Loading...
HomeMy WebLinkAboutSW3231102_Supplemental Info Review_20240430 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 4/30/2024 3:12:12 PM (Supplemental Submittal) Accept by Kaitlin Peck 4/30/2024 3:13:13 PM (Supplemental Info Submittal) • The task was assigned to DEMLR Post-Construction Team 4/30/2024 3:12:13 PM • The task was assigned to Kaitlin Peck by round robin distribution 4/30/2024 3:12:13 PM =DEQ • Submittal from 4/30/2024 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW3231102 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Heritage Building Company Owner/Operator* Darren Warren County: Rowan Submitter Name:* Darion George Who is submitting this information? E-mail Address:* dgeorge@ravianeng.com Phone Number* 6186384788 Additional E-mail for (Optional) Submittal Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Plansheet-SCM Detail File Upload Click the upload button,or drag and drop files to attach SCM Plan Set.pdf 1022.66KB Only PDF files are accepted. File Type* Soils/Geotechnical Report File Upload Click the upload button,or drag and drop files to attach 49-22594-200 Peach Orchard Road-SHWT 538.77KB Report.pdf 15795-DRI Testing Letter.pdf 702.63KB Only PDF files are accepted. File Type* Design Calculations File Upload Click the upload button,or drag and drop files to attach Annual Runoff Volume-BUA.pdf 108KB Bioretention Area-10-yr.pdf 58.6KB Bioretention Area-25-yr.pdf 59.34KB Bioretention Area-100-yr.pdf 58.6KB Only PDF files are accepted. File Type* Response To Comments File Upload Click the upload button,or drag and drop files to attach Comments Response.pdf 140.5KB Only PDF files are accepted. File Type* Supplement-EZ Form File Upload Click the upload button,or drag and drop files to attach SuppEZ_Signed.pdf 323.49KB Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: Attn: Jim Farkas State Stormwater Engineer DEMLR Post-Construction Stormwater Program * I By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; o I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Darion George Signature: ,0,?moor C;)wt�,v Date Submitted: 04/30/2024 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW3231102 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jim Farkas Any Comments or Added Info for CO Staff Reviewer? Review Date* 04/30/2024