/1848 PIN:1755-94-0339 u' J 00 / P 1755 65 8249 47 I I I I I 1 BM.2005/2476(LOT 6) I REID:0185216 Q N v REID:0473752 •• Q ALLEY B — I 87 3 °p ZONING:RR1 N/F A DB.17010/2347 DB.17876/2454 / 1 46 > I I I I O I JULIUS S.&ANN M.CARROLL I LL BM.2020/235 •/ �` 1 ACTIVE PEN J I I 83 I 84 O 86 2 1 ' ZONING:RR1 / w' I 85 O 2 PIN:1755 84-1892 / ZONING.RT i� SPACE#2 45 Q I 81 82 O O 1 - _ REID:0011922 I / 30 1 I 79 I 80 1 1 DB.1944/639 I PARCEL 2 77 I 78 ZONING:RR1 IMPACT 6-SEE E-6 �\ _ / 43 I 69 70 71 72 73 74 75 76 O O O 1 � O 11 \♦ \ � I � - - � - -- � - � Ian�''� 1 - - — V MATCHLINE(SEE THIS SHEET) ROAD B Q 1 � o \\ \ / �♦ —— —� I m N/F w3 N ISIDOROGONZALEZVELAZQUEZ i � — Q Q _ d PIN: ID:0205089 I ,� �+ I Z Q z N REID:0205089 / \1 \\ I 1 3 DB.14464/1479 I 13 W N I BM.1994/1073 I I O W FUTURE I ZONING:RR1 I z Q O / 34 35 36 O O O I O I O I O COMMERCIAL to I i I D o < c/) w H J U z Q •,4:Jry N N M1}y�v r.v Lu N 89°58'29"W ;• .�.•. ... ► 1 1 ♦ 184.14(TIE) 850.20' •• 0 �y z � KEVIN S.&EDITH C.OVERTON /••/ $01°42'52"E PIN:1755-74-9860 ` ♦ REID:0081586 PP • 22.76(TIE) N/F r , ♦ DB.8801/1184 / • S 01°42'52"E DEMENT FARMS LLC. U N/F ZONING:RR1 �I • 64.86(TIE) PIN:1755-94-0339 ♦ ` TARA S.JOHNSON&DURWOOD KAY / / N/F REID:0185216 ♦ MEDLIN 0� A DB.17010/2347 ♦ PIN:1755-74-0862 I JULIUS S.&ANN M.CARROLL 1 ♦ REID:0141510 /� / I PIN: 0014-1892 ' ZONING:RR1 1922 DB.17362/439 � ' I REID:B.14 /639 I PARCEL 2 DB.ZONING: R39 BM.1985/453 � � N/F ZONING:RR1 I� ZONING:RR1 '/ I KEVIN S.&EDITH C.OVERTON ' ♦ ♦ \ I PIN:1755-74-9860 ' I REID:0081586 ♦ ` �00000, �/ DB.8801/1184 � SHEET NO: ♦ ZONING:RR1 ♦ � — — — _ 80 0 40 80 160 ♦ ��/ MATCHLINE(SEE THIS SHEET) C2.� ♦, ` ' / I I I � w SCALE: 1"=80' PRELIMINARY DRAWING-NOT RELEASED FOR CONSTRUCTION STREAM "A" IMPACTS TYPE OF AREA SQ. FT. AC. LENGTH STREAM BUFFER 363 .0083 88 LF ZONE 2 I M PACT �'..•' (2,653 SF/0.061 AC) STREAM "A"-TEMPORARY 1105 .0024 18 LF / STREAM "A"-PERMANENT/NO PERMANENT LOSS 1187 .0043 52 LF / STREAM "A" BUFFER IMPACTS TYPE OF AREA SQ. FT. AC. ` I — / / 7,503 0.172LLJ I"''•�'' � STREAM "A"-ZONE 2 BUFFER IMPACTS 15,067 10.116 / 0 r, � N ^i Z Ln w N �— 20'NEUSE RIVER I / / 0 > `^ rn STREAM BUFFER �/ // J _q ZONE 2 �/ / Q _ 30'NEUSE RIVER �� LIMITS OF STREAM BUFFER / STREAM BUFFER DISTURBANCE _ ZONE 1 ZONE 1 IMPACT (TYP.)