Loading...
HomeMy WebLinkAbout20240625 Ver 1_ePCN Application_20240424DW R DHlsloo of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) October 2, 2023 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity? Yes No BIMS # Assigned Version# * 20240625 1 Is a payment required for this project?* No payment required What amount is owed?* Fee received $240.00 $570.00 Fee needed - send electronic notification $323.00 $767.00 Reviewing Office* Select Project Reviewer* Raleigh Regional Office - (919) 791-4200 Joseph Myers:joseph.myers Information for Initial Review la. Name of project: Wilson's Mills High School la. Who is the Primary Contact?* Wyatt Brown 1b. Primary Contact Email:* brownenvgrp@gmail.com Date Submitted 4/24/2024 Nearest Body of Water Neuse River Basin Neuse Water Classification WS-IV:NSW Site Coordinates Latitude: 35.57380 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Johnston Is this a NCDMS Project Yes No Longitude: -78.32681 1c. Primary Contact Phone:* (919)524-5956 Is this project a public transportation project?* Yes No 1a. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 39 - Commercial/Institutional Developments le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: JOHNSTON COUNTY BOARD OF EDUCATION 2b. Deed book and page no.: 06631,0211 2c. Contact Person: Brooks Moore 2d.Address Street Address PO BOX 1336 Address Line 2 city SMITHFIELD Postal / Zip Code 27577-1336 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country US Yes No Yes No 2e. Telephone Number: (919)934-6031 2g. Email Address:* brooksmoore@johnston.kl2.nc.us 4. Agent/Consultant (if applicable) 4a. Name: Wyatt Brown 4b. Business Name: Brown's Environmental Group, Inc 4c. Address Street Address 242 Batten Farm Road Address Line 2 City Selma Postal / Zip Code 27576 4d. Telephone Number: (919)524-5956 4f. Email Address:"` brownenvgrp@gmaii.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Wilson's Mils 2. Project Identification 2a. Property Identification Number: 260600-05-3156 2c. Project Address Street Address 517 TALTON FARM RD Address Line 2 City SMITHFIELD Postal / Zip Code 27577 3. Surface Waters 3a. Name of the nearest body of water to proposed project: " Neuse River 3b. Water Resources Classification of nearest receiving water: WS-IV;NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202011104 4. Project Description and History 2f. Fax Number: State / Province / Region NC Country US 4e. Fax Number: 2b. Property size: 216.840 State / Province / Region NC Country US 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The property is being used as row crop farm land and the east side border is the Neuse River. The general land use in the vicinity is farm land. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown a 4f. List the total estimated acreage of all existing wetlands on the property: 34.62 4g. List the total estimated linear feet of all existing streams on the property: 5110.0 4h. Explain the purpose of the proposed project:" The purpose of the project is to provide a high school for the growing population of Wilsons Mills. The PCN is for a required crossing for emergency access to the school and ballfields. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The project is to construct a high school on row crop farm land. The school will be constructed on the open land. Very few trees will need to be removed. Bull dozers and motor graders will be used to grade the land. The storm water basins will be dug with track hoes. The school will be constructed by a building company. The parking lots will be asphalt. I'm not aware of any indirect indirect impacts associated with this project. The crossing will be installed by track hoe, the wetlands will be marked on the plans and in the field by silt fence. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No O Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2023-00680 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Wyatt Brown Agency/Consultant Company: Brown's Environmental Group, Inc Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR 11/9/2023, Corp Matt Martin 1/6/2023 Charles Pender, Neuse Buffer, Johnston County Storm Water 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type* (?) 2c. Type of W. * 2d. W. name 2e. Forested * 2f. Type of Jurisdicition * ?) �2g. Impact area * E culvert P Small -Basin Wetland Wetland B t Both 0.010 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.010 2g. Total Wetland Impact 0.010 2i. Comments: This impact includes the small riprap apron. The engineer decided not to place the stone flush with the channel bottom since the total impact is so small and the riprap apron is very small (84 sgft, 0.002 acres). E. Impact Justification and Mitigation 6 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Care was taken in design to avoid impacts to jurisdictional waters. The only impact is a required crossing by the Fire Marshall for an emergency access. The required crossing impact was minimized by narrowing the top width of the gravel drive to 20 ft wide. All jurisdictional wetlands will be shown on the construction plans with notes to avoid contact with them and protected with silt fence. Also the culvert will replace an existing culvert already there. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The wetlands will be protected with silt fencing in the field. The construction entrance will be installed in one day and the work will not be allowed in wet weather. the crossing will be stabilized with a temporary ground cover at the end of the work day. An approved Sediment and Erosion Control Plan will be implemented in the field and inspected by the construction [personnel and by the government inspectors. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Impact less than 0.10 acres F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30 % nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government stormwater program you are using. Town of Wilson Mills Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? * Yes No 3b. If you answered "no," provide a short narrative description. To the best of my knowledge this is the only project planned for this property. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?" Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is another Federal agency involved? Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage -Letter attached IPac- 1)Tricolored Bat -Proposed Endangered, very few to no trees to be removed, No affect. 2) Red -cockaded Woodpecker- no old growth pines, little to no tree removal, No affect. 3)Neuse River Waterdog-Threatened, No stream impact, No affect 4) Carolina Madtom-"prefer clean water with permanent flow and are not tolerant of siltation and turbidity" No work in stream, No affect. This site has been agricultural for years, chemical, fertilizer and turbid waters have damaged any streams on the property. No affect. 5) Atlantic Pigtoe-Threatened, No work in stream, Streams on project not proper habitat. No Affect. 6) Dwarf Wedgemussel-"To survive, they need a silt -free, stable streambed and welloxygenated water free of pollutants, no work in stream, no stream habitat, No affect. 7) Green Floater -Proposed Threatened. 7) Monarch Butterfly -Candidate, No Milkweed observed , No habitat observed. No affect. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Website above, map attached 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8c. What source(s) did you use to make the floodplain determination?" Website above Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Wilson Mills High School PCN Package.pdf 85.43MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Wyatt Brown Signature pwroti.- Date 4/24/2024 R