Loading...
HomeMy WebLinkAbout20051967 Ver 2_Triage Comments_20060613DWQ# O .~- ~ `~ 6 r~ Detail Incomplete Date ~ " ~.3 -'~ ~v' ~ ~~ ~~~ Please provide a location map for the project' '~ ~~~ h ~~ Please show all stream impacts including all fill slopes, dissipaters, and bank sty Please show all wetland impacts including fill slopes on the site plan. Please indicate all buffer impacts on the site plan. ~Piease indicate proposed lot layout as overlays on the site plan. / ^ Please indicate the location of the protected buffers es overlays on the site plan. ^ Please locate all isolated or non-isolated wetlands, streams and other waters of the ] Please provide cross section details showing the provisions for aquatic life passage. Please locate any planned~sewer lines on the site plan. Please provide the location of any proposed stormwater management practices as Please provide detail for the stormwater management practices as required by GC ! S k~v C~,l~.~~i (ti ~ Fj Please open-!!p'!!tb percent of project imperviousness area based on the estimated t ~1 Please indicate all stormwat ~outfalls on the site phut. Please indicate the diffuse flow provision measures on the site plan. Please indicate whether or not the proposed impacts already been conducted. ance, and/or Minimizatlo t Provided ~4G~ lt~ ~ P k, ~~ c/hn ~.~ ~ .~ ~ f/a~s~w.~--~~ r~ ~ ¢h Thee abeled as on the plena does not appear to be necessary. Please information as to why it is necessary for this project. This Office believes that the labeled on the plans as . Please revise the plans to avoid the impacts. can be moved r, D This Office believes that the .labeled on the plans as can be moved or . Please revise the plena to minimize the impacts. The atormwater discharges at the location on the plans labeled will not provid . Please revise the plans and provide calculations to show that diffuse flow will is not possible to achieve diffuse flow through the entire buffer then it may be necessary practices that remove nutrients before the stormwater can be discharged through the buff The application fee was insufficient because over 150 feet of stream and/or over 1 acre , provide $ .This additional fee must be received before your application can be Please complete Sec :, on(s) on the application. Please provide a signed copy of the application. Please provide copies of the application, copies of the site plans and other Please submit electronic CAD files showing , via email to ian.mcmillan~ of compensatory mitigation is required for this project. Please prow plan must conform to the requirements in 15 A NCAC 2H .0500 and must be appropriate Please indicate which 404 Permit the USACE would use to authorize this project. Reviewed: ~C~~~ n on the site plan. ~~ ~,~ s ~-..~-~-~ l~-yw~.~ ~ ~~ /1.c-~ ~-o ~9 h,TtiJ ?' /nti-a'`J veer s~a~w~s ar.~.rt.._ ~~ ~ `°~ as overlays on the site plan. ~~ o.~s ~ by cc .~~ f1; ! s b - / p~ conditions. ', s~ ~ v~ ~c~ provide additional to avoid the impacts to the ~nfigured to minimize the impacts to the lffuse flow through the buffer because achieved through the entire buffer. If it provide stormwater management 'impacts were requested. Please information, and CD: a compensatory mitigation plan. The the type of impacts proposed.