_ (4,050 SF/0.093 AC) / 00 TEMPORARY RIP RAP PAD UNTIL -- -- - -- _ �i I / / / / m m FINAL IS INSTALLED �_� ► z z (SIX 5', 12" MIN DIA.) I STREAM"A"CHANNEL IMPACT / N o Q o ±363 SF (88 LF) w c TEMPORARY STREAM CHANNEL IMPACT 84" H X 60"W I ±21 SF(5 LF) RCP BOX CULVERT 1 I \ SANDBAG COFFER DAM SANDBAG TEMPORARY STREAM ro 1 i o � COFFER DAM �i CHANNEL IMPACT J `" CHANNEL —!- 1I ► �� ►liuos� r ±84 SF(13 LF) o o U ORDINARY HIGH � / � , N / WAT�l01ARK/ w� �� � I ! P OF BANK � u,�i u T '� �•• jl �-Mp STREAM BUFER�3 ZONE 1 IMPACTRIP RAP �) (3,453 SF/0.079 AC)KEY IN RIP RAP ALONG STREAM BANKS \/ i , , AND STREAM BOTTOM.TOP OF RIP _ PER ANENT-NO PERMANENT LOSS 'I STREAM BUFFER RAP TO BE AT BOTTOM OF STREAM ✓ ST EAM CHANNEL IMPACT ZONE 2 IMPACT U BOTTOM: RIP RAP SHALL HAVE A \ ±1 7 SF(52 LF) Ip' 1' �/ (2,414 SF/0.055 AC) MINIMUM DIAMETER OF 24"AND z Z OUTLET 50'FROM ENDWALL. Q w J NOTE: W / TEMPORARY COFFER DAMS ARE TO BE INSTALLED ON THE UPSTREAM AND DOWNSTREAM PORTIONS OF THE STREAM CHANNEL TO ALLOW Y U 320 FOR ROAD CROSSING AND CULVERT CONSTRUCTION TO BE a _ COMPLETED IN DRY CONDITIONS.EXISTING STREAM CHANNEL SHALL 325 ',l. 1 BE PUMPED AROUND PROPOSED ROAD CROSSING DURING CONSTRUCTION. UPON COMPLETION OF THE ROAD CROSSING,THE COFFER DAMS AND RIP RAP WILL BE REMOVED AND THE STREAM WILL BE RESTORED TO ITS ORIGINAL DIMENSIONS. 20 0 10 20 40 — SHEET NO: STREAM "A" IMPACT SCALE:1"=20' E-1 ISTREAM BUFFER f ZONE 1 IMPACT 3,975 SF 0.091 AC / � I I I ( ' / ) I CHANNEL ORDINARY GH I // 1 \ WATIR MAR TOP BANK / � I z / I STREAM BUFFER I LIMP J — ZONE 2 IMPACT I I I (2,159 SF/0.050 AC) 315 W -^ Q 0 u Lf) , Uz I / _ Lf) r W N J 1 ILI NOTE: ztz z rn TEMPORARY COFFER DAMS ARE TO BE INSTALLED ON THE UPSTREAM Q AND DOWNSTREAM PORTIONS OF THE STREAM CHANNEL TO ALLOW 0 0 Ln 1 20'NEUSE RIVER �' ® 320 FOR ROAD CROSSING AND CULVERT CONSTRUCTION TO BE J > J " STREAM BUFFER �� �� COMPLETED IN DRY CONDITIONS.EXISTING STREAM CHANNEL SHALL O � 0 r ZONE 2 TEMPORARY STREAM BE PUMPED AROUND PROPOSED ROAD CROSSING DURING z = CHANNEL IMPACT CONSTRUCTION. UPON COMPLETION OF THE ROAD CROSSING,THE (21 LF) COFFER DAMS AND RIP RAP WILL BE REMOVED AND THE STREAM Q 30'NEUSE RIVER 54" RCP CULVERT , ' ` ' WILL BE RESTORED TO ITS ORIGINAL DIMENSIONS. STREAM BUFFERi ZONE 1 S 32J; /SS �2 ROAD D \� SS T WETLAND 4 IMPACT(ROADWAY FILL) STREAM BUFFERZONE 1 IMPACT z(67 SF/0.002 AC.) (4,244 SF/0.097 AC) 0 WETLAND 3/4/5 I M PACTS TYPE OF AREA SQ. FT. AC. PURPOSE WETLAND 3 IMPACT O O O O O O O 74 0.002 ROADWAY FILL WETLAND 4 IMPACT O O O O O O O 67 0.002 ROADWAY FILL _ I WLu 323 ETLAND 5 IMPACTS O O O O O O 41 0.002 ROADWAY FILL � J ���� • ' _ TEMPORARY o N U FLEXIBLE HOSE o n N STREAM BUFFER STREAM "B" CHANNEL IMPACTS -- .•,. ZONE 2 IMPACT _ TYPE OF AREA SQ. FT. I AC. LENGTH WETLAND 3 IMPACT(ROADWAY FILL) �•• ` STREAM"B"CHANNEL IMPACT (2,294 SF/0.053 AC) - 468 10.0107 1 82 LF •• ±468 SF (82 LF) (74 SF/0.002 AC.) )� I STREAM "B"-TEMPORARY 1 165 10.0038 1 26 LF WETLAND 5 IMPACT(ROADWAY FILL) STREAM "B"-PERMANENT/NO PERMANENT LOSS 1 242 10.0056 1 39 LF / \ 315— ` (41 SF/0.001 AC.) I I/ N / I , STREAM "B" BUFFER IMPACTS Q LIMIT OF I TYPE OF AREA SQ. FT. AC. z u z D TUR NCE �/ 8,219 0.189 O LLI //► J (TYP.)� I STREAM "B"-ZONE 2 BUFFER IMPACTS 4,453 0.102 / ' I TEMPORARY RIP RAP PAD UNTIL I J o Q / SANDBAG J FINAL IS INSTALLED W COFFER DAM (5'X 5',12"MIN DIA.) "*_ `PERMANENT `PERMANENT-NO PERMANENT LOSS \I I RIP RAP I STREAM CHANNEL IMPACT `1 1 \KEY IN RIP RAP ALONG STREAM BANKS ±242 SF(39 LF)/ AND STREAM BOTTOM.TOP OF RIP I RABOTO BE AT BOTTOM OF STREAM TOM RIP RAP HALL HAVE A \TEMPORARY STREAM MINIMUM DIAMETER OF 13"AND I CHANNEL IMPACT — I' I OUTLET 36'FROM ENDWALL. / I� ±25 SF(5 LF) \ — r 20 0 10 20 40 SHEET NO: STREAM "B" IMPACT SCALE:1"=20' E-2 340 340 z Ln 0 W sLn n 335 335 330 330 Q O z Ln N ~ U 0 LU Z ko J Ln w F a PRO OSED GRA E J O r1 C) 325 325 = 330 330 z PROPOSED RADE 325 325 320 320 RETAINI 4G WALL RETNINING WALL r R TAINING W LL RETAINING WALL m m Z Z n Q w � 0 320 320 315 315 STREAM ELEV:311.4 N N STRE Drp ULVE w N rn STREAM ELEV:314.2 --- N U Z 0 V) 315 Wx 4'14B0XC LVER --- N 315 310 310 RT STREAM El EV:311.5 _ _/ ELEV:310.4 / CULV RT ULVERT BELOI V STREAM JED / EV:313.2 cn w 310 310 305 - 305 KEY IN RIP I AP ALONG TREAM 0 CULVERT- -ii-VERT BURIED 12" ANKS AND 3TREAM BOrTOM.TOP ELEV:310.5 BELOW STREAM BED HALL BE AT EXISTING TREAM BO OM ELEVATION.) z u H Z W RIPR PPAD-50'LONG Q J D BANK 3 AND STRE M BOTTOM.TOP 300 300 W u 305 305 STREAM BOTTO ELEVATION ) Y Q H u Q d 300 300 295 295 10+00 11+00 12+00 10+00 11+00 SHEET NO: STREAM "A" - IMPACT 1 STREAM "B" - IMPACT 2 E_3 ass W z L1J � 55 � lb- 55 T Q n Z N Lu r - 7/�C \ I ° 30'NEUSE RIVER STREAMp -BUFFERoho° \ \ \ / \ 20'NEUSE RIVER STREAM BUFFER ZONE 2 \ i STORMWATER MANAGMENT FACILITY 0 STREAM BUFFER ZONE 2 1MPACT _ _ _ — / \ (3,493 SF/0.080 AC) _ o `WETLAND 1 IMPACT (STORMWATER POND) \ m m °oo° —(1,756 SF/0.040 AC.) STREAM BUFFER / o o \ _ o o w c o°o o �\ ZONE 2 IMPACT / \ too ° 20'NEUSE RIVER STREAM_ (30 SF/0.001 AC)— \ BUFFER ZONE 2 �c \ \ STREAM BUFFER oLo \ ZONE 2 IMPACT / \ .. N (3,013 SF/0.069 AC) r-' J / a a o N N CHANNEL ORDINARYHIGH WATER MARK/ TOP OF BANK i 100 YEAR FLOIC&LAIN "'111 � � 30'NEUSE RIVER STREAM \ V\ ` \ CHANNEL ORDINARY _ — — — —, ✓ /� (b BUFFERZONE 1WATER N-- TOPDF BANKMA / LIMITS OF--- i� —— _ \_ _ _ `� M LLI I �i o a Q Lu Y ~ a WETLAND 1 IMPACT BUFFER IMPACTS TYPE OF AREA SQ. FT. AC. PURPOSE TYPE OF AREA SQ. FT. AC. PURPOSE WETLAND 1 IMPACTS O O O O O O 1,756 0.040 STORM POND 0 0. N/A ZONE 2 BUFFER IMPACTS 16,536 0.150 STORM POND STORMWATER CONTROL MEASURE IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(cc) 30 0 15 30 60 SHEET NO: SCALE:1"=30' E-4 PROPOSED Z STREAM BUFFER SANITARY SEWER / / (D/ // MANHOLE ZONE 1 IMPACT / / / Ln (293 SF/0.007 AC� / / / / 0 � � N N -7 r' _ / / oZLLPI w V1 N z � � o Ln 0 0- } N � o ) / STREAM BUFFER / Z ZONE 2 IMPACT 4A / 30'NEUSE RIVER </ (303 SF/0.007 AC) / / STREAM BUFFER Q / ZONE 1 STREAM BUFFER / / ZONE 1 IMPACT4A (1,352 SF/0.031 AC) / / / STREAM BUFFER / / — ZONE 2 IMPACT 46 m m D BLE QWTHINSAIARY 2 3 Q Lf) , SEWER EASEMENT) w cc ` N I . 20'NEUSE RIVER I / // STREAM BUFFER ZONE 2 I .30'CITY OF/ N RALEIGH u, r SANITARY SEWER Q cn Q -o / cn N N / EASEMENT o N I I \ / / IMITnF / / I DISTU BA CE I \ I \ CHANNEL ORDINARY HIGH (TYP.) I 1 WATER MARK/TOP OF BANK I U z u p w BUFFER IMPACTS a Q TYPE OF AREA SQ. FT. AC. PURPOSE LJJ 1,352 0.031 STORMWATER BYPASS* Y U #ZONE2R IMPACT 4A 303 0.007 STORMWATER BYPASS*293 0.007 UTILITY-NEW SEWER**R IMPACT 4B DEEMED ALLOWABLE UTILITY-NEW SEWER** *STORMWATER BYPASS IN ACCORDANCE WITH 15a NCAC 02b.0714(9)(ix) **NEW SANITARY SEWER UTILITY IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(II)-NON PERPENDICULAR 20 0 10 20 40 SHEET NO: SCALE:1"=20' E-5 ' .O0° O 0000 000000 O ---- �� O O O O�- -O-C�O�ODO 0000,r 00000 O O O O O o o o f��``''O O Of OO O O O 0 0 O os0 O O O O O OO Z O O O O O O O r O O O O O O o 0 0 0 0 6 0 6 0 0 0 0 ��0 0 0 0 �o C7 0 0 Do 0k o� AD oDo D000000b000000O Dom — o o ��o ,�0 0 0 0 0 0 0 0 0 0 -o o o o �'o d'o 0 0 0 0 0 0 0 0 o o w0 0 0 0 0 0 0 0 0 0 0 0 o o o o io 0 0� o 0 0 0 0 0 000009 Q 0 0 0o 0 60 0 0 0 0 0 0 0 09000 �5 0 0 0 0 0 0 0 0 0 0 0 o d� 0 9°0 o 0 u z Ln O O O O l0 B� O ° O O /� w N O O O O � O O Z � � o i O O O O o �O O O O�0 OlO O O O � Q N O�O O _ C OO O O O 0 �b O O O � z � � i O O O d d O 30' SE RIVER STREAM O O Q O ,{� 5/ O — / O O O O 00,E - O O O O O Ca ° 000° O O /BU_FFERZON_E 1 O O 00 000 000 Q > v, a, O° 4- O°O°O°�OC - O`�/ �° O °tOdO°O J -q J ° °o°o°o°o o°o°o°� °opop ° ° O ° Cc)"b o 0 0 , o �9�'�o z = au SSoDo 0000000000 .04 00 000 00 0°0°0° 000 0 / w sS : •'' 0000 00 0 000000g STREAM BUFFER ss _� O - O'F0°O°�O� O` �i / � ZONE2IMPACT6 s5 �' 0�O� vi0�/O — (DEEMED ALLOWABLE) ° 0 NEUSE RIVER STREAM BUFFER ZONE 2 m 'm LIMITS OF / 20'NEUSE RIVER STREAM a z Q DISTURBANC .BUFFER ZONE 2 o o cc (TYP.) / �'� 30'NEUSE RIVER STREAM / ./ �- / / / STREAM BUFFER / 1 �/ ` BUFFER ZONE 1 / / / ZONE 2 IMPACT 6 F / (DEEMED ALLOWABLE) _ STREAM BUFFER �� / _� TUR9AN N/ (T �� M J o ZONE 2 IMPACT 5 / /, ro a / (854 SF/0.196 AC.) �/ / � -`sr M o No N CHANNELTOP // STREAM BUFFER ROA OF BANK / / ZONE 2 IMPACT 6 M / (DEEMED ALLOWABLE) / STREAM BUFFER j / �:'• ''' ' / ZONE 2 IMPACT 6 (DEEMED ALLOWABLE) z Q ul z z ~ O w QJ J � � Lu = z a BUFFER IMPACTS - IMPACT 5 BUFFER IMPACTS - IMPACT 6 Y TYPE OF AREA SQ. FT. AC. PURPOSE TYPE OF AREA SQ. FT. AC. PURPOSE U 0 0.0 N/A 0 0.0 N/A a ZONE 2 BUFFER IMPACTS 854 0.196 ROADWAY ZONE 2 BUFFER IMPACTS DEEMED ALLOWABLE GRADING/REVEGETATION **ROADWAY IMPACT IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(x) **GRADING/REVEGETATION IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(i) 30 0 15 30 60 SHEET NO: SCALE:1"=30' E-6 ° STREAM BUFFER LIMITS OF / / // Lu ZONE 1 IMPACT 7B DISTURBANCE / ��_� / / / / 0 F� (DEEMED ALLOWABLE) (TYP.) / �//j/ / / O N CHANNELTO �/ / 0 w Z N OFBANK� �// STREAM BUFFER / /\�� �/ /��/ /// / / J n Cl- ZONE 2 IMPACT 76 / / / /� 0 0 � rn ___/ r �- v/ / O°op O O0 (DEEMED ALLOWABLE) �/7 / / O / k / ��� O O ° J Jp O° (� O O �30'NEUSE RIVER STREAM .100 ��o°/O BUFFER / /� � / / / Q Ogq O O O,j O o //� / STREAM BUFFER / 00O0p� / O ,� r / / / / j / /,/ / ZONE o )T.9,,' / / (1,630 SF/0.037 AC) 20 NEUSE RIVER STREAM T 'm BUFFER ZONE 2 / �'p0 / / /O°O O/ / / / / / ' 0 O C / / O0 �O4 O° , / ° 55 N/ ( / / .. N w O °o 0 C \ w v M C� ��jj O Cc) o O O O�C / \/ STREAM BUFFER —�- — O O ro / X , ZONE 2 IMPACT 7A O o O z0 "` (DEEMED ALLOWABLE) ' M Ao o o? " Crr":f�J ° 0000 0 POO� � °OV - 1p � STREAMI'BUFFER ss Ss O OO Cc) ZONE 2 IMPACT 7A s Ss 55 _ l/77 56 M M � 6_ : (DEEMED ALLOWABLE) F ss V ss ss ss � — N^ � z c� a M LLI vs __. W = Y U BUFFER IMPACTS TYPE OF AREA SQ. FT. AC. PURPOSE 0 0 N/A ZONE 2 BUFFER IMPACT 7A DEEMED ALLOWABLE GRADING/REVEGETATION* DEEMED ALLOWABLE SCM OUTFALL** ZONE 2 BUFFER IMPACT 7B DEEMED ALLOWABLE SCM OUTFALL** 0 0 SCM*** ZONE 2 BUFFER IMPACT 7C 1,630 0.037 SCM*** 30 0 15 30 60 *GRADING/REVEGETATION IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(i) SHEET NO: **STORMWATER OUTFALL IN ACCORDANCE WITH 15a NCAC 02b.0714(9)(a)(i) SCALE:1"=30' E-] ***STORMWATER CONTROL MEASURE IN ACCORDANCE WITH 15a NCAC 02b.0714 11 cc LLJ ol rn f- ./ Ln 100, 17 � 0 �, 30'NEUSE R VI ER STREAM_ ���% ­DISIU$$ANCE / -- / BUFFER ZONE1_ = /// ( ) C cT(�P- / Q 000 10'ASPHALT GREENWAY (WITHIN BUFFER ZONE 2)00 STREAM BUFFER 00 co j _ZONE2IMPACT8A / / / / cz7 0 o Yj (DEEMED ALLOWABLE) W cc � T 20'NEUSE RIVER STREAM ..' :• '::.;; r':: y. / ' 30 GREENWAY / BUFFER ZONE 2 �� STREAM BUFFER STREAM BUFFER EASEMENT`%" i' \ ZONE 2 IMPACT 8B ( ZONE 2 IMPACT 8C (DEEMED ALLOWABLE) (2,770 SF/0.064 AC) rIj / 00 I— U z u w pJ J � � BUFFER IMPACTS Lu TYPE OF AREA SQ. FT. AC. PURPOSE Y u ZONE 2 BUFFER IMPACT 8A 0 0 *GRADING/REVEGETATION a ZONE 2 BUFFER IMPACT 8B 0 0 *GRADING/REVEGETATION ZONE 2 BUFFER IMPACT 8C 2,770 0.064 **GREENWAY *GRADING/REVEGETATION IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(i) **GREENWAY IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(j).GREENWAY EASEMENT TO BE CLEARED AND RE-VEGETATED. 30 0 15 30 60 SHEET NO: SCALE:1"=30' E-g STREAM BUFFER \ \ �" ZONE 2 IMPACT 9A J�� / ��%� / W (DEEMED ALLOWABLE) / 0 \ CHANNEL ORDINARY HIGH /�/�' // / O � r, WATER MARK/TOP OF BAN �� / / / 0 0 z Ln \ \ STREAM BUFFER /' � // / / / z vi \\ \ ZONE 1 IMPACT j i�%/ / // /Z� / W o \ a � z � / \ / / / STREAM BUFFER (DEEMED ALLOWABLE /� �. / J n /// / // ZONE 1 IMPACT 9C - 0 0} N rn 20'NEUSE RIVER \ /� `�� / /��� , / �� (420 SF/0.010 AC) J -i J STREAM BUFFER O ZONE 2 - \ / 30'CITY OF RALEIGH / V // le _ - SANITARY SEWER - `'1 \✓ // \� r EASEMENT T ��Yf/ 00, 30'NEUSE RIVER ( /--��`���- /` a STREAM BUFFER \ � � � \� � J T�` � - 20 / STREAM BUFFER 30'NEUSE RIVER ZONE 1 ZONE 1 IMPACT 9A / STREAM BUFFER (DEEMED ALLOWABLE ZONE 1 / / - \ Vo / STREAM BUFFER / ZONE 2 IMPACT 9C 1 19 / LIMITS OF // (6,499 SF/0.149 AC) 1 TEMPORARY DISTURtSANCE // / // � } } i STREAM CHANNEL IMPACT (TYP.) , � / � /�i� � �I 1 m co ��i 18 / z z ±232 SF(30 LF) 30'GREENWAY / N o z o EASEMENT I / W m Z / NEUSE RIVER / 17 / i STREAM BUFFER ZONE2 21 STREAM BUFFER / 1 1 / 16 w v u; o ZONE 1 IMPACT 9C I _ / a rn Q (101 SF/0.002 AC) \ /� / o N STREAM BUFFER 22 N i ZONE 2 IMPACT 9A — -' \ �\ // / 1/ / 15 i (DEEMED ALLOWABLE) \ // � 1 / STREAM BUFFER J 1 i ZONE 2 IMPACT 9B (1,069 SF/0.025 AC.) — / GREENWAY r. r M ,F�01.' % FSv�,, +- ::FM��=r?.•+:. STREAM BUFFER v (WITHIN BUFFER \ � — � � �\ � � • .. �..� ,. / ZONE 1 IMPACT 9B ZONE 2) ,'` • (120 SF/0.003 AC.) \ � 4- 24 \ G go 25 \\ / / / , F. / 5/ 5 M�M MEW O W 0 J J a Lu BUFFER IMPACTS Y u TYPE OF AREA SQ. FT. I AC. PURPOSE a DEEMED ALLOWABLE UTILITY-NEW SEWER* ZONE 2 BUFFER IMPACT 9A DEEMED ALLOWABLE UTILITY-NEW SEWER* STREAM A CHANNEL IMPACTS 120 0.003 UTILITY-NEW SEWER** TYPE OF AREA SQ. FT. AC. LENGTH ZONE 2 BUFFER IMPACT 9B 1,069 0.025 UTILITY-NEW SEWER** 0 0.0 0 LF 521 0.012 GREENWAY*** STREAM"A"-TEMPORARY 232 0.0053 30 LF ZONE 2 BUFFER IMPACT 9C 6,499 0.149 GREENWAY*** STREAM "A"-PERMANENT/NO PERMANENT LOSS 0 0.0 0 LF *NEW SANITARY SEWER UTILITY IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(kk)-PERPENDICULAR 40 0 20 40 80 **NEW SANITARY SEWER UTILITY IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(II)-NON PERPENDICULAR SHEET NO: ***GREENWAY IN ACCORDANCE WITH 15a NCAC 02b.0714(11)(j).GREENWAY EASEMENT TO BE CLEARED AND RE-VEGETATED. SCALE:1"=40' E-9 Compliance Certification Form File Number: SAW-2022-01734 County: Wake Permittee: DRB Group North Carolina, LLC, Ric Rojas Project Name: Weldon Subdivision Date Verification Issued: 4/29/2024 Project Manager: Matthew Martin Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS Wilmington District Attn: Matthew Martin Raleigh Field Office 3331 Heritage Trade Drive Suite 105 Wake Forest, North Carolina 27587 or matthew.k.martin@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work, and mitigation (if applicable), authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit including any general or specific conditions. Date Authorized Work Started: Completed: Describe any deviations from permit (attach drawing(s) depicting the deviations): *Note: The description of any deviations on this form does not constitute approval by the Corps. Signature of Permittee Date